Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Ground Freezing For Shoring Of Excavations - A Case History: 1405/SR522 Vault NW-6

    By Daniel Mageau

    Ground freezing has been used for over 100 years to provide shoring and ground water cutoffs for hundreds of projects worldwide, including drilled shafts, tunnels and cofferdams. Typically, these case

    Jan 1, 1998

  • DFI
    Wharf Damage Due To Settlement Of Deep Soft Subsoil ? Synopsis

    By Z. Y. Ding

    This paper emphasize two points in piled wharf design which are important than structure calculation. First, during design of piled wharf on soft stratum, the bank slope stability is the first importa

    Jan 1, 1991

  • DFI
    Assessment Of The Risk Of Pile Driving To Juvenile Fish - The Problem

    By James J. Anderson

    In this talk I will report on an effort to reassess the risk of pile driving to juvenile salmonids migrating through Puget Sound. The study was motivated by the concern of the construction industry th

    Jan 1, 1990

  • DFI
    Modification of Best-Fit Interpretation Method for Ultimate Capacity of Screw Pile

    By Adnan A. Malik, Tadashi Maejima, Jiro Kuwano

    "ABSTRACTTheoretical approach to estimate the ultimate pile capacity gives a rough idea at the initial stage of design that later on strengthen by the execution of static pile load test at site. The s

    Jan 1, 2014

  • DFI
    Accessing History

    By Richard Pizzi

    Built in 1806, Boston's African Meeting House is the oldest surviving Black church building in the country. A $7 million dollar renovation was begun in 2006 to restore this historic building to

    Jan 1, 2011

  • DFI
    Post-Tensioned Diaphragm Wall "T" Panels For Large Unbraced Excavation Spans - Introduction

    By Nino Catalano

    The combination of two top levels of cross-lot braces designed and installed to act as a truss, and vertical post-tensioning of the panels allow the unbraced excavation of a 36' span. Philoso

    Jan 1, 1994

  • DFI
    Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing Results

    By Yogesh Prashar

    Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December

    Jan 1, 2002

  • DFI
    Combined Loading Tests On Large Diameter Piles

    By A. Lyndon

    Combined loading tests are described to three 1.2m diameter cast-in-place bored piles, 12m long, formed through cohesionless material into stiff sandy clay. The maximum loading conditions imposed at t

    Jan 1, 1989

  • DFI
    Continuous Flight Auger Piles In The Blue Ridge: A Case Study Using Instrumentation In Pile Design

    By Jesse R. Jacobson

    A large casino complex in Cherokee, North Carolina recently underwent a $633 million expansion that involved substantial foundation challenges. The site is located in a valley on the southern edge of

    Jan 1, 2011

  • DFI
    Pile Foundation Response to Ground Vibration from Rock Blasting

    By Anthony T. C. Goh, Zhiye Zhao, Laddu B. Jayasinghe, Hongyuan Zhou, Yilin Gui

    "Ground vibrations from blasting are undesirable and they are very short in duration with high principal frequencies and high amplitude. Structural response to that kind of excitations may differ sign

    Jan 1, 1900

  • DFI
    Large Diameter CIDH Construction In Cohesionless Soils By The Use Of Rotator/Ocsillator Techniques: A Case Study - 116th Avenue Bridge Over The Gila River Phoenix, Az.

    By M. Cornelius

    Drilled shaft construction through caving soils has historically been an uncertain, risky and costly operation. Uncertain, because the zone of caving may or may not be known, risky because the loss of

    Jan 1, 1999

  • DFI
    Construction Considerations For Ground Modification Projects ? Synopsis

    By J. P. Welsh

    Ground Modification construction is rapidly evolving in the United States. An assessment of the construction status of Ground Modification methods with their dates of introduction and general acceptan

    Jan 1, 2010

  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Program Development - Background - Collapse

    By Darrell L. Beddard

    The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western

    Jan 1, 1996

  • DFI
    CPT Methods for Helical Pile Design

    By Howard A. Perko, Margaret Dring, Gerald Verbeek, Scott Slaughter

    Helical piles have become a widely used deep foundation system in recent years due to their many inherent advantages. The cone penetration test (CPT) is commonly used in geotechnical practice to evalu

    Sep 8, 2021

  • DFI
    "Underpinning By Jet Grouting" - Summary

    By George K. Burke

    Underpinning of a structure has been traditionally expensive, time consuming, and, in many cases, caused as much settlement to the existing structure as it was trying to prevent. As underpinning is no

    Jan 1, 1991

  • DFI
    Rehabilitation of the Kölnbrein Dam / Austria

    By Frank Haehnig, Kurt Kogler

    "With a height of 200 m, a crown width of 626 m and a concrete volume of 1.6 million m³, the Kölnbrein Dam in the upper Malta valley in Carinthia / Austria is the largest concrete dam in Austria. Boas

    Jan 1, 2016

  • DFI
    Insight to Foundation Construction of Extradosed - 3rd Narmada Bridge over River Narmada, Bharuch, Gujarat

    By Ekhlaq A. Khan

    "The new third Bridge over Narmada River at Bharuch which was recently completed is characterized by some aesthetically appealing elevations of the pylon and large size of the deck. This paper gives a

    Jan 1, 2017

  • DFI
    Design And Preliminary Investigations For Deep Foundations Of The Charleroi Locks River Wall Project, Monessen, Pennsylvania

    By Brian H. Greene

    The U.S. Army Corps of Engineers, Pittsburgh District, is in the final phases of modernizing the locks and dams on the Monongahela River. One facet of this modernization is to replace the existing Lo

    Jan 1, 2006

  • DFI
    Project Specifc Design Criteria I-880 Reconstruction Project, Oakland, California

    By Steve Thoman

    After the 1989 Loma Prieta Earthquake, the California Department of Transportation (Caltrans) initiated an overview of the Caltrans Bridge Design Specifications (BDS) and bridge seismic design practic

    Jan 1, 1996

  • DFI
    Piled Raft On Layered Soils

    By Luca de Sanctis

    The analysis of piled raft foundations in layered soils may be performed by 3D finite elements or by approximate procedures. Among the latter, the code NAPRA (Russo, 1998) is based on the method of th

    Jan 1, 2002