Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Stochastic Continuous Modeling for Pillar Stress Estimation and Comparison with 2D Numerical, and Analytical Solutions in an Underground Stone Mine

    By Juan J. Monsalve, Mario Karfakis, AMAN SONI, Nino Ripepi, Jim Hazzard

    Pillar collapses are events that due to their severe consequences can be classified as high risk. The design of pillars in underground room-and-pillar operations should migrate to risk-based design ap

    Sep 24, 2022

  • SME
    Observed loading behavior during cross passage construction at the Brisbane Airport link project

    By Michelle Mangione, John Kuyt, Zili Li, Michael Mooney

    "Twin bored tunnels are commonly used for a variety of road and tunnel projects throughout the world.A major component of these twin tunnel projects is the construction of connecting cross passages th

    Mar 1, 2017

  • SME
    The Role Of The MMAJ And The Activities Of The Japanese Mining Industry In Global Resources Development

    By H. Ikeda

    INTRODUCTION [Slide 1] The Role of the MMAJ Ladies & Gentlemen, it is a pleasure for me to be able to make a speech at this SME annual meeting, representing the Metal Mining Agency of Japan.

    Jan 1, 2001

  • SME
    Edmonton South LRT Twin Tunnels

    By Steve Skelhorn

    Edmonton South LRT is the latest expansion of the Subway system in Edmonton, Alberta, Canada: Consisting of twin 5.8m segmental lined tunnels, 280m long, driven by a Lovat EPB machine. The key challen

    Jan 1, 2005

  • SME
    Magmont Mine Closure Under Missouri Metallic Minerals Act

    By M. F. Bradley, G. M. Schoen

    The Magmont Mine, a 50/50 venture between Cominco American Incorporated (the Operator) and Dresser Industries, Inc., (Halliburton), is a metallic mining and milling facility in the new lead belt of Mi

    Jan 1, 2001

  • SME
    Opportunities At Northshore Mining’s Concentrator And Pelletizer

    By S. Jayson Ripke, Shane Hoff

    Cleveland-Cliffs’ Northshore Mining Company operates a magnetic iron ore (taconite) concentrator and pelletizer in Silver Bay, MN. These are two recent cost reduction projects: 1. Rougher Magnetic

    Jan 1, 2005

  • SME
    Clay-Based Flocculant For The Removal Of Suspended Matter And Heavy Metals

    By J. Darlington, A. K. SenGupta

    Water-swellable layered silicates, namely, the smectite clays can remove suspended materials (called herein as debris) and metal ions from aqueous streams. The present study shows that the flocculati

    Jan 1, 2002

  • SME
    Measurement of Overburden Failure Zones in Close Multiple-Seam Coal Mining

    Because of its small interburden thickness, concentrated stress distributions, high coal seam metamorphism, and complex geological conditions, mining the five coal seams (Nos. 5, 7, 8, 9 and 12) of Ka

    Jan 7, 2020

  • SME
    Sinking A Freeze Shaft With Installation Of A Water-Tight, Flexible Lining

    By Klaus Stoss, Bernd Braun

    The sinking and lining of a large mine shaft with 8.0 m i.d. and 1,133 m total depth is described in detail. The ground freezing method was applied to safely sink the shaft through unstable, waterbear

    Jan 1, 1983

  • SME
    Successful Application Of Remote Seals Used To Extinguish A Coal-Mine Fire

    By D. Bour, C. Nyikos, R. Curtice

    Fire in a coal mine can be disastrous on many levels. In most cases, when a fire is detected, mining operations cease and all personnel are evacuated. Underground coal-mine fires are difficult to exti

    Jan 1, 2002

  • SME
    A Case Study Exploring Field Level Risk Assessments as a Leading Safety Indicator

    By R. Heiser, J. Vendetti, B. P. Connor, E. J. Haas

    "DISCLAIMER The findings and conclusions in this paper are those of the authors and do not necessarily represent the views of the National Institute for Occupational Safety and Health. Reference to sp

    Jan 1, 2017

  • SME
    Time-Dependent Monitoring of Seismic Wave Velocity Variation Associated with Three Major Seismic Events at a Deep, Narrow-Vein Mine "Mining, Metallurgy & Exploration (2021)"

    By Erik Westman, BEN WESTON, SETAREH GHAYCHI AFROUZ, KATHRYN DEHN

    One of the most difficult challenges in underground mining is to forecast significant seismic events prior to their occurrence in order to support the safety of miners and to minimize damage to the un

    Oct 12, 2020

  • SME
    Bulk Handling Technology; Designing for the Future by Innovating the Present

    By R. Todd Swinderman

    "Higher production demands across all bulk handling segments require increased efficiency at the lowest cost of operation, in the safest and most effective manner possible. As conveyor systems become

    Jan 7, 2017

  • SME
    Self-Cleaning Fluidized Bed Slurry Heat Exchangers: A Breakthrough In The Hydrometallurgy For The Processing Of Laterite Nickel And Cobalt In High-Pressure-Acid-Leach (HPAL) Plants

    By D. G. Klaren

    Self-cleaning fluidized bed heat exchangers are conquering the world for reason that they are able to solve any severe fouling problem in indirect heat transfer due to the circulation of cleaning part

    Jan 1, 2002

  • SME
    "Testing Of Friction Rock Stabilizers*?

    By James J. Scott

    Friction Rock Stabilizers, trade name II Sp 1 it Sets'" have been under research and development by the author and the Ingersoll-Rand Company since February of 1973. The United States Bureau of M

    Jan 1, 1977

  • SME
    Iron Concentrate Slurry Pipelines - Experience and Applications ? Introduction - Background

    By J. D. Pitts

    The worldwide production of iron ores was approximately 880 million metric tons in 1975. This level is the result of an annual growth rate of nearly four percent during the period 1967 to the present.

    Jan 1, 1976

  • SME
    A Skeletal Model For An Intelligent And Integrated Design System For Underground Coal Mines

    By A. J. Basu

    An overview of the evolution of computerized mine planning and design has been given, emphasizing the need for a knowledge-based system for planning and design of underground coal mines. An outline fo

    Jan 1, 1991

  • SME
    Size Reduction/Mineral Liberation Simulation For A Magnetic Taconite Concentrator (451168a3-7660-4e82-9e41-cf07bc59aaec)

    By R. L. Wiegel

    Several mineral process modeling and simulation packages are currently available for use in evaluating the performance of alternative process flowschemes. A critical link that has been missing from t

    Jan 1, 2002

  • SME
    Markets For Southern Powder River Basin Coal (bbc13600-5e51-4eb3-96d9-1d16af023b88)

    By P. J. Best

    Due to its low mine production costs, competitive rail rates and low sulfur content, the Southern Powder River Basin (SPRB) now commands 30 percent of the U.S. utility coal market. In 1996, production

    Jan 1, 1998

  • SME
    Heat/humidity tests of a built-in-place refuge alternative using simulated miners - SME Transactions 2018

    By T. J. Lutz, D. S. Yantek, L. Yan, J. R. Srednicki, J. A. Yonkey, G. T. Homce

    Federal regulations require the installation of refuge alternatives in underground coal mines. Of the inuse refuge alternatives, more than 95 percent are mobile refuge alternatives, with the remainder

    Jan 1, 2018