Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Mineralization Associated with Archean Gabbro-Anorthosite Intrusions, Rainy Lake Area, Northwestern Ontario

    By K. H. Poulsen, C. J. . Hodgson

    Synvolcanic, layered gabbro-anorthosite sills at Rainy Lake, Northwestern Ontario, reflect a combination of igneous processes including fractional crystallization, wall rock assimilation and possibly

    Jan 1, 1984

  • CIM
    On-Stream Analysis by X-Ray Spectrograph

    By P. Shibley, P. R. Clarke

    Since this was an interim report of the initial operation of a long term project it is not available for publication. It is expected when the project is completed a full report of the work will be pub

    Jan 1, 1968

  • CIM
    Electrokinetic and Settling Behaviors of Aurora Oil Sands Tailings

    By C. Liu

    Zeta potentials and settling rates of an oil sands tailings sample taken from Syncrude Canada Ltd's Aurora Stacker Pilot Operation were studied. Two clay minerals, kaolinite and illite, were also

    Jan 1, 2006

  • CIM
    The Sigma-Lamaque Complex : A New Geological Approach

    By Carl Pelletier

    The Sigma-Lamaque Complex is considered a lode-gold deposit characterized by narrow vein structures, which have been mined historically by underground methods. In addition to the narrow vertical struc

    May 1, 2001

  • CIM
    Technology Options for Exploiting Deep-Seated Lignite Deposits in India

    By B. Surender Mohan

    Mother Earth being a treasure of minerals, it is prime duty of the mankind to preserve this natural source to ensure steady growth of the nation. Utmost care is to be taken to see that these natural r

    Aug 1, 2013

  • CIM
    Mine to Mill Approach to Optimize Power Consumption in a Process Plant Operation by Modelling and Simulation

    By D. Runnels, Daniel Roy, Ricardo Esteban, J. Torrealba-Vargas

    "An intuitive way to reduce power consumption in grinding operations is to feed the grinding circuit with finer feed by enhancing blasting and fragmentation control. The optimization of blasting with

    Jan 1, 2016

  • CIM
    Effect of Process Conditions on Froth Stability in an Industrial Copper Flotation Circuit

    By G. Bartolacci

    In a COREM-McGill collaborative research and development project, gas dispersion parameters and froth properties were manipulated in a copper flotation plant to study interactions between the collecti

    Jan 1, 2007

  • CIM
    Control of crossover in direct methanol fuel cells through fuel modification

    By A. Lam

    The use of a liquid fed direct methanol fuel cell (DMFC) as a power source for micro and small portable applications is attractive due to its system simplicity, low temperature, etc. The aqueous metha

    Jan 1, 2005

  • CIM
    Automatic Object Recognition and Registration of Dynamic Construction Equipment from A 3D Point Cloud

    By Mengmeng Gai

    This paper introduces a model-based automatic object recognition and registration framework to assist heavy equipment operators in rapidly perceiving 3D working environment at dynamic construction sit

    Aug 1, 2013

  • CIM
    Laboratory Tests on the Parameters Affecting Iron Precipitation from Non-Decopperized Nickel Anolyte

    By M. B. Greyver

    The results of laboratory tests on iron precipitation from non-decopperized nickel anolyte are discussed. The parameters (pH, oxygen consumption and stirring speed) for iron precipitation from the ano

    Jan 1, 2006

  • CIM
    Methane Conditions in 11 Seam

    1.Assessment of methane content in coal. Given a naturally low methane content in 11 Coal Seam and the fact that the areas of the 11 Seam adjacent to the tunnelway were degassing for a very, very lon

    May 1, 2003

  • CIM
    A Mathematical Model for Carbothermic Reduction of Dust-Carbon Composite Agglomerates

    By Kuwauchi. Y., M. Barati

    Recycling of dust using a rotary hearth furnace (RHF) has gained considerable attention in the past two decades for the sustainable production of steel with less environmental impact. In order to furt

    Jan 1, 2011

  • CIM
    Time?Temperature?Transformation (TTT) Diagram of Caustic Calcined

    By K. Ebrahimi-Nasrabadi

    The dependence between the extent of conversion of cryptocrystalline magnesite to caustic magnesia was studied experimentally in the temperature range of 400?1200 °C and for calcination times up to 8

    Aug 1, 2013

  • CIM
    Implementation of Air Liquide Shrouded Injector (ALSI) Technology at the Thai Copper Industries Smelter

    By N. Wachgama, J. P. T. Kapusta, R. U. Pagador

    The Thai Copper Industries smelter (Thai Copper) is located some 200 km southeast of Bangkok near the MapTaPhut deep sea port in one of the industrial centres of Thailand. Although construction of the

    Jan 1, 2007

  • CIM
    Government Versus Voluntary Sediment Pond Design Standards and Achieving Discharge/Receiving Water Quality for Total Suspended Solids at Mine Sites

    Keeping the sediment on the mine site and out of the water course is essential from the regulatory, environmental and sustainability perspectives. Regulation of this aspect of mining is embedded in en

    Aug 1, 2013

  • CIM
    Recovery of Nickel from Lime Treatment Sludge by Leaching and Ozonation

    By F. Barriga-Ordonez, J. A. Finch, L. Calzado, S. R. (Ram) Rao

    Sludge, formed by lime treatment of acidic drainage and stored in tailing ponds of the Sudbury region, contains 5-7% Ni, mostly in a mix of hydroxides with Fe (~ 10%), Mg (~ 10%) and Cu (-0.5%), and C

    Jan 1, 2005

  • CIM
    Investigation of Intermediate Species and Electrochemical Dissolution of Chalcopyrite in the Presence of Sulfur and Iron Oxidizing Microorganisms

    By Minghao Hu, Hongbo Zhao, Jun Wang, Wenqing Qin, Rui Liao, Central South University

    "In the present work, X-ray diffraction (XRD) analysis, X-ray photoelectron spectroscopy (XPS) analysis and electrochemical analysis were carried out to investigate the intermediate species and electr

    Jan 1, 2016

  • CIM
    Electrochemical Studies of the Gold-Electrolyte Interface under Thiosulfate Based Leaching Conditions

    By A Frydrychewicz, J. Mirza, J. Lipkowski

    The objective of this work was to understand the mechanisms of action of additives, such as thiourea, that enhance gold leaching in thiosulfate solution. The leaching reaction and surface passivation

    Jan 1, 2011

  • CIM
    Feasibility analysis of methanol fueled SOFC systems for remote distributed power applications

    By M. Staite

    This paper analyzed the feasibility of converting a 5kW natural gas SOFC power generator system designed to operate on natural gas to be fuelled by methanol. The analysis included laboratory methanol

    Jan 1, 2005

  • CIM
    Important Factors for Effective Slag Splashing

    By K. D. Peaslee

    Slag splashing is an important development that has dramatically improved BOF vessel campaign life and reduced operating costs. This paper highlights research from physical modeling work using a 1/8-s

    Jan 1, 2004