  • SME-ICGCM
    Roof Control Problems on Development and Longwall Gateroads at a South- western PA Coal Mine

    By T. P. Mucho

    Over the past several years, two types of roof control problems have been en- countered at Beth Energy's Eighty Four Complex mine in Southwestern Pennsylvania. These problems have been (1) poor r

    Jan 1, 1986

  • SME-ICGCM
    Time-Dependent Behavior Of Rocks: Laboratory Tests On Hollow Cylinder

    By Gilles Rousset

    This paper presents laboratory experiments conducted on hollow cylinders samples. The advantage of such a geometry is to approach in situ conditions around cylindrical openings (lined galleries, boreh

    Jan 1, 1989

  • SME-ICGCM
    A Case Study of Longwall Roof-Supports Interaction

    By Y. H. Wang

    During the last two decades many research projects were conducted to study the load requirements for the powered supported longwall faces (1-6). Significant results had been achieved by these research

    Jan 1, 1986

  • SME-ICGCM
    How to Mitigate Coal Mine Bumps Through Understanding of the Violent Failure of Coal Specimens

    By Gamal Rashed

    This research is divided into two parts: the first part of this research focuses on understanding coal mine bump mechanisms, and the second part focuses on mitigating the violent failure associated wi

    Jan 1, 2013

  • SME-ICGCM
    Geomechanic Monitoring And Distributed Information Systems

    By G. I. Gritsko

    In this paper we consider the elements of a distributed information geomechanic monitoring system which is used in computerized mine planning and mining operations control. The automated system is a t

    Jan 1, 1996

  • SME-ICGCM
    Main Gate Roof Support Design and Management During Longwall Retreat in the Australian Coal Industry

    By Rob Thomas

    Main gate roof control during longwall retreat is subject to a significant increase in horizontal stress and risk. The implementation and management of an appropriate roof support design is as a resul

    Jan 1, 2006

  • SME-ICGCM
    Trail Mountain Mine: A Case Study For Improving Locations Of Mining-Induced Seismicity With Double-Difference Relocation (2de3a4ff-91be-4a02-947a-fc4fd7ffaac8)

    By Eleanor Sonley

    In October 2000, temporary seismographic stations were installed above the Trail Mountain Mine, Emery County, Utah, USA to supplement a regional network. Over seven months, 1826 mining-induced seismi

    Jan 1, 2009

  • SME-ICGCM
    An Application Of Energy Release Rate

    By Morgan M. Sears

    In recent years, one large mine collapse and numerous smaller bump events have resulted in a renewed interest in coal bump research. With numerical modeling, the Energy Release Rate (ERR) calculation

    Jan 1, 2009

  • SME-ICGCM
    Staubbekampfung An Schildausbau In Bruchbaustreben (Combating Dust On Shield Supports On Longwall Mining)

    By Wilfried Ufer

    [1. Einführung in die Problematik 1.1 Die Bedeutung des Schildausbaus Seit fast 30 Jahren ist die Konkurrenzsituation auf dem Primärenergiemarkt der Bundesrepublik Deutschland durch einen von Erdöl

    Jan 1, 1984

  • SME-ICGCM
    Improved Intersection Design And Monitoring In The Sydney Coalfield

    By G. R. Corbett

    The introduction of roof bolts to Phalen Colliery in the Sydney Coalfield, Nova Scotia (annual output of 2Mt) has been successfully implemented in maingate and tailgate entries over the last four year

    Jan 1, 1995

  • SME-ICGCM
    Rock Mechanics Issues In The Trona Patch

    By Archie Richardson

    The trona mines in the Green River Basin, commonly known as the "trona patch," present an interesting set of rock mechanics issues stemming from mining in a unique underground environment. Like other

    Jan 1, 1999

  • SME-ICGCM
    Coal Pillar Strength Based On The Ground Reaction Curve - A New Approach

    By Kazem Oraee

    In underground coal mining, particularly room-and-pillar methods, the coal pillars play a significant role in roof stability. If the pillar dimensions are increased, the pillar bearing capacity also i

    Jan 1, 2009

  • SME-ICGCM
    A Practical Solution to Highwall Mining Coal Reserves Sterilized by Auger Mining

    By Michael Amick

    Over the last few years as the coal industry has seen an increase in the price of coal, a renewed interest in the additional mining of pre-law highwall sites has occurred. Much premium coal and pro

    Jan 1, 2007

  • SME-ICGCM
    Subsidence Misconceptions And Myths

    By Richard E. Gray

    Subsidence due to coal mining is poorly understood by non-specialists. This has led to numerous misconceptions and myths based on limited observations and lack of knowledge. The three most common are:

    Jan 1, 1996

  • SME-ICGCM
    The Uniaxial Compressive Strength Of Coal: Should It Be Used To Design Pillars?

    By Christopher Mark

    The Bureau of Mines has recently completed a comprehensive study of coal strength. More than 4000 individual test results from over 60 seams were extracted from the literature and combined in the most

    Jan 1, 1996

  • SME-ICGCM
    Classification Of Large Seismic Events At The Lucky Friday Mine

    By J. K. Whyatt

    The paper presents an approach to design a multi level room and pillar layout in a 40m thick seam overlain by a major aquifer. The design was required to maximise extraction with due consideration of

    Jan 1, 1996

  • SME-ICGCM
    New Developments In Headed Rebar Ground Support (e1369dc5-cd64-41ac-8b6d-861d8d628824)

    By Roland C. Walker

    Traditional headed rebar has existed in the mining industry as a ground support product for many years. The head of a rebar bolt is most commonly produced by hot upset die forging. Upset die forging

    Jan 1, 2009

  • SME-ICGCM
    The Significance of Specimen Stiffness and Post Yield Characteristics on Passive Roof Support Design

    By Thomas M. Barczak

    The intent of this paper is to make mine operators and engineers aware of parameters which affect the loading behavior of passive roof support systems. The strength of a passive roof support element a

    Jan 1, 1987

  • SME-ICGCM
    Utilization of the Hilti OneStep Rock Anchor at Twentymile Coal Company to Reduce the Overall Amount of Time for Face Stabilization During Longwall Recovery

    By Bill Stormes

    This paper will discuss implementation of the Hilti OneStep rock anchor technology to improve face bolting operations during the May 2008 longwall move; increase rock anchor installation capacity; and

    Jan 1, 2008

  • SME-ICGCM
    The Extraction of Main Heading Pillars with a Longwall at Nre Wongawilli Colliery

    By Ry Stone

    To maintain longwall continuity, NRE Wongawilli Colliery extracted the approximately 20-year-old Thompson Mains and in doing so, 20 roadways were holed into during longwall retreat. The orientation of

    Jan 1, 2012