    Changes to drill pattern and adequate inter-row delay time improve blasting performance (1255a8ec-f486-4f0e-a99f-bee3df1f60e5)

    By P. H. Oliver

    "The current theory of how explosives fracture rock offers no explanation for the improvements in fragmentation and the reduction of fly rock and back break which occurs when an adequate inter-row del

    Jan 1, 2003

  • CIM
    Changes to drill pattern and adequate inter-row delay time improve blasting performance

    By P. H. Oliver

    The current theory of how explosives fracture rock offers no explanation for the improvements in fragmentation and the reduction of fly rock and back break which occurs when an adequate inter-row dela

    May 1, 2003

  • CIM
    Production Methods in the Turner Valley Field

    By S. G. Coultis

    Turner Valley is in the foothills of the Rocky mountains, at an altitude of 4,000 feet, and is 42 miles south west of Calgary. The present producing area is 8 miles long by 1 1/2 miles wide, while dri

    Jan 1, 1929

  • CIM
    Improving Mine/Mill Water Network Design by Reducing Water and Energy Requirements

    By M. Veiga

    "Mining is an energy and water intensive activity. Increasing energy efficiency and reducing water consumption are two of the key requirements in moving toward a more sustainable mining industry. Wate

    Jan 1, 2010

  • CIM
    Jaguar?s Caeté Gold Project in Brazil

    By Ivan C. Machado

    Jaguar Mining Inc. is implementing a 1.1 Mtpy, 7-year LOM gold project in the Iron Quadrangle (?Quadrilátero Ferrífero?), Brazil. Construction is on schedule and startup is programmed for Q2 2010. Mil

    May 1, 2010

  • CIM
    The Highmont Concentrator Startup

    By R. S. Fukuhara, M. J. Allan

    "Highmont, a wholly owned subsidiary of Teck Corporation, operates a 25,000 ton/day mine and concentrator located in the Highland Valley of British Columbia. Construction of the plant commenced in the

    Jan 1, 1982

  • CIM
    Micro-Macro Modelling of True Triaxial Behaviors of a Granite

    By S. S. Yuan, Q. Z. Zhu, J. F. Shao

    "This paper aims at enriching a homogenization-based anisotropic damage model for hard rocks under complex loading. A new damage criterion is proposed to capture material strain softening. Within the

    Jan 1, 2015

  • CIM
    Grinding Circuit Design for Adanac Moly Corp using a Geometallurgical Approach

    By Dave Bulled

    "This paper describes the design of an SABC grinding circuit using CEET technology applied to grindability data produced from testing 100 samples and distributed across the blocks of a mine plan using

    Jan 1, 2007

  • CIM
    Thermal Cycling in the Permanent Mould Process: Effect of Insulation and Electric Heating of the Mould

    By F. Chiesa

    The permanent mould process, which is a favoured process for producing premium quality aluminium casting, is rarely used to produce magnesium alloy parts. This may be attributed different factors such

    Jan 1, 2006

  • CIM
    Dust Collection Methods for Primary and Secondary Crushing (NOVEMBER 21, 1975 )

    By D. Ingram

    "PRIMARY DUST COLLECTOR A. 42,000 CFM James Howden Fan Z-6 Size 3650 Fan Dia 40"" HP 75It was found that the fan was not large enough to remove the air that was displaced by the trucks dumping. So it

    Jan 1, 1976

  • CIM
    Advancing Asset Performance at the Montcalm Operation

    By Juan Anes, Dominic Fragomeni, Tim Edwards, Dave Scott, Simon Yu

    "The Montcalm concentrator operation was successfully commissioned in fall of 2004 at the Xstrata Copper’s Kidd Creek Metallurgical Site, Timmins. The start-up met or exceeded the Type 1 profile as de

    Jan 1, 2009

  • CIM
    Optimization of Acid Consumption for Copper Heap Leaching

    By Anand Raman, Steve Dixon

    "Industry practice for defining acid consumption is based on column tests. Freeport-McMoRan (FCX) has adopted a practice of leach operation using a defined pH or gpl acid in the raffinate based on the

    Jan 1, 2008

  • CIM
    Improved Production Forecasting through Geometallurgical Modeling at Iron Ore Company of Canada

    By Dave Bulled, Jim Thompson, Tim Leriche, Mark Blake, Troy Wilkie

    "A commitment to a core testing, plant modeling and reconciling technique has shown substantial economic benefits to IOC in terms of accurate production forecasting, smoother operation of the mill, im

    Jan 1, 2009

  • CIM
    THE SSW PROBE: A new High-Tech Tool to Raise Ore Grades by Reducing Dilution Within Metal Mines.

    By Pierre Gaucher

    It is possible to selectively mine an orebody by combining the use of the SSW probe with any bulk mining methods as well as narrow vein exploitations. In other words, thanks to the use of the SSW prob

    Oct 1, 2001

  • CIM
    A New ERA Tool for State of the Art Metallurgical Balance Calculations

    By Frédéric Flament, Luc Lachance

    "The important task of metallurgical accounting that used to be done manually is being more and more automated. Currently available solutions can generate accounting reports without human intervention

    Jan 1, 2011

  • CIM
    A Frother Concentration Meter

    By J. A. Finch, T. Weber

    "Bubble size in flotation is strongly influenced by frother concentration in the pulp liquor. There is no accepted method of judging the dosage and thus how effectively frother is being distributed to

    Jan 1, 2003

  • CIM
    Cone Crusher Operaitonal Variables

    By A. J. Magerowski

    Energy consumption is a main component of operational costs for the comminution of mineral bearing ores. Reduction of energy consumption has continually been addressed by mill operators and equipment

    Jan 1, 1986

  • CIM
    Observation of ore pass system performance at Brunswick mine (56ecacd0-ce74-4364-ac15-e3875a5d4671)

    By R. Harrisson, K. Esmaieli

    Brunswick mine employs an ore and waste pass system for material transfer. This paper reviews the evolution and performance of ore pass systems at the mine. It presents the range of selected configura

    Jan 1, 2008

  • CIM
    The Preservation of Timber by Chemical Treatment at McIntyre

    By D. E. Keeley

    lntroduction Some years ago it was general practice in Canadian mines to use the best timber available, just as it was cut from the tree. Later, to prevent 'borers' from getting into the

    Jan 1, 1949

  • CIM
    Airborne Gamma-Ray Spectrometry

    By A. G. Darnley

    "The Geological Survey of Canada is devoting consider-able effort to finding ways to make airborne radiometric measurements both quantitative and reproducible. Equipment has been designed by Atomic En

    Jan 1, 1970