Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Seismic Hazard In Western Australian MinesA Seismic Hazard Scale (SHS) has been developed to provide a practical seismic hazard assessment tool applicable to mine site personnel. It has been applied to seismic data sets from numerous Western
Jan 1, 2004
-
Visualising and Understanding the Stress Path for Rock Mechanics Modelling and Testing, and Rock Engineering DesignBy J. P. Harrison, J. A. Hudson.
ABSTRACT: When considering the rock stress component of rock mechanics design, the basic procedure is to consider the pre-existing stress-state in the rock mass and then estimate the disturbance to th
Jan 1, 2003
-
Design of lining system for a pressure tunnel on the base of interaction between rock and liningBy A. Kazemi, M. A. Ahmadi
Pressure tunnels are constructed nurously in related with powerhouse. In some cases, according to high internal water pressure, rock mass around tunnel can seldom suffer this pressure. So installation
Jan 1, 2003
-
Ground Conditions And Support Systems At 1 Shaft, Konkola Mine, Chililabombwe, Zambia.By C Katongo
Ground condition at No1. Shaft varies across the mine. The different ground conditions arise as a result of the differences in the rock strength and structure, seismicity and induced stresses in abutm
Jan 1, 2005
-
Investigations into the residual strength of a 2.5 m wide Bushveld Merensky Reef crush pillar - SynopsisBy B. P. Watson
The first crush pillars on the Bushveld platinum mines were introduced at Union Section in 1978. Before the introduction of crush pillars, serious problems were experienced when stoping advanced to a
Jan 1, 2008
-
Numerical simulation of jointed block mass under uniaxial stress conditionBy K. S. Rao, R. P. Tiwari, V. K. Shrivastava
ABSRACT: In this paper numerical simulation of jointed block mass behaviour obtained in an experimental study has been presented. Singh et al. (2002) conducted extensive tests on the jointed model mat
Jan 1, 2003
-
A new rock mass failure criterion for biaxial loading conditionsBy P. H. S. W. Kulatilake, B. Malama
To simulate brittle rocks, a mixture of glastone, sand and water was used as a model material. Thin galvanized sheets were used to create joints in blocks made out of the model material. To investigat
Jan 1, 2003
-
An integrated approach to panel width, fleet size, and change-out time optimization in room-and-pillar minesBy E. Córdova, A. Anani, W. Nyaaba
Optimization of panels, haulage fleet, and waiting area involves deterministic and low-fidelity methods and experiential knowledge. The process is challenging because coal recovery and operational cap
Apr 2, 2022
-
Strength of model rock masses with discontinuous jointsBy Van Sint JanM., M. Prudencio
ABSTRACT We report the results of a model-testing program to evaluate the strength characteristics of non-persistent joints. We describe the conditions under which new tensile cracks generate and
Jan 1, 2003
-
The Performance Of Centrifugal Pumps When Pumping Ultra-Viscous Paste Slurries - SynopsisSignificant advances have been made in the design of centrifugal slurry pumps that are used for pumping high-density viscous and paste slurries. This paper presents the results of a series of centrifu
Jan 1, 2012
-
Development of a Blast-Induced Vibration Prediction Model Using an Artificial Neural NetworkBy S. Sinha, S. Ganguly
"In an opencast mine explosives are used for fragmentation of rock. Inefficient use of explosive energy in an opencast operation produces excessive ground vibration, which is measured by peak particle
Feb 1, 2019
-
Reaction Mechanisms Of Charcoal And Coke In The Silicon ProcessBy H. Tveit, E. H. Myrhaug, J. K. Tuset
Silicon metal as a commodity material is produced by carbothermic reduction of quartz in electric submerged arc furnaces, where CO2 forms as a by-product. Since 1997 the Norwegian Ferroalloy Producers
Jan 1, 2004
-
Mechanical behaviour of rock salt masses under high stress to strength ratio (damaging) and under very low stress to strength ratios with high confining pressure (healing)By Z. Hou
ABSTRACT: Short-term strength, damage and healing boundaries for rock salt are experimentally determined and integrated into the Hou/Lux-MDS damage-healing model. This model can be used to describe th
Jan 1, 2003
-
Shear behaviour of graphite infilled joints based on Constant Normal Stiffness (CNS) test conditionsDue to the reduction in frictional resistance, the characteristics of joint infill have a major role to play on rock mass instability. This paper elucidates the laboratory behaviour of graphite infill
Jan 1, 2003
-
Shear-flow coupling properties of a rock joint and its modelling by Geographic Information System (GIS)By Y. Mitani, F. Vallier, T. Esaki
Shear-flow coupling tests are conducted using an original apparatus, and a shear-flow coupling model using Geographic Information System (GIS) is developed in order to evaluate shear-flow coupling pro
Jan 1, 2003
-
A Comparison Of The Reheat Cracking Susceptibility Of A Service Exposed High Temperature Alloy Steel With That Of New MaterialBy R. Loots
High temperature creep resistant alloys are used in power plants as steam pipes and headers where they have to withstand super heated steam temperatures of up to 600ºC for the lifetime of the plant. F
Jan 1, 2004
-
Evaluation of rockburst energy capacity for the design of rock support systems for different tunnel geometries at El Teniente copper mineBy S. A. Villalobos, F. A. Villalobos, and L. E. Aguilera
Rockburst events have been a serious problem for many years in many mines worldwide, and in particular at El Teniente mine in Chile. El Teniente is the largest copper mine in the world, located in the
Sep 1, 2022
-
Influence of particle size on selectivity in confined bed comminution, H. Lieberwirth and L. KühnelBy L. Kühnel, H. Lieberwirth
Confined bed comminution in High Pressure Grinding Rollers (HPGR) and Vertical Roller Mills (VRM) is gaining substantial attention in many applications. Previously used mainly for milling coal or cons
Jan 1, 2020
-
Geostatistical Ore Reserve EstimationBy Roger A. Blais, Michel David
"Matheron's geoslalislical method for the estimation of ore reserves has been developed to the point at which real-life problem may be handled effectively. The steps involved in the method are:(i
Jan 1, 2014
-
Technical Operating Flexibility In The Analysis Of Mine Layouts And Schedules (719dec4a-da75-4293-bf65-16fc466b0ebb)By C. Musingwini
An often overlooked factor in the analysis of mine layouts and schedules is technical operating flexibility (or tactical flexibility), mainly due to its nebulous nature. By glossing over technical ope
Jan 1, 2007