    Current Challenges Facing the Dispute Review Board (DRB) Process

    By Hugh E. Cronin, John Ramage

    The recommendations resulting from a Dispute Review Board (DRB) hearing of a contract dispute are being challenged more and more frequently. This paper explores possible causes based on the authors’ e

    Jan 1, 2003

  • SME-ICGCM
    Variation of Horizontal Stresses and Strains in Mines in Bedded Deposits in the Eastern and Midwestern United States (18e10a78-83b8-48d9-ab61-d01619f77fb4)

    By Dennis Dolinar

    In general, the direction of the maximum horizontal stress in the eastern United States is fairly well defined. However, the variation of the magnitudes of the horizontal stresses is not very well und

    Jan 1, 2003

  • AUSIMM
    Surface Reactivity of High-Sulfide Copper Mine Tailings Under Shallow Water Cover Conditions

    By A D. Paktunc

    The surface reactivity of underwater deposited, high-sulfide copper mine tailings was evaluated under fresh and saline water cover conditions by measuring the surface and pore water quality as a funct

    Jan 1, 2003

  • TMS
    Thermodynamic Investigation of the Stability of HgTe as Related to the Recovery of Mercury from Copper Smelter Acid-Plant Sludge Using a Vacuum Retort Reactor

    By Devon A. Hannan

    Thermodynamic modeling calculations were undertaken for the recovery of mercury from HgTe using a vacuum retort reactor. However, discrepancies were noted in the available thermodynamic data which int

    Jan 1, 2003

  • AUSIMM
    Environmentally and Publicly Acceptable Options for Remediation at Tui Mine Site, Te Aroha

    By J Webster-Brown

    The Tui Mine is an abandoned Pb-Zn mine giving rise to water quality problems in the Te Aroha region of Coromandel, New Zealand. When sampled in September 2002, for example, both the Tui and Tunakohoi

    Jan 1, 2003

  • SME
    Technology News – Proper Lubrication Lengthens Equipment Life

    By Reginald Dias

    Mining operations take a tremendous toll on equipment, operating in difficult conditions day after day. Owners and operators cannot make the job any easier, but they can give their equipment an advan

    Jan 1, 2003

  • AUSIMM
    CAES System at KCGM ù Four Years On

    By L O. ÆNeill, J Bebek

    When Kalgoorlie Consolidated Gold Mines (KCGM) purchased its fleet of 18 CaterpillarÆs dump trucks in 1999, as part of its change to owner operated mining, five CaterpillarÆs Computer Aided Earthmovin

    Jan 1, 2003

  • AUSIMM
    Lihir Gold Five Years On ù Maximising Throughput and Capital Utilisation

    During the first five years of operation, the Lihir gold mine has steadily increased plant throughput rate to over 4 Mtpa, well above the original design capacity of 2.8 Mtpa. Understanding how future

    Jan 1, 2003

  • AUSIMM
    Acid Rock Drainage Treatment Technologies ù Identifying Appropriate Solutions

    By N Murphy and, S Santomartino, M Cramer

    Acid rock drainage (ARD) can have detrimental effects on mining infrastructure, water reuse options and environmental discharge. As a result, some form of short- or long-term treatment is required at

    Jan 1, 2003

  • AUSIMM
    Metallurgical Processing Plant Ramp-Up Periods ù How to Reap the æRewardsÆ

    Fundamentally, the development of a minerals processing project is a very risky enterprise. Most mining companies do not have sufficient financial resources to undertake significant projects and hence

    Jan 1, 2003

  • AUSIMM
    Flotation Circuit Analysis at WMC Ltd Olympic Dam Operation

    By P Wigley

    New methods of analysing and modelling flotation circuits have been developed as part of the AMIRA P9 mineral processing research project. A study using these techniques was conducted on the Olympic D

    Jan 1, 2003

  • SME
    United Nations’ Emergency Preparedness Program Available to Mining Industry

    The Awareness and Preparedness for Emergencies at the Local Level (APELL) program is a process that helps people prevent, prepare for and respond appropriately to accidents and emergencies. APELL was

    Jan 1, 2003

  • SME
    Environmental Design for Growth: Garfield Interceptor Tunnel Project

    By Victor M. Mercado, Jay B. Shah

    Spalding DeDecker Associates, Inc. (SDA) designed a tunnel project that fulfilled the Sustainability Objectives of Social Equity, Environment, and Economics. The project translated the principles of S

    Jan 1, 2003

  • TMS
    Production Of Elemental Sulphur From Non-Ferrous Smelter Gas (Keynote) (0da863a0-3b55-4ebb-968f-68550bd51096)

    By Takahiko Okura

    Most non-ferrous raw materials are associated with sulphur. To extract the metals, the sulphur is recovered typically as Sulphuric acid or liquid S02. On the other hand, natural gas may contain over 2

    Jan 1, 2003

  • AUSIMM
    The Practical Implementation of Dewatering and Depressurisation in Large Open Pits

    All large open pits in Australia have been mined, or are planned to be mined well below the local water table. This raises several issues that impact on mine safety, mining costs and regulatory approv

    Jan 1, 2003

  • SME
    Deep Shaft Construction in Unconsolidated Material and Water-Bearing Formations

    By Del Brock, Dan Wooton

    The design/build of two adjacent vertical mine shafts in difficult ground conditions at a mining complex in the midwestern United States required innovative construction techniques. Construction of th

    Jan 1, 2003

  • CIM
    CIM Estimation of Mineral Resources & Mineral Reserves Best Practice Guidelines (2003)

    "Adopted in 2003, theses guidelines are intended to assist the Qualified Person(s) in the planning, supervision, preparation and reporting of mineral resources and mineral reserve estimates. The repor

    Jan 1, 2003

  • AUSIMM
    Characterising the In Situ Conditions Within Rehabilitated Spoils at South African Opencast Collieries

    By F D. I Hodgson

    Twenty-seven observation test pits were excavated at four different spoils dumps at three collieries in the Witbank Coalfield. The holes were dug into the upper three metres of the spoils to ascertain

    Jan 1, 2003

  • SME-ICGCM
    Premature Rock Bolt Failure Through Stress Corrosion Cracking (SCC)

    By Bruce Hebblewhite

    An ACARP-funded industry research project in Australia recently investigated the problem of premature rock bolt failures in underground coal mines. The project carried out limited sampling from 9 diff

    Jan 1, 2003

  • TMS
    Application Of Molten Salts In Metals Production (Keynote)

    By Brajendra Mishra

    Molten Salt electrolytic processes offer unique opportunities to extract and refine metals where gaseous or metallothemlic reduction, hydrometallurgical extraction and aqueous electrolytic methods are

    Jan 1, 2003