    A Method to Downscale Joint Surface Roughness and to Create Replica Series using 3D Printed Molds

    By A. Hartikainen, M. Rinne, F. Johansson, R. Yorke, L K. T. Uotinen, E. Korpi, J. Antikainen

    "In order to determine the in-situ shear strength of rock joints, large scale testing is required. However, this is both expensive and difficult to execute. One possible method to overcome this may be

    Jan 1, 2015

  • CIM
    Flowsheet Development and Integrated Pilot Plant Testing for a Pyrochlore Bearing Carbonatite Ore

    By S. Kelebek, B. Ingram, C. Gibson, T. MacNeil, M. Aghamirian

    "The beneficiation and upgrading of pyrochlore from its ores is carried out through flotation. In industrial practice, upgrading is conducted in a two-stage flotation process in which pyrochlore flota

    Jan 1, 2016

  • CIM
    Efficient Mine Ventilation Systems through Optimal Fan Design and Testing

    By L. Van Wyk, J. Fernandez, J. Suarez, L. J. Diaz, A. Uria, D. Breeuwer

    "Ventilation is an essential component of any underground mine, playing a vital role in ensuring the health and safety of workers, and a mine’s continuous operation. At a time when mining companies ar

    Jan 1, 2019

  • CIM
    A Geometric Scaling Approach to Evaluate Tire-Oil Sand Interactions

    By T. G. Joseph, A. Sharma

    ABSTRACT: Ultra-class haul trucks operating in oil sand face operational and maintenance issues as a result of soft underfoot conditions (Joseph, 2002). With exposure to frequent high g loading events

    Jan 1, 2011

  • CIM
    Sulfate-Based Process Flowsheet Options for Hydrometallurgical Treatment of Copper Sulfide Concentrates

    By J. O. Marsden

    Over the past eight years, Phelps Dodge (a division of Freeport-McMoRan Copper and Gold, Inc.) has developed a suite of proprietary hydrometallurgical processes for the treatment of copper concentrate

    Jan 1, 2007

  • CIM
    Aerial Survey of Open Pits at Lake Asbestos of Quebec

    By Maurice Lauzon

    "Aerial surveys of the open pits have been conducted regularly at Lake Asbestos of Quebec, Ltd. -a subsidiary of American Smelting and Re-fining Company -since 1958. Ground controls are supplied by La

    Jan 1, 1967

  • CIM
    Evaluation of design bond strength for fully grouted cables

    By A. J. Hyett, R. D. Reichert

    "A laboratory and field research program was conducted to investigate the major factors influencing bond capacity of grouted cable bolts. The results indicate that cable bolt capacity most critically

    Jan 1, 1992

  • CIM
    Silicosis in Ontario Mines

    By Clifford S. Gibson

    THE Workmen's Compensation Ace defines Silicosis as "a fibrocic condition of the lungs caused by the inhalation of silica dust sufficient co produce a lessened capacity for work". This fibrocic c

    Jan 1, 1937

  • CIM
    An Inspector Has Just Arrived at Your Facility. Are you Prepared?

    By Michael R. Brown

    A facilities success or failure of doing well during a regulatory inspection is typically measured by the number and type of citations that result, and financial liability resulting from those citatio

    May 1, 2002

  • CIM
    Ground Support at Craigmont

    By A. J. Petrina

    "At Craigmont Mines Limited, Merritt, B.C., tests were begun in March, 1965 to evaluate the use of shotcrete as a method of ground support m development headings; previously, ail drifts had. required

    Jan 1, 1968

  • CIM
    Progress on Stainless Steel as Bipolar Electrode Plate Material for PEM Fuel Cells

    By R Zavadil, S Kuyucak, F Fazeli

    Proton exchange membrane (PEM) fuel cells generate electricity by reacting hydrogen and oxygen. A thin, bipolar electrode material provides a medium for electron exchange with the electrolyte, alterna

    Jan 1, 2014

  • CIM
    Centrifuge model studies of fill pressures on temporary bulkheads

    By R. J. Mitchell

    "The use of hydraulically delivered classified tailings sands to provide ground support in large mining operations is still widespread despite recent developments of alternate backfilling methods and

    Jan 1, 1992

  • CIM
    A Supply System for Western Canadian Thermal Coal

    By E. G. Bazeley

    The paper reviews the scope, timing and financial impact of this significant project, which involves the supply and transportation of nearly 4 million tons per year of bituminous coal and lignite from

    Jan 1, 1978

  • CIM
    The Salt Deposits of Malagash, Nova Scotia

    By A. R. Chambers

    Malagash received its name from the Indians many years ago on acco.unt of its turbid (milky) waters, although,' the red men did not appreciate the significance of this turbidity, and were, of cou

    Jan 1, 1924

  • CIM
    Using Operational Readiness and Plant Trials to Successfully Implement a Process Flowsheet Change

    By C. H. Buck, A. J. Taylor

    "In 2015 Vale’s Clarabelle Mill began the process change to enable a higher degree of Cu separation. The flowsheet modification was part of a complete divisional flowsheet change being implemented in

    Jan 1, 2018

  • CIM
    The Spiral Stoping System as Applied at the Beattie Mine

    By Jay Tuttle

    THE spiral stoping method of mining was first seen by the writer at the Granby Consolidated Mining, Smelting & Power Company's Hidden Creek mine, at Anyox, British Columbia. Where the method re

    Jan 1, 1939

  • CIM
    A Continuous Improvement Model Linking Planning and Operations

    By Paul Clark

    Generation - Profile l 9,726 megawatts (MW) of capacity l 46,877 gigawatt hours (GWh) produced at an average plant availability of 88.4% l 47 facilities in four geographies: Canada; the U.S.; Mexic

    May 1, 2004

  • CIM
    Use of Airborne Resistivity Surveys for Gravel Location

    By R. W. Culley

    "In many areas of Saskatchewan, known gravel deposits have been depleted or are diminishing rapidly; in other areas, particularly in the north, demands for all-weather highways and access roads are fa

    Jan 1, 1973

  • CIM
    Tankhouse modernization at CCR (5da89055-e07e-468a-a039-0ab4f4658423)

    By V. Baboudjian, R. J. Geren, J. Thiriar

    "The electrolytic tankhouse at CCR was recognized by management as lagging behind modem refineries in terms of productivity, energy efficiency and controls. The operation was also burdened by high mai

    Jan 1, 1993

  • CIM
    Rock Drilling with Tungsten Carbide Bits

    By J. H. Fulton

    Summary Considerable test work has been done with the detachable type of carbide bit. In general, these bits improved drilling operations, but at a bit cost .greater than was compensated for by the

    Jan 1, 1950