Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Hand‑Arm Vibration Controls for Jackleg Rock Drills: a Pilot Study Assessing Ergonomic Hazards - Mining, Metallurgy & Exploration (2021)By Scott Rosenthal, Dave Gilkey, Theresa Stack, Daniel Autenrieth, Ciara Kremer
Jackleg drill operators are exposed to harmful levels of hand-arm vibration (HAV). Anti-vibration handles and gloves provide modest reductions in HAV exposures and forearm muscle exertion from the use
Jul 12, 2021
-
Hanging - Wall Control at WillroyBy D Marshall
The sub-level blasthole benching method of mining has been proved to be economical at Willroy Mines. How-ever due to the nature and attitude of the wall rock, this method is susceptible to serious han
Jan 1, 1963
-
Hangingwall sloughing mechanism in open stope miningBy J. Ran
"Hangingwall sloughing is the major cause of unplanned stope dilution in open stope mining. Understanding the hangingwall sloughing mechanism can guide the stope design in minimizing the unplanned dil
Jan 1, 2002
-
Happy Days Are Here AgainBy AIME AIME
NEW YORKERS look forward to the third week of February as the time of the year when they can count on seeing their friends-from far and near gathered in the city for the four-day annual session of the
Jan 1, 1931
-
Hard Alloy Increases Dredge Pump LifeBy George T. Bator
If confronted with the problem of pumping a mixture of slime-free sand, gravel and boulders up to six in. in diameter, at the rate of 175 tons per hr in one single-stage pump against a static head of
Jan 1, 1950
-
Hard Alloys Go Underground ? Tungsten Carbide Insert Bits - a Revolutionary Development in Rock DrillingBy Sheldon P. Wimpfen
EVERYWHERE in mining circles the talk is of this new development of hard faced or insert bits which hints of many changes to come in mining practice and rock drill equipment. In the past fifteen years
Jan 1, 1947
-
Hard Automation Trends in Australian Underground Coal MinesBy Stephen van Duin
As productivity in coal extraction demands increase in underground coal mines, the industry is faced with finding new ways to support production without jeopardising safety. In modern mines the capaci
Aug 1, 2013
-
Hard Magnetic Properties of Quenched Sm-Fe-N PowdersBy T. Iriyama, Y. Fujita, R. Omatsuzawa, T. Nishio, N. Okochi
Sm-Fe-N hard magnetic materials are good candidates for high performance bonded magnets. Rapid-quenching method should be highly favorable for the fabrication of isotropic magnet powder with high coer
Jan 1, 2000
-
Hard Rock Blasting in an Underground Coal MineBy Mark D. Kirkbride
This paper outlines the process for designing a hard rock blast in an underground coal mine. The coal mine is located in Western Kentucky and operates four continuous miner units at 7 unit-shifts per
Jan 1, 1999
-
Hard Rock Cutting And The Development Of A Continuous Mining Machine For Narrow Platinum Reefs - IntroductionBy R. G. B. Pickering
The hard rock gold and platinum mines in South Africa have seen little development in the technology of mining. Holes are still drilled in the rock?though the latest water hydraulic rockdrills will co
Jan 1, 2002
-
Hard Rock Mining - Better Fragmentation Through Teamwork At The Dos Pobres Mine In Safford, AZBy D. Brandt
The Dos Pobres Mine is a copper oxide heap-leach operation located near Safford, AZ. Mine production is 163 kt/d (180,000 stpd) with a stripping ratio of 2:1. During the startup phase of the mine, th
Jan 1, 2011
-
Hard Rock Pressure Tunnel Final Lining Design Guide Summary - NAT2022By Wern-ping N. Chen
Pressure tunnel includes water-supply tunnels and tunnels for hydroelectrical power plants. Their design principles are different from those of water/wastewater/conveyance and transportation tunnels.
Dec 1, 2022
-
Hard Rock Tabular Excavations: Historic Rock Engineering Solutions and Future ChallengesBy D. F. Malan
"This document highlights some of the topical problems associated with the design and support of deep tabular excavations in hard rock. The displacement discontinuity boundary element method has been
Jan 1, 2015
-
Hard Rock TBMs—The Experience of Brenner Basis Tunnel, Construction Lot Mules 2-3, for the Evaluation of Risk Prediction Tools - RETC2023By A. Mei, F. Amadini, F. Cernera, D. Baliani, A. Flor, M. La Morgia, F. Sassi
The risk of TBM jamming because of squeezing rock mass or excessive caving (instability of the cavity) conditions is always a focal point while boring long and deep tunnels with shielded TBMs. Mechani
Jun 13, 2023
-
Hard Rock Tunnel Boring in Challenging Conditions at the Jefferson Barracks Tunnel - NAT2022By Doug Harding
The Metropolitan St. Louis Water District’s Project Clear is a 28-year program targeting wastewater capacity throughout St. Louis, MO. The extensive program includes the Jefferson Barracks Tunnel, run
Dec 1, 2022
-
Hard rock tunnel boring, cutting, drilling and blasting: rock parameters for excavatabilityBy K. Thuro, R. J. Plinninger
ABSTRACT: Determining tunnel stability is a key issue during preliminary site investigation. In contrast, problems of excavatability have been largely ignored. While the choice of an economic tunnelli
Jan 1, 2003
-
Hard-Rock Mining Apprenticeship Program Launched at Kennecott's Tintic Mines DivisionBy John D. Weibmer
A strong step towards acknowledgement of mining as a skilled trade has been taken by the Tintic Division of Kennecott Copper Corp. In May 2 ceremonies, a pilot program was signed into force which, pos
Jan 6, 1977
-
Hard-Rock TBM Cutter Life Evaluation: A Case Study of NS3 Project Mixshield TBMBy Dae Young Kim, Sim Bo Kyung, Ebrahim Farrokh, Ki Chang Hyun
"TBM cutter life evaluation in abrasive granitic rocks is a very important issue, especially in pressurized face tunneling with mixshield TBM for which the planning of costly interventions becomes cru
Jan 1, 2016
-
Hardenability And Quench CrackingBy L. D. Jaffe, John H. Hollomon
Fox many steel parts it is desired to obtain the maximum toughness consistent with the strength required by the mechanical design. It is generally recognized that the greatest toughness at any given s
Jan 1, 1946
-
Hardenability Calculated From Chemical CompositionBy M. A. Grossmann
THE hardenability of most steels can be predicted within 10 to 15 per cent provided the complete chemical composition is known, including "incidental" elements; and provided the as-quenched grain size
Jan 1, 1942