Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Engineering Aspects Of Water Pollution Control Systems - IntroductionBy R. G. Dalbke
An increasing number of water pollution control systems are certain to be installed by many industries in the future because of new federal, state, and local government regulations, and because of the
Jan 1, 1968
-
Determining Corrosion Rates In Industrial Ore Grinding EnvironmentsBy A. E. Isaacson
Researchers at the Bureau of Mines, U.S. Department of the Interior, developed and tested equipment to measure corrosion rates on a commercial-scale mill. Bench-scale experiments were also designed fo
Jan 1, 1989
-
Planning and Designing For Mining ConservationBy David B. Brooks, Roger L. Williams
Control of the environment is as old as mining. Engineers have always had to consider how best to deal with the surface, and the character of the surface environment always affects mining method in so
Jan 1, 1973
-
Evaluation Of Catalyzed Ceramic Diesel Particulate FiltersBy K. L. Bickel
Catalyzed diesel particulate filters (CDPFs) are used for reducing diesel particulate matter (DPM) concentrations in underground mines. The U.S. Bureau of Mines is conducting research on how catalyzed
Jan 1, 1994
-
Land Reclamation In Urban AreasBy Gene R. Block
The most economical method of reclaiming land that has been mined, whether it be in urban areas or in rural areas, is when the final configuration of the mining area is that which is required by the s
Jan 1, 1984
-
Case History of the Orme Street Combined Trunk Relief Sewer Phase IIIBy Kenneth Denton, Michael Cutts, Andrew Bursey, Eric Eisold
Phase III of the Orme Street Combined Trunk Relief Sewer project connects two existing 2.13 m diameter combined sewers to a new 3.66 m diameter relief sewer at 7locations along a 970 m alignment in do
Jan 1, 2003
-
Animation Models Of Mines To Assist In Mine Planning And ProductionBy J. R. Sturgul
Computer simulation models of working mines can be of great benefit to the mining engineer. Such models have been used in mine planning (how many trucks/shovels to have, when to add new equipment, etc
Jan 1, 1993
-
A Laboratory Study Relating To The Production And Properties Of Pig Iron NuggetsBy B. Anameric, S. K. Kawatra
Pig iron nuggets were produced in a laboratory scale furnace at Michigan Technological University. These nuggets are produced from pellets consisting of a mixture of iron oxide, coal, flux, and a bind
Jan 1, 2004
-
The Kennecott Copper Corporation Bonneville Concentrator (459e9933-514e-40d1-b88e-5a80339b82eb)By Robert J. Ramsey, N. Finkelstein, Robert D. Jeppson
Introduction The Utah Copper Division of Kennecott Copper Corporation will present its contribution to the A. M. Gaudin Flotation Symposium in four parts. The first two segments will discuss briefly
Jan 1, 1976
-
Indicator Conditioned Estimator (25d65824-d33d-4da1-8117-5abe26a82e3f)By H. Zhu
Qualitative and interpretative information as obtained from geological and/or geophysical studies, in addition to precise measurement, is incorporated into the estimation process through an indicator
Jan 1, 1989
-
Geology Of The Royal-Mountain King Hodson District, Calaveras County, California MineBy T. O. Kuhl
The Royal-Mountain King Project is 7.2 kilometers (4.5 miles) northwest of Copperopolis, California. Reserves of 8,250,000 t (9,100,000 st) at 2.32 g/t (0.068 oz/st) gold will be processed at 2500 t/d
Jan 1, 1989
-
Mine Health And Safety: Progress And Prospects For The Future (5388714c-ceaf-4b61-a236-f399939e1565)Not quite a year ago, during a speech to a group of mining professionals in Washington, DC, the subject centered around the long-range importance of conducting research projects and how much that rese
Jan 1, 1999
-
The Tolerance of Structures to Ground Movements - Some ConsiderationsBy Robert W. Bruhn
The prediction of damage to a structure that is to be undermined is generally a two step process. First, the expected ground movements (the displacements, slopes, curvatures, and strains) are estimate
Jan 1, 1986
-
Concentrator Design For Large Grinding Circuits ? IntroductionBy George M. Meisel
This paper is devoted to a discussion of the factors governing design of concentrators for large grinding circuits. Emphasis is placed on the manner in which use of ever larger grinding mills has affe
Jan 1, 1968
-
Planning Ventilation For Underground Nuclear Waste RepositoriesBy N. S. Tanious
The Nuclear Regulatory Commission (NRC) regulation 10 CFR 60 requires that the ventilation system for the geologic repository be designed to: (1) control the transport of radioactive particulates and
Jan 1, 1988
-
Research and DevelopmentBy N. J. Themelis, W. H. Dresher
Research is probably the least understood and the most underrated or overrated, depending on the circumstances, function of the corporate enterprise. Some companies become engaged in research because
Jan 1, 1985
-
Suitability Of Artificial Stone As Building Material: A Sustainable Development Option For The Construction IndustryBy S. Maurigiannakis
In an effort to promote sustainability in the construction industry, the natural decorative stones that cover large external areas of buildings may be replaced with artificial stones. In this paper th
Jan 1, 2003
-
Geology Of The Taquari-Vassouras Potash Mine Sergipe State, BrazilBy A. Ligorio Pires de Carvalho
The main potash deposit at Taquari-Vassouras is contained in cycle VII, and consists of several sylvinite bodies. Cycle VII belongs to a sequence of nine cycles defined by Szatmari (1974) in the Sergi
Jan 1, 1995
-
The Organization And Management Of Teams For International Mining Property EvaluationsBy M. Springett
Organization of teams for rapid and effective evaluation of international mining properties requires special considerations beyond those needed for domestic activities. Experience, technical ability,
Jan 1, 1994
-
Robbins Double Shield Breaks Through On Sochi ProjectIn early March 2011, a 6.2 m (20.3 ft) diameter Rob-bins Double Shield tunnel boring machine (TBM) crossed the finish line in Sochi, Russia. The machine completed a 4.5-km- (2.8-mile-) long section o
Jan 1, 2011