Search Documents

  • ISEE
    DynoMiner™ APS Underground Explosive Loading System

    By Daniel Roy

    This paper introduces a new, safer bulk emulsion loading system for underground mining operations. The features and benefits of the equipment, along with the use of Dyno Nobel Inc. patented gassed emu

    Jan 1, 2003

  • SME
    Dysfunction Junction: When Inalterable Rules Meet Evolving Technology

    By Mark N. Savit

    It is indeed a rarity for a non-engineer, let alone a lawyer, to even be considered for a mining-related award, especially where that award is for significant contributions to technical progress in th

    Jan 1, 2008

  • IIMP
    E-Catastro Minero

    By Henry Luna

    El Instituto Nacional de Concesiones y Catastro Minero – (INACC ) busca mejorar el acceso de la información sobre los derechos mineros y áreas restringidas de la actividad minera del país a los usuari

    Sep 19, 2006

  • ABM
    E-pellet - Carvão Vegetal Como Alternativa Energética Para Pelotização

    By Davi Silva Braga

    O processo de produção das pelotas é intensivo em consumo energético, tanto em energia térmica como energia elétrica. Considerando apenas o custo de transformação de minério de ferro para pelota, a en

    Oct 30, 2017

  • SME
    E-Power Pipe®: Two-Stage Trenchless Method for Long Drives in Small Diameters - NAT2022

    By Peter Schmäh, Tobias Engel

    The E-Power Pipe technology was originally developed for the trenchless installation of protective pipes and pipelines of 10" to 28" diameter, over long distances of more than 4,000 ft. The twostage p

    Dec 1, 2022

  • AIME
    E. DeGolyer, Fritz Medalist

    By AIME AIME

    EVERETTE LEE DEGOLYER, past President of the Institute and Anthony F. Lucas Medalist, was presented with the John Fritz Medal at a dinner at the Wal-dorf-Astoria Hotel in New York, Jan. 14. Dr. DeGoly

    Jan 1, 1942

  • AUSIMM
    E26 Lift 1 North block cave development and construction

    By R Cunningham

    The E26 Lift 1 North Project took 37 months from the approval on 1st January 2019 to the commencement of production on 1st March 2022. This was five months ahead of the feasibility plan. When compared

    Mar 29, 2023

  • AUSIMM
    E48 Cave Extension at Northparkes

    By L Snyman, S Webster and J Samosir

    Northparkes is located 27 km north of the township of Parkes in central New South Wales, Australia. The operations consist of underground block cave mines and an ore processing plant, which produces h

    May 9, 2016

  • ISEE
    E7B Sector Drilling and Blasting Challenges and Learnings

    By Robert Jacob Cefalo, Rio Tinto Kennecott

    At the end of 2016, the Mine started a new ore phase in the section of the pit located on the East Wall. The East Wall geological structures required controlled blasting for peak particle velocity (PP

    Jan 1, 2019

  • TMS
    EAF Dust As An Electrolytic Zinc Resource

    By A. D. Zunkel

    The zinc in electric arc furnace dust (EAFD) arises from the fuming and oxidation of the zinc present, mainly as galvanizing, in automotive scrap. The dust is collected from the electric furnace offga

    Jan 1, 1995

  • TMS
    EAF Dust Processing in the Gas-Fluid Flame Reactor Process

    By C. O. Bounds

    Management of emission control dust from electric? arc furnace (EAF) steelmaking as an RCRA-EPA listed hazardous waste places economic and environmental pressures on the steelmaking industry. Horsehea

    Jan 1, 1990

  • TMS
    EAF Dust Processing with a Combination of Hydro-and Pyrometallurgical Techniques

    By Åke Saudström

    An EAF dust sample generated in a scrap based steel mill was treated by a combination of hydro- and pyrometallurgial techniques. The EAF dust contained mainly ferritic spinels forming solid solution p

    Jan 1, 2003

  • TMS
    EAF Dust Recycling at AmeriSteel

    By J. D. Sloop

    This paper discusses the current state of EAF dust recycling at AmeriSteel's Dust Processing Division in Jackson, Tennessee. Included are a brief history of the plant, a description of the facility, a

    Jan 1, 2000

  • TMS
    EAF Dusts: A Viable Complete Minimization

    By E G. Prado

    We have confirmed on bench scale the removal of chlorides and alkalies (+95%) and over 2/3 of the zinc, lead and cadmium from EAF dusts. This has been achieved with arrononium acetate solutions alone,

    Jan 1, 1994

  • TMS
    EAF Steel Producers and The K061 Dilemma

    By LeRoy C. Prichard

    The scrap based steel producers in the United States generate an estimated 650,000 tons of electric arc furnace (EAF) dust annually which is classified as hazardous waste, K061. These scrap based prod

    Jan 1, 1995

  • ABM
    Eafd Generation – Termodinamic Analisys Of Fe-zn-o-cl-h-c System

    By Pedro Jorge Walburga Keglevich de Buzin

    The steel production in mini mills generates several process residues, among them there is the electric arc furnace dust (EAFD). This residue has as main elements Fe, O, and Zn, being classified as ha

    Jul 30, 2018

  • IMPC
    EAFD Treatment Joining Pyro and Hydro Metallurgy

    By E. Guerrini, M. Maccagni, J. Nielsen

    "The solution for the treatment of the EAFD has not yet been fully achieved. Some of this dust has still not found an appropriate final destination. Large consortium treatment plants are quite expensi

    Jan 1, 2018

  • IMPC
    EAFD Treatment Joining Pyro and Hydro Metallurgy (e2bb77bb-1450-4fcb-9193-3cbc033e6f3e)

    By E. Guerrini, M. Maccagni, J. Nielsen

    "The solution for the treatment of the EAFD has not yet been fully achieved. Some of this dust has still not found an appropriate final destination. Large consortium treatment plants are quite expensi

    Jan 1, 2018

  • ABM
    EAFD – A Thermodynamic Analysis And Classification Of Dust Types

    By Pedro Jorge Walburga Keglevich de Buzin

    Steel production process generates waste, among which is the electric arc furnace dust (EAFD). This waste has varying amounts of zinc, which is principally contained in the minerals zincite (ZnO) and

    Jul 30, 2018

  • CIM
    Eagle Mine and Mill Commissioning

    By Jennifer Abols

    In July of 2013, Lundin Mining acquired the 2,000 tpd Eagle nickel and copper project from Rio Tinto. The project had been put on hold earlier in the year and construction was approximately 50% comple

    Jan 1, 2015