Search Documents

  • CIM
    Flowsheet Development for the Extraction of Rare Earths Using Mintek’s Pyearth™ Process

    By I. Thobadi, C. Pawlik, K. Bisaka, S. Mokoena, M. Erwee

    The PyEarth™ process developed at Mintek has been demonstrated successfully at pilot scale. Nine tons of ore containing 2.3 mass % of total rare earth oxides (TREO) from a dormant mineralogically comp

    Jan 1, 2017

  • CIM
    Flowsheet Development for the Hypogene Geomet Unit in the Ivanplats Kamoa Copper Project

    By S. R. Amos, N. O. Lotter, A. L. Hannaford, J. F. Oliveira, D. W. Broughton

    "Ivanplats Ltd appointed Xstrata Process Support to perform the flowsheeting development work for their hypogene and supergene geomet units of the Kamoa Copper deposit, located in the Democratic Repub

    Jan 1, 2013

  • SAIMM
    Flowsheet development for the Sukari gold project in Egypt

    By M. Rhodes

    The Sukari project, which is owned by Centamin Egypt Ltd, is located in southern Egypt, 770 km south of Cairo but close to the Red Sea. The project is the first new gold development in Egypt and was c

    Jan 1, 2009

  • CIM
    Flowsheet Development for Thompson Ultramafic Low-Grade Nickel Ores

    By J. A. Bos, Z. Dai, P. Quinn, A. Lee

    A flowsheet is being developed for processing Thompson ultramafic low-grade nickel ores. This type of ore is characterized by high content of serpentinized magnesium silicates which generate slimes du

    Jan 1, 2009

  • IMPC
    Flowsheet Development Of A Nickel Sulfide Deposit At Vale?s Center Of Mineral Development

    By Aline Tavares

    This paper describes the investigative studies carried out at Vale´s Center of Mineral Development (CDM) for a nickel sulfide deposit aiming to develop an adequate flotation flowsheet. The CDM facilit

    Sep 1, 2012

  • SAIMM
    Flowsheet development work for re-opening of Prieska Cu-Zn Mine, J. Taguta and M. Bryson

    By M. Bryson, J. Taguta

    The Prieska deposit, mined between 1971 and 1991, is one of the world’s top thirty volcanogenic massive sulphide (VMS) base metal deposits. The Prieska Copper Mine in the Northern Cape Province was cl

    Jan 1, 2020

  • CIM
    Flowsheet Development, Commissioning and Start-up of the Voisey’s Bay Mill (33ff6fb1-ab13-4641-96a6-597d0ce850b9)

    By Manqiu Xu, Joe Holmes, Peter Wells, Peter Langlois, Germain Labonté, Jim Barrett

    "The flowsheet for the Voisey’s Bay mill had to meet the challenge of processing an ore containing high pentlandite and chalcopyrite values in a largely pyrrhotite/troilite matrix. In the 1994-97 peri

    Jan 1, 2007

  • CIM
    Flowsheet Development, Commissioning, and Start-Up of the Voisey’s Bay Mill (2943ae37-09c1-4777-81e1-21dde3685311)

    By P. Langlois, G. Labonté, J. J. Barrett, J. Holmes

    "The Voisey’s Bay mill processes a high-grade pentlandite and chalcopyrite ore in a largely pyrrhotite/troilite matrix. From 1994 to 1997, circuit development focused on making a 14% nickel concentrat

    Jan 1, 2017

  • TMS
    Flowsheets Development For Recovery Of Non Ferrous Metal Values From Secondary Resources By Solvent Extraction

    By T. K. Mukherjee

    The importance of the processing of secondary resources such as solid industrial wastes and liquid effuents as well as byroducts for the recovery of the associated metal values hardly needs any elabor

    Jan 1, 1996

  • TMS
    Flowsheets Development For Recovery Of Non Ferrous Metal Values From Secondary Resources By Solvent Extraction (39d0eedf-59da-482f-93e2-7ab07106593a)

    By T. K. Mukcherjee

    The importance of the processing of secondary resources such as solid industrial wastes and liquid effluents as well as byroducts for the recovery of the associated metal values hardly needs any elabo

    Jan 1, 1996

  • TMS
    Flowsheets Development for Recovery of Nonferrous Metal Values from Secondary Resources by Solvent Extraction

    By T. K. Mukherjee, C. K. Gupta

    "The importance of the processing of secondary resources such as solid industrial wastes and liquid effluents as well as byroducts for the recovery of the associated metal values hardly needs any elab

    Jan 1, 1996

  • AUSIMM
    FlowSim – A Versatile Flow Simulation Tool to Quantify Extraction and Design Alternatives for Block Caving

    By A Hekmat, M Fuentes, F Armijo, R Castro, F Rodriguez

    Interpreting the behaviour of granular material and simulating the gravity flow are complex processes in cave mining methods. In this paper, a new Cellular Automata based code – FlowSim – is used as a

    May 9, 2016

  • AUSIMM
    FLSmidth Flotation Developments - Dorr Oliver Machines

    By S Vianna, K Caldwell, R Silva, T Olson, D Bell

    Studies to enhance the FLSmidth forced air machine through changes in the design, showed important improvements through changes in the number of Rotor blades, stator designs, rotor air distribution an

    Jul 15, 2013

  • AUSIMM
    Fluctuation of Zonal Disintegration of Sedimentary Rock Around the Development Working

    Experimentally determined and theoretically explained phenomenon of zonal disintegration of rock around the development working brings about the radical changes in existing ideas about the mechanism o

    Jan 1, 1991

  • SAIMM
    Fluctuations In Barometric Pressure As A Contributory Factor To Gas Explosions In South African Mines

    By C. J. Fauconnier

    The main purpose of the paper is to determine the contribution of fluctuations in barometric pressure to flammable gas explosions in South African mines. For this purpose, the barometric-pressure patt

    Jan 1, 1992

  • TMS
    Flue Dusts: An Ideal Feed For Resource Recovery

    By John E. Litz

    Metal-bearing flue dusts are produced by some ferrous and non-ferrous industries. Many dusts are being or can be treated for recovery of metal values. Operating and proposed flowsheets for the most co

    Jan 1, 1992

  • SME
    Flue Gas Desulfurization -Is The Tail Wagging The Dog?

    By John S. Lagarias

    While systems to remove sulfur oxides from flue gases have been used at coal fired power plants since 1931, critical need for flue gas desulfurization has only occurred since the late 1960s following

    Jan 1, 1978

  • SME
    Flue Gas Treatment For So2 Removal With Air-Sparged Hydrocyclone Technology

    By R. Bokotko, J. D. Miller, J. Hupka

    Laboratory results from an initial study on the removal of SO2 from gas mixtures are reported using air-sparged hydrocyclone (ASH) technology. Tap water and alkaline solutions were used for absorption

    Jan 1, 2002

  • AUSIMM
    Fluid and Metal Sources in the Mt Carbine Tungsten Deposit, North Queensland, Australia

    By Forsythe DJ, Sun S-S Andrew AS

    Paragenetic, fluid inclusion, stable isotope, and 87Sr/86Sr and 143Nd/144Nd isotope studies of the Mt Carbine tungsten deposit in North Queensland provide information on the sources of the mineralis

    Jan 1, 1987

  • SAIMM
    Fluid Bed Chlorination Pilot Plant At Mintek - Synopsis

    By A. Kale

    A chlorination pilot plant having capacity to produce 5?10 kg/hr of titanium tetrachloride is in operation at the chlorination facility in Mintek. The bubbling fluid bed chlorination plant can be oper