Materials handling accident reduction in underground minesBy C. Clark, P. Patton, B. M. Stewart
Handling materials in underground mines continues to be a major safety problem. To help reduce materials-handling injuries, the National Institute for Occupational Safety and Health (NIOSH) at the Sp
Sep 1, 2001
-
Reflections on the quality of mining EIA reports in South Africa - SynopsisBy L. A. Sandham
Environmental impact assessment (EIA) in South Africa is administered by the Department of Minerals and Energy (DME) for the mining industry, and the Department of Environmental Affairs and Tourism (D
Jan 1, 2008
-
A Computerised Approach to Determining the Self-heating Propensity of CoalBy L. Wade
Laboratory testing of the self-heating propensity of coal, using crossing-point temperature and differential thermal analysis techniques, involves the frequent recording of several temperatures. The v
Jan 1, 1987
-
Analysis of Cutoff Grades Using Optimum Control TheoryBy R. Yi
The determination of the optimum cutoff grade for a surface mine may be very different from that of an underground mine because a selectable mining method may be used in the latter case. A review of r
Jan 1, 1987
-
Engineering Research And Development With Respect To J C I Backfill OperationsBy A. C. Wingrove
The paper outlines the selection of a dewatered tailings backfill system for the Johannesburg Consolidated Investment Gold Division, and covers the following aspects: (i) 16 Shaft pilot testwork;
Jan 1, 1988
-
The Mixing Of Backfill In Gold MinesThe special mixing requirements for backfilling are discussed, and the problems associated with the mixing of coarse and deslimed slurries, as well as the tailings from the gold plant are outlined. Th
Jan 1, 1988
-
An Alternative Approach to the Modelling of Deformed Stratiform and Stratabound DepositsOrebody modelling and reserve estimation are now subject to sophisticated procedures, but folded stratiform and stratabound deposits present particular problems in transforming coordinates of samples
Jan 1, 1987
-
How To Transfer Installed Power Efficiently Into Flotation Performance.By Timo Niitti, Antti Rinne, Janne Turunen, Klaus Schommarz, Sami Grönstrand
This paper captures the essential steps employed in developing Outotec?s new FloatForceTM mechanism. The development of a flotation mechanism essentially revolves around the efficient transfer of inst
Jan 1, 2007
-
Comparison Of Solvent Extraction And Selective Precipitation For The Purification Of Cobalt Electrolytes At The Luilu Refinery, DrcBy E. Minnaar, P. J. Cilliers, M. Bellino, L. M. Roux, R. Dye
The classic technique to remove impurities in a cobalt stream is selective precipitation. This is usually followed by re-leaching to produce an advanced electrolyte for cobalt electrowinning. Although
Jan 1, 2007
-
GENFLOW: An Equation-oriented Computer-aid for the Calculation of Ore-dressing Material Balances Using Performance IndicatorsBy L. C. Woollacott
A computer-aid is described that is designed to calculate steady-state material balances for ore-dressing circuits. The program determines the material balance from a specification of the process cond
Jan 1, 1987
-
Optimization of an Integrated Flowsheet for Barite ProcessingBy R. Ciccu
This paper examine the optimization of a beneficiation plant for recovering marketable barites from crude ores of different characteristics. The plant, part of a mining complex in Sardinia, consists o
Jan 1, 1987
-
Process Design Of A Regrind Facility At The Leinster Nickel Operations To Improve Concentrator Recovery (730f9c77-ea3f-4530-b6a8-5498efccd480)This paper presents the development of a regrind facility design at BHP Billiton's Leinster Nickel Operations (LNO) in Western Australia. The recovery opportunity was identified from an analysis
Jan 1, 2007
-
Improved Flotation Process Control At Newcrest?s Telfer OperationIf an orebody has been drilled to achieve some level of regulatory compliance, then a number of associated geological databases will exist, representing 10 000 to 100 000 m plus of core intervals. The
Jan 1, 2007
-
Design?a strategic issue - SynopsisA set of six design principles for rock engineering was developed by Bieniawski: design objectives; minimum uncertainty; simplicity of design components; state-of-the-art practice; optimization; and c
Jan 1, 2009
-
A General Model for Semi-autogenous and Autogenous MillingBy L. G. Austin
The paper summarizes the current state of development of simulation models for SAG and FAG mills, and gives the results of recent investigations of the physical processes occurring in autogenous grind
Jan 1, 1987
-
The Implementation Of Nos. 16 And 20 Shaft ProjectsBy L. A. Jagger
The world?s second largest producer of platinum, Impala Platinum Ltd, approved two new twin shaft projects at the end of September 2004, Nos. 16 and 20 Shafts. Both shaft projects are stand-alone enti
Jan 1, 2006
-
Geostatistical Models And Case Studies For Certain Gold Mines And The Prieska Copper Mine - 3.1 Computer ProgramsFor practical reasons all basic input data for the gold mines of the Anglovaal Group conform to a regular grid of averages of sample values within 25-ft squares in the plane of the ore body; individua
Jan 1, 1981
-
Performance Optimization of an Industrial Ball Mill for Chromite ProcessingBy Y. R. Murthy, P. K. Satija, A. Srinivasulu, S. K. Tripathy, A. Ranjan
"In this investigation, we optimize the grinding circuit of a typical chromite beneficiation plant in India. The run-of-mine ore is reduced to a particle size of less than 1 mm in the comminution circ
Jan 1, 2017
-
Interaction Of Slurry Pipe Flow With A Stationary Bed (eab14233-2963-4b47-b514-ae051e43ba35)By V. Matou?ek
The paper addresses pipe flows of aqueous medium-sand slurries at velocities lower than the deposition-limit velocity. Laboratory test results including measurements of particle concentration distribu
Jan 1, 2007
-
Potential in situ leach exploitation of back-filled Witwatersrand gold mines: parameters and flow-rate calculations from a Zambian Copperbelt analogueBy N. Steven
Published parameters from the Mufulira copper in situ leach (ISL) in Zambia are used for order-of-magnitude flow-rate calculations for an envisaged gold ISL in back-filled Witwatersrand stopes. A succ
Jan 1, 2009