Search Documents

  • SME
    The Madrid Renewal Inner Ring Calle 30 with the Largest EPB Machines—Planning and Results

    By Enrique Fernandez

    M-30, Madrid’s inner ring, covers 42 sq km of the city centre where one million people reside. It was constructed in several phases during the sixties and the eighties. The design criteria applied to

    Jan 1, 2007

  • CIM
    New technology for the abatement of SO2 in nonferrous pyrometallurgical processes by a dry limestone scrubber

    By F. Parada, R. Parra

    "The neutralization process of SO2 from coal burning plants is a well-defined technology using limestone to form CaSO4 according to the following reaction: CaCO3 + SO2(g) + 1/2O2(g) = CaSO4 This paper

    Jan 1, 2007

  • SME
    Tunneling Through Mountain Faults

    By Don W. Deere

    Faults under high rock cover represent some of the most severe ground conditions a Tunneler can encounter. High ground water pressures and flows are usually associated with mountain faults. Ground beh

    Jan 1, 2007

  • CIM
    Efficient Enhanced Gravity Separation Using the Kelsey Centrifugal Jig

    By Peter Barker, Terry Jones

    "The Kelsey Centrifugal Jig (KCJ) utilizes the application of centrifugal force (and the resultant enhanced gravitational field) to conventional jigging technology principles to successfully and effic

    Jan 1, 2007

  • SAIMM
    Thorium In High-Titania Slag - Introduction

    By J. Nell

    Heavy mineral deposits often contain relatively high levels of radioactive elements (thorium and uranium in particular).It is difficult to obtain clean separation of ilmenite and monazite (the main im

    Jan 1, 2007

  • CIM
    Improvement of Mass and Value Balance data from the Statistical Benchmark Model

    By Cecilia Arrue, Dominic Fragomeni, N. O. Lotter

    "A statistically designed benchmark mill survey was carried out in July 2005 at the Kidd Creek Concentrator, D Division circuit, which processes Ni/Cu ore from the Montcalm deposit. A structured stati

    Jan 1, 2007

  • SME
    Design Principles for Soft Ground Cutterheads

    By Werner Burger

    The last decade has witnessed a rapid development and application of slurry and EPB type tunnel boring machines. Both soft ground types are able to excavate tunnels in unstable ground conditions below

    Jan 1, 2007

  • SME
    Permitting New Tunnels in Southern Ontario, Canada—Panacea, Pragmatism, and Professionalism

    By Adrian Coombs, Paul Magowan, Derek Zoldy

    Continued development and intensification are fuelling the urgent need for new trunk infrastructure within The Regional Municipality of York and throughout the Greater Toronto Area. Permitting of thes

    Jan 1, 2007

  • NIOSH
    Programmable electronic and hardwired emergency shutdown systems: A quantified safety analysis

    By John J. Sammarco

    Abstract- Emergency shutdown systems (ESDs) for mining machinery provide critical functions to safeguard miners. Traditionally, ESDs were realized with simple hardwired circuits; today, there is a gro

    Jan 1, 2007

  • AUSIMM
    The Geomorphology of the Channel Iron Deposit in Bungaroo Valley - The Formation of an Irregular Basal Topography and its Impacts on Resource Recovery

    By L Terrusi

    The Bungaroo Valley hosts a concealed Tertiary channel iron deposit (CID) along a 17 km stretch of its length. Bungaroo Valley is approximately 0.5 km wide upstream at its easternmost extent, and 3.5

    Jan 1, 2007

  • DFI
    R C Harris Water Filtration Plant Expansion - Excavation Support Design, Installation and Performance

    By Michael Cianchetti, Nadir Ansari, Matthew Janes

    "PROJECT DESCRIPTIONThe R C Harris Filtration Plant underwent an expansion to install an underground sludge treatment capability consisting of a series of underground tanks within stepped excavations

    Jan 1, 2007

  • CIM
    Iron Control in Mineral Processing (2fd76e37-d28e-4a6e-89ca-f817ec26c15b)

    By J. E. Nesset, S. R. Rao, J. A. Finch

    "For base metal sulphides, iron rejection starts in mineral processing. This review focuses on changes in plant practice specifically to improve iron sulphide rejection by control of contaminant ion e

    Jan 1, 2007

  • AUSIMM
    Alliance Type Contracts

    When it comes to structuring major mining contracts, the two most widely adopted formats are æmeasure and valueÆ and æcost-plusÆ. A problem with both of these formats is the difficultly of aligning th

    Jan 1, 2007

  • SME
    Tunneling Under Glaciers Galore Creek Mine Access Tunnel, BC, Canada

    By Dean Brox, Jason Morrison, Peter Procter

    The Galore Creek Mine project is one of the newest major mining projects underdevelopment in Canada. The project is located in a very remote area of northwester British Columbia and is being developed

    Jan 1, 2007

  • SME
    The Effect Of Phytotechnic Treatment On Establishment And Survival Of Different Grass Species And Cultivars At A Limestone Quarry

    By E. M. Abraham

    The establishment and survival of different grass species and cultivars on various phytotechnic treatments at a limestone quarry was studied. The treatments applied were: a) bare soil, b) bentonite, c

    Jan 1, 2007

  • SME
    Developing Gold Fields’ La Cima Cerro Corona Project in Peru

    By Richard W. Graeme, James J. Komadina

    Gold Fields acquired an option to purchase the Cerro Corona project, located in Hualgayoc, Cajamarca Department, Peru, in December 2003. In January 2006, the option was taken up and the transaction c

    Jan 1, 2007

  • CIM
    Spheroidization of a medium carbon HSLA fastener-grade steel

    By P. P. Sinha, D. N. Bhatia, B. R. Ghosh, R. K. Gupta

    Medium carbon, low alloy, high-strength steels containing Ni, Cr, and Mo are used for the fabrication of various types of high-strength fasteners required for launch vehicle structures. Cold heading p

    Jan 1, 2007

  • DFI
    Piling Framed Tie Down Concrete Retaining Wall (4e2f4102-889f-44e0-a228-adb5cc7c450f)

    By Saieb Haddad, Henry Pate

    "Building retaining walls in an urban area is becoming more diffi cult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for in

    Jan 1, 2007

  • CIM
    Validation of High Fidelity Simulation Wear Predictions in Various Types of Mineral Processing Equipment

    By John A. Herbst, Xiangjun Qiu

    "Prediction of wear on a microscale level in mineral processing equipment turns out to be a challenging undertaking. This is particularly true for cases in which the objective is to use such predictio

    Jan 1, 2007

  • SME
    Moving Forward on New York’s Second Avenue Subway

    By David Caiden, Geoffrey Fosbrook, Jaidev Sankar, Donald Phillips, Jon Hurt, Anil Parikh

    This paper will cover the progress being made on Phase 1 of New York’s Second Avenue Subway line. It will include a description of construction progress on the first contract to be let, which consists

    Jan 1, 2007