Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Case Study of Roof Behaviour and Conditions for Longwall Face Recoveries at Beltana No. 1 Mine, Australia

    By David Hill

    Over the last decade, Beltana No.1 Mine has generally been Australia?s most productive longwall operation, with a ROM output of 7.2 Mt in YEJ2007. Characteristically favorable roof conditions and low

    Jan 1, 2011

  • SME-ICGCM
    The Duncan Method of Partial Pillar Extraction at Tasman Mine

    By Kent D. Mctyer

    Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro

    Jan 1, 2011

  • SME-ICGCM
    The Directional Drill Monitor For Long Hole Gas Drainage In Coal Mines (d6b87c76-5ad8-4cc5-b4ae-23b79c52c32b)

    By G. Skybey

    The Directional Drill Monitor (DDM) is an advanced instrument for real time in hole surveying. It was developed by Du Pont (Australia) to suit Australian gassy coal mining conditions. The instrumen

    Jan 1, 1992

  • SME-ICGCM
    Three Dimensional Numerical Modelling Of Effects Of Subsidence On Escarpments

    By Leigh J. Wardle

    Significant coal reserves in New South Wales lie under areas with steep topography such as valley slopes and cliffs. Subsidence predictions are difficult to make for these locations as existing empiri

    Jan 1, 1992

  • SME-ICGCM
    MSHA Technical Review of Proposed Mine Designs for U.S.Underground Coal Mines

    By Michael Gauna

    Ground fall injuries and fatalities in United States underground coal mines have shown a diminishing trend. Advances in bolting and standing support systems have led to improved safety in underground

    Jan 1, 2011

  • SME-ICGCM
    The Duncan Method of Partial Pillar Extraction at Tasman Mine (8325db0b-edfd-48b5-8c88-7ef0db101af9)

    By Kent D. Mctyer

    Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro

    Jan 1, 2011

  • SME-ICGCM
    Progress In The Knowledge Of Granite Cutting With Diamond Wire (bf80b832-f557-4b46-b5c9-31193e67bf2d)

    By A. Bortolussi

    The paper discusses the state of the progress reached in the development of the diamond wire tool for cutting hard rocks. To the advances of this relatively new technology a substantial contribution h

    Jan 1, 1992

  • SME-ICGCM
    Development Of A Statistical Technique For Assessing Sandstone Escarpment Stability

    By Hamid Maleki

    During the last decade, a significant amount of research has been conducted by Energy West Mining Company, government agencies, academia, and consulting companies to develop predictive tools for asses

    Jan 1, 2000

  • SME-ICGCM
    3D FEM Simulation For Fully Grouted Bolts

    By Khaled Morsy

    Most of the available numerical codes simulating the reinforcing effect of fully grouted bolt are accomplished by a series of bar elements which are connected along their length to the host rock by sh

    Jan 1, 2004

  • SME-ICGCM
    An Underground Trial Of Cable Slings For Remedial Support Of Longwall Gateroads

    By William D. Gallant

    This paper describes a joint cooperative project between the CANMET Cape Breton Coal Research Laboratory and the Cape Breton Development Corporation to conduct a trial of split set cable slings for re

    Jan 1, 1990

  • SME-ICGCM
    Tekflex As A Sprayon Screen Replacement In An Underground Hard Rock Mine

    By Chris Pritchard

    Falconbridge Ltd., a major base metal producer in the Sudbury Basin of Ontario, Canada, identified a need to find a safe and cost effective replacement for welded-wire mesh used to support loose groun

    Jan 1, 1999

  • SME-ICGCM
    A Novel Ground Control Program at Plateau Mining Company

    By Hamid Maleki

    A novel ground control program has been developed at Plateau Mining Company through five years of geotechnical investigations. The study was initiated to determine the causes for roof stability proble

    Jan 1, 1987

  • SME-ICGCM
    Abutment Pillar "Notching" Improves Abutment Tunnel Roof Conditions At The Cayuga Rock Salt Mine

    By David B. Plumeau

    The Cayuga Mine, a deep rock salt mining, operation, changed from a standard room and pillar mine design to a yielding pillar/pressure arch design five years ago. In general the roof conditions improv

    Jan 1, 1981

  • SME-ICGCM
    Coal Mine Primary Support Selection: Tension Versus Non Tensioned Roof Bolt Systems

    By Kot Unrug

    The selection of tensioned versus non-tensioned roof bolts, for primary coal mine roof support, has been debated for well over 25 years. The wide spread use of fully grouted rebar marked the beginning

    Jan 1, 2004

  • SME-ICGCM
    The Effectiveness Of Interpanel Pillars In The Control Of Surface Subsidence (ef7cc44b-3192-4f5f-a75c-62563d519797)

    By Laxminarayan Holla

    There exist many formulae for designing coal pillars. However, when applied to a given set of mining parameters, they lead to different pillar sizes and factors of safety. From the subsidence point of

    Jan 1, 1992

  • SME-ICGCM
    Roof Bolting for Long-Term Entries in Underground Coal Mines

    By Peter Zhang

    As simpler and easier reserves are exploited to depletion, underground coal mining continues in more complex geologic settings and conditions. Roof bolting for long-term entry stability is always a ch

    Jan 1, 2011

  • SME-ICGCM
    Geotechnical Planning Basis for the Optimization of Workings

    By Nikolaos Polysos

    Besides considering the given geomechanical conditions, the geological/geotechnical logging of drill cores and heading faces during the driving of parallel entries and the resulting rock classificatio

    Jan 1, 2003

  • SME-ICGCM
    Enhancing Mine Subsidence Prediction and Control Methodologies

    By Michael Karmis

    During the last 25 years, technological advancement and subsidence research have resulted in more accurate and diverse prediction capabilities. The work presented in this paper focuses on the developm

    Jan 1, 2008

  • SME-ICGCM
    Determination Of Rock Strength Properties Using Geophysical And Ultrasonic Logging In Exploration Drill Holes

    By John Feddock

    This study deals with underground mines and ground control and the prediction of seats strength characteristics based upon ultrasonic logging. Exploration drill holes, both rotary and core holes are u

    Jan 1, 2003

  • SME-ICGCM
    Control Technology For Roof Drill Operators

    By Bob Thomas

    The roof drill operator productivity can be enhanced by the introduction of control technology The operators control station can be improved by considering human factors such as handle forces and cont

    Jan 1, 1999