Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    CO2 mitigation technologies in the steel industry: a benchmarking study based on process calculation

    By Jean-Pierre Birat, François Hanrot, Gérard Danloy

    Global warming presents an enormous challenge to the steel industry, which is both carbon-intensive and energy efficient. Lean production can provide some short-term emission mitigation, at the level

    Jan 1, 2004

  • CIM
    A New Approach to Infer Reservoir Dilation Using a Limited Number of Tiltmeter Measurements

    By Asanga S. Nanayakkara

    The surface deformations induced by reservoir dilations can be measured using tiltmeters and these measurements can be used to infer reservoir level volume changes by solving an inverse problem. Prefe

    Jun 1, 2012

  • CIM
    Flin Flon Open Pit

    By M. A. Roche

    The property of the Hudson Bay Mining & Smelting Company, Limited is located at Flin Flon lake, 85 miles northwest of The Pas, Manitoba, on the Manitoba-Saskatchewan boundary. The area is at latitude

    Jan 1, 1933

  • CIM
    The Frood Ore Deposit: A Suggestion as to its Origin

    By C. V. Corless

    THE origin of various types and groups of ore deposits was some years ago a subject of much controversy. To this statement the copper-nickel deposits near Sudbury afforded no exception. Not since the

    Jan 1, 1929

  • CIM
    Computer-Based Simulation of the Construction Process in the Anode Baking Furnaces

    By C. Gaubert, G. Bourassa

    "The construction or rebuild process in the anode baking furnaces has been modeled with the software Rockwell Arena, in order to minimize the process cost and risk. The case study was focused on the s

    Jan 1, 2006

  • CIM
    Gas Phase Adsorption and Surface Area Determination of Minerals

    By T Salman

    The construction and use of the B.E.T. (gas adsorption) apparatus is described. Examples are given for the determination of large and small surface areas using nitrogen and krypton. Introduction A NY

    Jan 1, 1965

  • CIM
    The guide to the evaluation of gold deposits: integrating deposit evaluation and reserve inventory practices

    By Deni Côte, Marcel Vallée

    "The Guide to the Evaluation of Gold Deposits reviews the successive evaluation steps in the domains of geology, engineering, and economics. The Guide analyzes, in a systemic perspective, the sequence

    Jan 1, 1992

  • CIM
    Surface Properties and Floatability of Zircon

    By Hyumng Sup Choi

    The role of the interfacial electrical 'Condition on the adsorption of col-lectors on mineral surfaces has been studied by electrophoretic mobility and adsorption measurements made on zircon. Fro

    Jan 1, 1963

  • CIM
    Loading and Blasting a Hot Pillar Remnant

    By Roland Hunt

    This paper deals with the practical problems as sociated with blasting a heated pillar remnant. This pillar remnant was the final stage in the blasting of a multi-stag e pillar blast. Production from

    Jan 1, 1977

  • CIM
    Quantitative Microscopic Analysis and its Application to Mining Problems

    By J. Ellis Thomson

    For many years the value of qualitative microscopic investigation has been recognized in both of the fields of pure and applied science. In particular, its aid has been invoked in the determination of

    Jan 1, 1930

  • CIM
    Notes on Block Caving at the King Mine of the Asbestos Corporation, Limited, Thetford Mines, Quebec

    By J. G. Ross

    A DESCRIPTION of the block-caving system of mining as practised at the King mine of Asbestos Corporation, Limited, Thetford Mines, Que., was presented. at the Annual Meeting of the Institute held in Q

    Jan 1, 1936

  • CIM
    Improved Gold Extraction from a Refractory Arsenopyritic Ore by Chemical Pretreatments

    By Sandra L. Mesa-Espitia, Gretchen T. Lapidus

    Gold present in arsenopyrite matrices is refractory and requires highly oxidative pretreatments in order to obtain acceptable degrees of extraction. However, these release many byproducts that are har

    Jan 1, 2014

  • CIM
    Mechanism of Alkaline Earth Metal Ion Adsorption on Sulphide Minerals

    By J. A. Finch, M. Mimezami, M. S. Hashemi A.

    The adsorption of magnesium and calcium ions on sphalerite and pyrite is discussed. These ions are common in process water and often considered be detrimental in sulphide flotation. The study attempts

    Jan 1, 2009

  • CIM
    How Sherritt Gordon Receives and Handles Phosphate Rock

    By W. R. Middagh, R. M. Garvey

    "Phosphate rock is shipped by boat from Florida to Vancouver, B.C., where it is unloaded and stored in a 50,000-ton silo. It is shipped from Vancouver in 100-ton hopper cars in 80-car trains to Fort S

    Jan 1, 1968

  • CIM
    Western Canadian Plains - A New Challenge to Geophysics

    By A. F. Beck

    Abstract Canada has opened up a geological province in ?Western Canada which offers a new .stimulus to oil exploration geophysics. The problems of instrumental technique, interpretation, and log

    Jan 1, 1950

  • CIM
    The Rexspar fluorite and uranium deposits

    By Jean Descarreaux

    "The Rexspar uranium deposits are located near Birch Island in central British Columbia. The property lies within the Omineca crystalline belt of the Cordilleran Orogen. Gneiss, schist, tuffaceous and

    Jan 1, 1986

  • CIM
    Appendix I - The Art of Creating a Financially Rewarding Royalty

    By Craig Haase

    A. Introduction

    Jan 1, 2003

  • CIM
    Renovation of the drainage system at Ineo's Pipe Open Pit

    By R. G. Achter, E. Wilson

    "This paper describes the work undertaken to renovate the Pipe Open Pit drainage system, incorporating measures to improve effluent quality. It describes the technical feat of drilling an l l-inch-dia

    Jan 1, 1980

  • CIM
    The Use of Rubber Mill Liners at Cominco's Sullivan Concentrator

    By A. H. Winckers

    "The Sullivan Mine and Concentrator are owned and operated by Cominco Ltd. and are located in the Rocky Mountain Trench, in Kimberley, British Columbia.The Sullivan Concentrator commenced operation in

    Jan 1, 1981

  • CIM
    Modifications of the CCD Circuit at Cameco's Key Lake Uranium Operation

    By Charles "Chick" Rodgers, Anthony Sarion

    "With declining feed grade and increased production targets, it became necessary to upgrade Key Lake's eight stage counter current decantation (CCD) circuit. Following laboratory trials, mill operatio

    Jan 1, 1998