A Transparent and Pragmatic Quantitative Risk Assessment Process for Assessing Fire Safety in New Zealand TunnelsBy T Ireland, B Wright, S Weaver
All tunnels have unique characteristics that result in different fire and life safety risk. The fire safety systems for each tunnel also give different benefits at different costs. It is therefore nei
Sep 17, 2014
-
Recovering Iron and Zinc Values from Steel Plant Dusts with Simultaneous Destruction of Organic Wastes: The EnvIRONment ProcessBy Reilly L, Worner H. K
The EnvIRONment process has been developed to treat steel works dust and organic wastes simultaneously. A pelletised feed is fed into a special DC electric furnace, the pellets becoming immersed in
Jan 1, 1995
-
Redevelopment of the Morning Star Gold Mine - ABSTRACT ONLYMorning Star Gold aims to enter the ranks of Australia's gold producers, revitalising the Eastern Victorian Goldfi elds in the second half of 2010 - the fi rst gold production in around 50 years
Aug 1, 2010
-
Development of the Primary Ventilation System at Mount Isa: IV. Aerodynamic Performance TrialsPerformance trials followed the commissioning of three large mine fans at Mount Isa in 1965. Actual performance characteristics were determined. These were in good agreement with predicted performance
Jan 1, 1967
-
How innovation trumps isolation, one mine at a timeBy J Pearce, R Ramanathan
hortly after the World Health Organization declared COVID-19 a pandemic, the words ‘social distancing’ entered the global lexicon. The effects on the public of social distancing, lockdowns and travel
Jun 22, 2022
-
The Influence of a Pipe Reactor to Improve Pre-Oxidation and Gold Recovery and Lower Cyanide ConsumptionBy G Senanayake, J Andreazza
The general experience in gold cyanidation research activities and plant practice is that high oxygen and cyanide concentrations improve gold leaching kinetics which in turn reduce residence time and
Jan 1, 2002
-
Cape Lambert Port B Shiploading, Sampling and AnalysisBy M Graham, R Brunning, C Andringa-Bate, S Westergren
In 2010, Rio Tinto Iron Ore’s operations commenced the planning and design of a sampling and analysis system for the new 50 Mt/a Cape Lambert Port B (CLB) facility. Current sampling systems at the por
Jul 29, 2014
-
Phosphorus distribution behaviour in hematite ore reduced in CO-H2 gaseous atmosphereBy E K. Chiw, S-M Jung, S M. Masuka, ika
The world reserves of high-grade iron ore have depleted necessitating the need to utilise any existing natural iron ore deposits to meet the demands of the world’s expanding economy using hydrogen in
Sep 18, 2023
-
Technological Innovations to Reduce Operating Cost at Kalgoorlie Nickel SmelterBy Remilton D, Raston GR
The low price of nickel which has prevailed since 1982 has dictated that unit production costs must be minimised. Early in the crisis, a decision was made within Western Mining Corporation to reduce u
Jan 1, 1985
-
Rehabilitation, Landscaping, And TressThe aim of this paper is to examine the problems confronting the planner, designer, constructor and management when rehabilitating the works associated with road building- and including quarry and
Jan 1, 1976
-
Some Practical Aspects of Design and Operation of Water and Ore Addition Points in Grinding CircuitsThe design of water and ore addition points has an important bearing on the ease of operation of a grinding circuit. The nature of some of the design decisions and the possible options of the desi
Jan 1, 1978
-
Mine Stability Evaluation from Microseismic ActivityBy Harris R. W
Any defect activity resulting from an applied stimulus on a structure will generate a stress wave which travels in the medium under the laws of acoustics, thus the name of acoustic emission (AE).
Jan 1, 1992
-
Underground Mine Project DevelopmentThis paper reviews factors involved in the feasibility stage of underground mine project development. Emphasis is placed on the need to first select the best method of extraction and make the most
Jan 1, 1983
-
Miwah Prospect High Sulphidation Au-Cu Mineralisation, Northern Sumatra, Indonesia (4b0407ac-b0c0-4d41-9954-f2633d517077)By Fleming GJ
The Miwah prospect lies on the dilational 070¦ trending Miwah Lineament near its intersection with northerly oriented fractures within Pliocene volcanic rocks exposed between a NW trending segment of
Jan 1, 1995
-
Operation at Blackwater MineThe Blackwater Coal Mine is a modern open cut operation using large draglines for over- :)urden removal and shovels, loaders and trucks to mine and haul coal to the crushing and coal ?reparation pla
Jan 1, 1974
-
Mechanics of Rock Drilling, Cutting and Future DevelopmentsBy Aziz NI, Guo H
Most of the existing models of the mechanisms of drilling and cutting processes are oversimplified in both stress state and failure criterion. On the other hand numerical modelling techniques are a
Jan 1, 1988
-
An Experimental Investigation to Evaluate Gas Flow Characteristics of CoalBy McPherson M. J
An experimental investigation was carried out to determine the various gas flow characteristics of bituminous coal samples. Adsorption and desorption tests were first conducted to estimate the qua
Jan 1, 1988
-
Sidewall Fracturing in Coal Room and Pillar and Pillar Extraction PanelsIn coal room and pillar, and pillar extraction panels, the sidewall conditions were investigated based on underground measurements and numerical simulations. Three-dimensional linear elastic model
Jan 1, 1992
-
Ground Support by Rock Bolting at Mount Isa Mines LimitedRock bolting has become the most important method of ground support at Mount Isa. Various types of rock bolts are used to suit the different applications and requirements. To apply rock bolting tec
Jan 1, 1971
-
A Critical Review of Predictive Methods for Estimation of Compressive Strength of Coal PillarsBy Hossaini SMF
After reviewing the various approach es,namely, empirical,analytical.observational and numerical, a logical systematic approach is proposed for the estimation of compressive strength of coal pillars.
Jan 1, 1991