Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Effects of Coating Speed and Substrate on Catalytic Titanium AnodesBy Michael S. Moats, Prashant Bagri
"In recent years with increasing concerns about energy consumption in hydrometallurgical processing, there is an ongoing attempt to use Catalytic Titanium Anodes (CTAs) for copper electrowinning. For
Jan 1, 2016
-
Application of CEET at Barrick's Goldstrike OperationBy Steve Custer, Chris Bennett, Patrick Garretson, Glenn Dobby, Jacques McMullen
"Barrick Gold is in the process of expanding one of its grinding circuits at the Goldstrike property as a response to both increasing ore hardness and increased ore sensitivity to finer grinding as it
Jan 1, 2001
-
Effect of Superheat and Section Thickness on Flow Characteristics for Thin Section LFC of Hypereutectic Al-Si AlloysBy A. Haldar
This study focuses on the flow characteristics of hypereutectic Al-Si alloys in thin sections. The pattern assembly consisted of spiral horizontal patterns, 6.25 mm (0.25 inch) and 12.50 mm (0.50 inch
Jan 1, 2007
-
Along-channel water and thermal management for PEMFCsProper water and thermal management is essential for obtaining high performance of Proton Exchange Membrane Fuel Cells (PEMFCs). A steady, two-dimensional water and thermal management model was develo
Jan 1, 2005
-
Metallurgical Balance As A Management Tool In Processing PlantBy V. H. Valenzuela
Materials in process or in stocks are quite relevant items in almost every plant, particularly in mining operations, where efficiency in rate of recovering material of interest becomes a key issue whe
Jan 1, 2007
-
Regulatory Tendencies And Abatement Technologies Used In The Chilean Copper IndustryBy M. Sanchez
In the last decades, the Chilean copper mining and metallurgical industry have had to modify their technological processes to meet the environmental regulations implemented by the Chilean government,
Jan 1, 2007
-
Strength, Deformation and Thermal Parameters of Rocks Heated to High TemperaturesBy Piotr Malkowski
Studies on the properties of rocks heated to high temperatures are rather rare. Such research is occasionally conducted for example; in areas around nuclear power plants. The national Polish coal gasi
Aug 1, 2013
-
AG Milling with and Without Pebbles Recycle - Effect on Multi-Component Ore Deportment and ThroughputPalabora Mining Company (PMC) processes a multi-component ore body using a circuit consisting of two AG mills in parallel, closed with vibrating double deck screens and hydrocyclones. The bottom scree
Jan 1, 2012
-
The POP Project (Process Optimization Project) Development and Transfer of Modern Optimization & Control Tools and Methods for Mineralurgical and Metallurgical ProcessesBy S. Caron
From the early 70?s, ?Centre de Recherche Minérale? (CRM) has conducted and co-ordinated Research and Development activities for the mineralurgical and metallurgical industries. Since 1999, CRM has co
May 1, 2001
-
Mixing Times and Correlation for Dual Plug Stirred Ladle: Quantifying the Role of an Upper Buoyant PhaseBy D. Satish Kumar, D. Mazumdar
"95% bulk mixing times in three different size water model ladles of a 140 T cylindrical shaped , dual plug ( located diametrically opposite at mid bath radius position) stirred, industrial ladle were
Jan 1, 2004
-
Geochemical Exploration In The Canadian Shield State Of The Art: Closing RemarksBy C. F. Gleeson
"I HAVE BEEN ASSIGNED the pleasant task of adding a last word in way of summary to this session. I think that the trend set in having a geochemical session at the CIM Annual General Meeting is a good
Jan 1, 1971
-
A Novel Framework for Modelling Flotation Column HydrodynamicsBy P. R. Brito-Parada, G. Bhutani
"The physical processes occurring in flotation columns are very complex as they take place at different scales over a range of sizes and multiple phases. Column design and optimum operating parameters
Jan 1, 2016
-
Performance management - an implementation processBy B. L. Dorey
"Performance management is a systematic, practical approach to managing people. It is founded on some basic assumptions about people and is designed to focus on people in the work place. Organizing me
Jan 1, 1989
-
New technology for the abatement of SO2 in nonferrous pyrometallurgical processes by a dry limestone scrubberBy F. Parada, R. Parra
"The neutralization process of SO2 from coal burning plants is a well-defined technology using limestone to form CaSO4 according to the following reaction: CaCO3 + SO2(g) + 1/2O2(g) = CaSO4 This paper
Jan 1, 2007
-
Hydrogen Mitigation In The Mcclean Lake Uranium Leaching Circuit– An UpdateBy W. McCombe, G. Remple, L. Nightingale-Mercer
The McClean Lake Mill is located approximately 850 kilometres north of Saskatoon, Saskatchewan, Canada, and is operated by Orano Canada Inc. (Orano). The mill was designed to process high grade uraniu
Jan 1, 2020
-
A Reservoir Study of the Excelsior PoolBy W. A. Bain
"AbstractProduction from the Excelsior Reservoir has amounted to approximately one million barrels. This production has caused a 'Pressure •drop of 10 p.s.i. from the original pressure of 1,245 p.s.i.
Jan 1, 1952
-
Subsurface Tiltmeter Observations of Solid Earth Tides and Rock Excavation in Northeastern IllinoisBy C. E. Lancelle, J. T. Volk, H. F. Wang, D. Fratta
"The Main Injector Neutrino Oscillation Search (MINOS) Near Detector Hall at Fermilab and the Lafarge – Conco Mine are located approximately 100 meters underground in the Galena-Platteville dolomite j
Jan 1, 2015
-
Stoping at NorandaBy O. Hall
STOPING at Noranda" is a sequel to "Mining at Noranda". "Mining at Noranda", presented in 1937 (1), sketches Noranda's history, metallurgical problems, exploration, mining methods, mining detail
Jan 1, 1939
-
Geophysical Case Study of the Iso and New Insco Deposits, Québec, Canada, Part I: Data Comparison and AnalysisBy D. Bois, P. Keating, J. Lemieux, M. A. Vallée, M. Allard, R. S. Smith, L. Z. Cheng, M. Chouteau, D. K. Fountain
"Abstract -A test survey using the MEGATEMII airborne electromagnetic system was flown over the Iso and New Insco massive sulfide orebodies in the Rouyn-Noranda mining camp, Canada. The results were c
Jan 1, 2006
-
Process Scale-up For Uranium, Mercury And Cesium Recovery From Surrogate Radioactive Cemented WasteBy A. Demers, M. Chapman, N. Reynier, R. Lastra, M. Courchesne, C. Laviolette
Historic medical isotope production at Canadian Nuclear Laboratories (CNL) in Chalk River involved the dissolution of irradiated isotope targets prior to extraction of Mo-99. This process generated li
Jan 1, 2020