Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Effects of Coating Speed and Substrate on Catalytic Titanium Anodes

    By Michael S. Moats, Prashant Bagri

    "In recent years with increasing concerns about energy consumption in hydrometallurgical processing, there is an ongoing attempt to use Catalytic Titanium Anodes (CTAs) for copper electrowinning. For

    Jan 1, 2016

  • CIM
    Application of CEET at Barrick's Goldstrike Operation

    By Steve Custer, Chris Bennett, Patrick Garretson, Glenn Dobby, Jacques McMullen

    "Barrick Gold is in the process of expanding one of its grinding circuits at the Goldstrike property as a response to both increasing ore hardness and increased ore sensitivity to finer grinding as it

    Jan 1, 2001

  • CIM
    Effect of Superheat and Section Thickness on Flow Characteristics for Thin Section LFC of Hypereutectic Al-Si Alloys

    By A. Haldar

    This study focuses on the flow characteristics of hypereutectic Al-Si alloys in thin sections. The pattern assembly consisted of spiral horizontal patterns, 6.25 mm (0.25 inch) and 12.50 mm (0.50 inch

    Jan 1, 2007

  • CIM
    Along-channel water and thermal management for PEMFCs

    Proper water and thermal management is essential for obtaining high performance of Proton Exchange Membrane Fuel Cells (PEMFCs). A steady, two-dimensional water and thermal management model was develo

    Jan 1, 2005

  • CIM
    Metallurgical Balance As A Management Tool In Processing Plant

    By V. H. Valenzuela

    Materials in process or in stocks are quite relevant items in almost every plant, particularly in mining operations, where efficiency in rate of recovering material of interest becomes a key issue whe

    Jan 1, 2007

  • CIM
    Regulatory Tendencies And Abatement Technologies Used In The Chilean Copper Industry

    By M. Sanchez

    In the last decades, the Chilean copper mining and metallurgical industry have had to modify their technological processes to meet the environmental regulations implemented by the Chilean government,

    Jan 1, 2007

  • CIM
    Strength, Deformation and Thermal Parameters of Rocks Heated to High Temperatures

    By Piotr Malkowski

    Studies on the properties of rocks heated to high temperatures are rather rare. Such research is occasionally conducted for example; in areas around nuclear power plants. The national Polish coal gasi

    Aug 1, 2013

  • CIM
    AG Milling with and Without Pebbles Recycle - Effect on Multi-Component Ore Deportment and Throughput

    Palabora Mining Company (PMC) processes a multi-component ore body using a circuit consisting of two AG mills in parallel, closed with vibrating double deck screens and hydrocyclones. The bottom scree

    Jan 1, 2012

  • CIM
    The POP Project (Process Optimization Project) Development and Transfer of Modern Optimization & Control Tools and Methods for Mineralurgical and Metallurgical Processes

    By S. Caron

    From the early 70?s, ?Centre de Recherche Minérale? (CRM) has conducted and co-ordinated Research and Development activities for the mineralurgical and metallurgical industries. Since 1999, CRM has co

    May 1, 2001

  • CIM
    Mixing Times and Correlation for Dual Plug Stirred Ladle: Quantifying the Role of an Upper Buoyant Phase

    By D. Satish Kumar, D. Mazumdar

    "95% bulk mixing times in three different size water model ladles of a 140 T cylindrical shaped , dual plug ( located diametrically opposite at mid bath radius position) stirred, industrial ladle were

    Jan 1, 2004

  • CIM
    Geochemical Exploration In The Canadian Shield State Of The Art: Closing Remarks

    By C. F. Gleeson

    "I HAVE BEEN ASSIGNED the pleasant task of adding a last word in way of summary to this session. I think that the trend set in having a geochemical session at the CIM Annual General Meeting is a good

    Jan 1, 1971

  • CIM
    A Novel Framework for Modelling Flotation Column Hydrodynamics

    By P. R. Brito-Parada, G. Bhutani

    "The physical processes occurring in flotation columns are very complex as they take place at different scales over a range of sizes and multiple phases. Column design and optimum operating parameters

    Jan 1, 2016

  • CIM
    Performance management - an implementation process

    By B. L. Dorey

    "Performance management is a systematic, practical approach to managing people. It is founded on some basic assumptions about people and is designed to focus on people in the work place. Organizing me

    Jan 1, 1989

  • CIM
    New technology for the abatement of SO2 in nonferrous pyrometallurgical processes by a dry limestone scrubber

    By F. Parada, R. Parra

    "The neutralization process of SO2 from coal burning plants is a well-defined technology using limestone to form CaSO4 according to the following reaction: CaCO3 + SO2(g) + 1/2O2(g) = CaSO4 This paper

    Jan 1, 2007

  • CIM
    Hydrogen Mitigation In The Mcclean Lake Uranium Leaching Circuit– An Update

    By W. McCombe, G. Remple, L. Nightingale-Mercer

    The McClean Lake Mill is located approximately 850 kilometres north of Saskatoon, Saskatchewan, Canada, and is operated by Orano Canada Inc. (Orano). The mill was designed to process high grade uraniu

    Jan 1, 2020

  • CIM
    A Reservoir Study of the Excelsior Pool

    By W. A. Bain

    "AbstractProduction from the Excelsior Reservoir has amounted to approximately one million barrels. This production has caused a 'Pressure •drop of 10 p.s.i. from the original pressure of 1,245 p.s.i.

    Jan 1, 1952

  • CIM
    Subsurface Tiltmeter Observations of Solid Earth Tides and Rock Excavation in Northeastern Illinois

    By C. E. Lancelle, J. T. Volk, H. F. Wang, D. Fratta

    "The Main Injector Neutrino Oscillation Search (MINOS) Near Detector Hall at Fermilab and the Lafarge – Conco Mine are located approximately 100 meters underground in the Galena-Platteville dolomite j

    Jan 1, 2015

  • CIM
    Stoping at Noranda

    By O. Hall

    STOPING at Noranda" is a sequel to "Mining at Noranda". "Mining at Noranda", presented in 1937 (1), sketches Noranda's history, metallurgical problems, exploration, mining methods, mining detail

    Jan 1, 1939

  • CIM
    Geophysical Case Study of the Iso and New Insco Deposits, Québec, Canada, Part I: Data Comparison and Analysis

    By D. Bois, P. Keating, J. Lemieux, M. A. Vallée, M. Allard, R. S. Smith, L. Z. Cheng, M. Chouteau, D. K. Fountain

    "Abstract -A test survey using the MEGATEMII airborne electromagnetic system was flown over the Iso and New Insco massive sulfide orebodies in the Rouyn-Noranda mining camp, Canada. The results were c

    Jan 1, 2006

  • CIM
    Process Scale-up For Uranium, Mercury And Cesium Recovery From Surrogate Radioactive Cemented Waste

    By A. Demers, M. Chapman, N. Reynier, R. Lastra, M. Courchesne, C. Laviolette

    Historic medical isotope production at Canadian Nuclear Laboratories (CNL) in Chalk River involved the dissolution of irradiated isotope targets prior to extraction of Mo-99. This process generated li

    Jan 1, 2020