Measured and Modeled Settlements of Power Plant on Piled Raft Foundations (2734870e-dd47-46f3-a815-25575798a774)By Alireza Ayoubian, Douglas S. Roy, Gianni O. Chieruzzi
"A 400 MW, gas-fed power plant on floating piles and piled raft foundations was constructed in the Province of Moskovskaya, Russia in 2008. The subsurface is characterized by fill underlain by loose t
Jan 1, 2017
-
Switching From Monetary Process Management To Critical Success Factors Using An Appropriate Process Information SystemBy Jochen Maurer, Dr. Christian Hoyme, Dr. Hans Regler
Currently, it is very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. As a rule, companies depend on reports from on-site e
-
Silver Star Motors “Tackles” Brownfield Site and Adjacent NYCT SubwayBy Dharmil Patel, Michael J. Chow
"Construction progress is nearing completion at a Brownfield Site for a 100,000sf mixed-use 10 story building plus cellar for Silver Star Motors including a two-floor pre-owned Mercedes Benz showroom;
Jan 1, 2016
-
Cased CFA Pile – An Alternative Piling Method – A Chance for Technical and Economical SolutionsBy John R. Grillo, Gordian Ulrich, Franz-Werner Gerressen
Most geotechnical construction professionals are aware of piling using hydraulic drill rigs and the so-called Kelly drill mode. Kelly drilling has many advantages as it can work with a wide range of t
Jan 1, 2019
-
Improved Drainage by Drilled Filter Drains, Dam Safety Upgrade, Case StudyBy Carl-Oscar Nilsson, Åke B. Nilsson
"The embankment dam at Storfinnforsen is 23 m high and was completed in 1954. The dam has an impervious zone with timber sheet piles and a support fill of glacial till. The pore water pressure in the
Jan 1, 2016
-
Hybrid Excavation Support System for the Union Station Revitalization ProjectBy Charles G. Crans, Naresh Gurpersaud
"Toronto’s Union Station, a National Historic Site occupying an entire city block, is the busiest commuter rail transportation hub in Canada. An extensive project is being undertaken to revitalize Uni
Jan 1, 2017
-
4 Equipment Installation: Recent Developments - Equipment Installation - Recent Developments: General Report On 'Deep Foundation Installation Monitoring' - 1. IntroductionBy B. De Paoli
At Pietrafitta, between Assisi and Perugia, ENEL (Italian National Electricity Authority) has for some time been managing a power-station operated with lignite, mined from an open mine on the way to e
Jan 1, 1994
-
TBM Recovery Shaft Construction - SR-99 TunnelBy Lance Rasband, Richard Hanke, John Starcevich
"The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure
Jan 1, 2016
-
Estimation Of Maximum Unit Side Resistance In Drilled Shaft Foundations From Partially Mobilized Load-displacement DataBy Ramin Motamed, Anna Panorska``, Joseph A. W. Toth
In this study, a dataset of 145 bi-directional and static load tests was used to evaluate the load-displacement response with respect to unit side resistance for drilled shafts comprising fully and pa
-
Jet Grouting at the West Toronto Diamond Grade Separation ProjectBy Jim Bruce, Naresh Gurpersaud
"The West Toronto Diamond project, under construction since 2006 and due to be complete in 2015, is a rail-to-rail grade separation project in the heart of urban Toronto. Once complete, a depressed co
Jan 1, 2017
-
Construction Of The Main Tower Pier Caissons For The Greenville Bridge In MississippiBy F. Keith Jacobson
To be involved in the construction of a deep dredged caisson for a major bridge pier is one of the most rewarding and professionally challenging experiences one can have in the bridge construction bus
May 11, 2007
-
Deep Mixing Field Trials for Land Remediation: Some 3-Year Results from the SMiRT ProjectBy Ziyad Abunada, David O’Connor, Fei Jin, Abir Al-Tabbaa
"In-situ remediation of contaminated land with deep mixing can enable a multi-technique remedial strategy on the same site combining low permeability barriers, permeable reactive barriers, stabilisati
Jan 1, 2015
-
Use of Post-Grouted Drilled Shafts in Coastal MississippiBy Jacob A. Jordan, Rachel M. Garrett, W. Robert Thompson III, James C. Pegues
"Environmental control structures for an existing fossil-fuel power generating plant near Pascagoula, Mississippi faced several design and construction challenges due to space limitations. Conceptual
Jan 1, 2015
-
Blast Densification Of Fine TailingsBy Brian W. Wilson
A case study is presented that describes the design and implementation of a combined blast densification and deep dynamic compaction program which was undertaken to improve the foundation soils for a
Jan 1, 2010
-
Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)By I. D. Dayal, Anil Kumar Jain
"Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat
Jan 1, 2016
-
Secant Pile Walls - A Consistent Approach to Risk ManagementBy Vivian M. Troughton, Clifford J. Wren, Tony P. Suckling
"Secant pile walls are used for the construction of deep basement walls and earth retaining structures. Risk associated with secant pile walls is commonly perceived as being the safety of site personn
Jan 1, 2005