Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Improving the Capability for Real Time Assessment of Roof Conditions through Intelligent Roof Bolt Drilling Operations,

    By Robert Anderson

    Advance knowledge of roof conditions can lead to improvement in roof control strategies that will reduce roof falls and ultimately will reduce injuries to mine workers. J.H. Fletcher and Company, in

    Jan 1, 2007

  • SME-ICGCM
    Shear Testing of 28 mm Hollow Strand "TG" Cable Bolt

    By Naj Aziz, Peter Craig

    "Double shearing tests were carried out on the 28 mm (1 in) hollow strand Jennmar TG cable bolt to gain a better understanding of the shearing behavior of the cable. The first test was limited to a 50

    Jan 1, 2010

  • SME-ICGCM
    Sidewall Fracturing In Coal Room And Pillar And Pillar Extraction Panels (fdea63a5-d54d-46e2-aad5-6c4f1c72e2f1)

    By André Vervoort

    In coal room and pillar, and pillar extraction panels, the sidewall conditions were investigated based on underground measurements and numerical simulations. Three-dimensional linear elastic models pr

    Jan 1, 1992

  • SME-ICGCM
    Relationship between the Width of Strip Pillar Yield Zone and Recovery Ratio

    By Wenbing Guo

    The stability of strip pillar is the key to successful strip pillar mining. In analyzing the stability of the strip pillar, the width of yield zone must be determined. The determination of the width

    Jan 1, 2006

  • SME-ICGCM
    Safety: A Review and Evaluation of Current Retreat Mining Practices in Kentucky

    By John E. Feddock

    Retreat mining plays an important role in the coal production within Kentucky and the Appalachian Coal Basin. In Kentucky, the majority of retreat mining is performed in the Eastern coal field. Howe

    Jan 1, 2006

  • SME-ICGCM
    Numerical Modelling Based Investigation of Coal Pillar Stability for Room and Pillar Development at 900 m Depth of Cover

    By Ashok Kumar, Rajendra Singh, Petr Waclawik

    High-grade coal is locked in the shaft protective pillars at 900 m below surface in the Czech part of Upper Silesian Coal Basin. To optimise recovery of coal from the larger size shaft protective pill

    Jan 1, 2018

  • SME-ICGCM
    Relationship between Mining Subsidence and Mining Depth in Strip Pillar Mining

    By Wenbing Guo

    Strip pillar mining method is one of the most important techniques for mining subsidence control in China. Mining depth is one of the most important factors that affect subsidence in strip pillar mi

    Jan 1, 2007

  • SME-ICGCM
    Plasticity Characteristics of the Immediate Floor Rocks in the Illinois Basin Coal Mines

    By Murali Gadde

    The immediate floor bed in the Illinois Basin coal mines is often comprised of weak plastic underclay material. Operational and stability problems were encountered in the past due to the low strength

    Jan 1, 2008

  • SME-ICGCM
    25 Years of Ground Control Developments, Practices, and Issues in Australia

    By Bruce Hebblewhite

    This paper recognises the 25th year of the Morgantown International Ground Control in Mining Conference, by offering a twenty five year review of ground control in the Australian mining industry ? pri

    Jan 1, 2006

  • SME-ICGCM
    A Survey of the Current Rib Support Practices and Techniques in U.S. Coal Mines

    By Khaled M. Mohamed, Michael M. Murphy, Ted M. Klemetti, Heather E. Lawson

    "The design of rib support systems in U.S. coal mines is based primarily on local practices and experience. A better understanding of current rib support practices in U.S. coal mines is crucial for de

    Jan 1, 2015

  • SME-ICGCM
    Geotechnical Considerations for Concurrent Pillar Recovery in Close Distance Multiple Seams

    By Peter Zhang

    "Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground-fall fatalities in the underground coal mines of the United States. The risk of ground fa

    Jan 1, 2017

  • SME-ICGCM
    Coal and Gas Outburst in a Coal Mine Shaft Development: A Case Study

    By Mingju Liu

    China has been suffering from coal and gas outbursts since 1950s. Nowadays, the situation has become worse than ever with the need to mine deeper coal deposits at higher production rates in a more com

    Jan 1, 2007

  • SME-ICGCM
    Mine Seals ? A Rational Base for Design and Construction

    By Kot Unrug

    Mine seals are necessary in nearly every mine to isolate mined-out areas from the ventilation network. There is a large number of seals in active mines and that number continually increases as the de

    Jan 1, 2008

  • SME-ICGCM
    Multiple Seam Mining Interactions ? A Case Study

    By Khaled Morsy

    The studied mine extracts the Sewickley seam using room-and-pillar method. The overburden at study site ranges from 400 to 800 ft. Eight years earlier, the Pittsburgh seam was mined 80 ft underneath t

    Jan 1, 2006

  • SME-ICGCM
    Cable Bolting with Low Air Power ? A Solution?

    By Matt Leeming

    Several of the underground mines in the UK require a significant number of cable bolts to be installed, remedially, to control worsening roadway conditions. Often the access is limited and the only po

    Jan 1, 2007

  • SME-ICGCM
    Dynamic Failure in Deep Coal: Recent Trends and a Path Forward

    By Jeffrey Whyatt

    Mining coal in deep, gassy strata is difficult, particularly in deep mines of the west. Dynamic failure (bumps, bounces, etc.) is commonplace, particularly where strong sandstone strata are encountere

    Jan 1, 2008

  • SME-ICGCM
    Extraction of Hard Coal Close to a Shaft

    By Peter Fischer

    Reducing mining costs has become such an important factor in the German coal industry that operators are forced to work only those areas where production costs can be kept low. These areas will normal

    Jan 1, 2007

  • SME-ICGCM
    The Development of Active Cable Anchors for Primary Supports in Coal Mines

    By Scott A. Shapkoff

    High strength cable strand supports are predominately used as a supplemental means of ground control in longwall and development operations in the U.S. The advantages of cable strand supports have bee

    Jan 1, 2006

  • SME-ICGCM
    Keynote Address for 24th International Conference on Ground Control in Mining, August 2- 4, 2005 - Like Deja Vu All Over Again

    By Peter B. Lilly

    Thank you, Syd, for the kind introduction and for inviting me to give the Keynote Address at this very prestigious gathering of some of the finest intellect and talent in the domestic and internationa

    Jan 1, 2006

  • SME-ICGCM
    Coal Pillar Loading Mechanisms and Progress in Pillar Design

    By David Hill

    The Australian underground coal mining industry is increasingly operating in an environment that challenges traditional concepts of coal pillar design, against a background of heightened expectations

    Jan 1, 2008