Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Heat Balance Control Changes- Further Steps and Safety Issues

    By T. Kho, W. Zhang, M. E. Reed

    The control of flash furnace heat balances is critical. Suspension smelting control and stability comes from stable operation of the heat balance, and this leads to a stable reaction shaft exit temper

    Jan 1, 2019

  • CIM
    Application of a dynamic material balance program to an industrial flotation circuit

    By A. R. Trusiak, C. Bazin, D. Hodouin

    "The On-Stream Analyzer has proven, and is still proving to be, an extremely valuable tool for the control of flotation circuits. This paper examines the possibility of going further in the utilizatio

    Jan 1, 1995

  • CIM
    Une mine à Madagascar: Les défis de la biodiversité.

    By Benoit Taillon

    Contenu de la presentation 1. Le projet QMM et son contexte 2. Gérer la biodiversité 3. Résultats obtenus QMM QIT Madagascar Minerals S.A. ? JV: Rio Tinto (80%) et Madagascar (20%) ? Trois gise

    May 1, 2011

  • CIM
    Peirce-Smith Converters: Automation, Design, Operation and Environmental Improvements at Kansanshi Copper Smelter

    By David deVries, James Rajith, Paul Mascrenhas, Nurzhan Dyussekenov, Lawrence Hanschar

    Kansanshi Copper Smelter commenced operation in March 2015. The smelter features four Peirce- Smith Converters (PSCs) operated in a three hot, two blowing configuration. This paper describes some of t

    Jan 1, 2019

  • CIM
    Effective Modeling and Estimation of Stratified Deposits

    By Garth D. Kirkham

    The Problem The Don deposit is a series of two sub-vertical zones that pose a number of challenges with respect to modeling and interpolation. The first challenge is that, based on data and observa

    May 1, 2013

  • CIM
    Jameson Cell Testing at the Kidd Creek Concentrator

    By R. Tremblay, M. Burrows

    "In the summer of 1990, pilot scale testing of a Jameson cell was carried out at Falcon bridge Limited, Kidd Creek Division. The Jameson cell is self aspirating and has fewer mechanical parts, thus it

    Jan 1, 1993

  • CIM
    Dust Collection Methods for Primary and Secondary Crushing

    By M. Redfearn

    "DUST COLLECTION EQUIPMENT LIST Primary Dust CollectorModular Mikro-Pulsaire - Model 2G1-96TR Capacity: 20,000 c.f.m.Bags: Total of 288; 8' x 4 1/2"" diameterMaterial: Dacron HCE feltAir to cloth rati

    Jan 1, 1976

  • CIM
    Aboriginal Economic Partnerships

    By Andrew Popko

    Introducing EnCana ?? A leading North American Oil and Gas company ?? Focused on natural gas and oil sands development in 12 key resource play areas across North America ?? In 2007, over 4300 well

    May 1, 2008

  • CIM
    Secondary alkali feldspars in porphyry systems (5df3adb1-c1f4-4346-a834-98a335583e98)

    By Craig H. B. Leitch

    "In describing the alteration of porphyry systems, the term ""secondary K-feldspar"" appears to be an oversimplification. A better term would be ""alkali feldspar"" alteration, because in actual fact

    Jan 1, 1981

  • CIM
    The Utilization of Low-Grade Domestic Chromite

    By D. W. Morgan, K. W. Downes

    "OVER half a million tons of chromite ore is used annually on the North American continent, all of which is imported from overseas. Chromite is essential in the manufacture of stainless steel, armour

    Jan 1, 1952

  • CIM
    Secondary alkali feldspars in porphyry systems

    By Craig H. B. Leitch

    "In describing the alteration of porphyry systems, the term ""secondary K-feldspar"" appears to be an oversimplification. A better term would be ""alkali feldspar"" alteration, because in actual fact

    Jan 1, 1981

  • CIM
    Heap Leaching of Gold Ores in Permafrost Conditions

    By V. I. Lakshmanan, I. G. McColl

    "Heap leaching of gold ores in permafrost conditions is feasible provided certain criteria are met. These criteria include relatively short heap leach residence time and the availability of waste heat

    Jan 1, 1987

  • CIM
    Geology of the Voisey’s Bay Ni-Cu-Co Deposit, Labrador, Canada

    By Rosie Moore, Harvey Keats, Kerry Sparkes, A. J. Naldrett

    "Abstract-The Voisey’s Bay Ni-Cu-Co deposit was discovered in late 1994 as the result of prospecting initiated in the summer of 1993. By July 1995, proven mineable reserves were 31.7 x 106 tonnes grad

    Jan 1, 1996

  • CIM
    A New Device to Enhance Oxygen Dispersion in Gold Cyanidation

    By Ralph Harris, Javier Jara

    "Oxygen is essential in gold cyanidation. It is supplied to the leaching media by sparging oxygen or compressed air into the cyanidation tank. The rate of oxygen transfer is critical to achieve the de

    Jan 1, 1994

  • CIM
    Optimization of Effective Parameters in Gold Extraction Process from Poly Metal Ore, Using Thiourea as a Cyanide Alternative and Sodium Cyanide

    By P. Karimi, A. Amini, H. Abdollahi, A. Mirzaeian

    Due to detrimental effects of cyanidation process on the environment in gold industry, application of cyanide alternatives such as thiourea are being highly considered in recent projects. In this stud

    Jan 1, 2016

  • CIM
    The Problem of Acid Mine Drainage in Ontario

    By Kim H. Shikaze, John R. Hawley

    "Even though acid mine drainage is an old problem, particularly in coal mining areas, its appearance in the form of a major environmental hazard in the hardrock mining districts of Ontario was unexpec

    Jan 1, 1971

  • CIM
    Laboratory Flotation Separation of Inco "Bulk" Matte

    By A. Mukherjee, C. Kelly, B. Markovich, G. E. Agar, G. E. Robertson, F. Khan, B. Shea

    "Laboratory batch flotation tests were performed on a sample of bulk slow cooled converter matte (Cu:Ni = I) to optimize the time in each of the separation stages. Numerical simulations were carried o

    Jan 1, 1996

  • CIM
    Texada Island limestone quarry

    By P. M. STILES

    Acquired in 1957, the limestone quarry of Ideal Basic Industries on Texada Island north of Vancouver has become a major supplier of high purity limestone and construction stone. Crushed limestone prod

    Jan 1, 1984

  • CIM
    Computer-assisted mine production planning

    By J. W. Hendry

    "This paper will discuss the application of tools and the evolution of computer-assisted procedures in the production planning process at Quintett e Coal Limited (QCL). In 1986, QCL produced 5.3 Mt of

    Jan 1, 1988

  • CIM
    Real Time Monitoring of Cemented Paste Backfill

    Real Time Monitoring of Cemented Paste Backfill Introduction Methods ?how to instrument a Long Hole stope Key Results from 2 case studies: barricade pressures and displacement, in-stope pressure

    May 1, 2010