Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Analysis of the Creep Behaviour of Tunnels in Sandstone/Shale

    By J C. Small

    Time-dependent deformation occurs when geo-materials are under an applied load; this may lead to additional deflection of a tunnel structure and the stress redistribution in the surrounding rock, shot

    Jan 1, 2008

  • AUSIMM
    Characterising the Mining Environment for Underground Mass Mining

    The purposes of defining the mining environment for underground mass mining and the uses of characterisation data are outlined. The requirements for data in the areas of geology, surface and groundwat

    Jan 1, 2000

  • AUSIMM
    Mine Waste Cover System Design ù Linking Predicted Performance to Groundwater and Surface Water Impacts

    By C Wels

    Current best management practice requires the placement of a cover onto most types of mine waste including tailings, waste rock and/or spent heap leach rock at closure of the mine. The objectives of a

    Jan 1, 2003

  • AUSIMM
    The Practice of De-Silverizing Base Bullion at the Port Pirie Works of the Broken Hill Associated Smelters Pty. Ltd.

    THE de-silverizing of base bullion at the Port Pirie works is carried out in accordance with the principles of the well-known Parkes process. The base bullion produced by the blast furnace department

    Jan 1, 1922

  • AUSIMM
    Operation of Large Davcra Flotation Cells in Production and Test Circuits

    Development of the Davcra flotation cell has continued over the past seven years. Preliminary testwork on single cells has now been extended to a com- plete Davcra flotation circuit, to cells ranging

    Jan 1, 1971

  • AUSIMM
    Large Compact Bucket Wheel Excavators

    Most compact bucket wheel excavators in use are in the small to medium range. Large compact bucket wheel excavators compete directly with con- ventional longer boom excavators which have operational

    Jan 1, 1989

  • AUSIMM
    Fragmentation Optimisation – Adopting Mine to Mill for Reducing Costs and Increasing Productivity

    By V M. Silva, P A. A Martins, V O. Matthew, A L. S Fonseca, E B. Cunha, A J. D Ferrari, E M. S Silva, A C. Silva, D R. T Vilela

    The Anglo American phosphate mine is located in the Brazilian state of Goiás and possesses one of Brazil’s most important phosphate rock deposits, with the site being the country’s second largest

    Aug 24, 2015

  • AUSIMM
    Gold Room Procedure at Lake View and Star, Ltd.

    Recovery of gold by smelting zinc dust concentrate has been carried on at Lake View and Star, Ltd., since July, 1930, when the Merrill-Crowe precipitation plant was first put into operation.Part I des

    Jan 1, 1948

  • AUSIMM
    Selective Detachment Process in Column Flotation Froth

    By A V. Ozsever

    The selectivity in flotation columns involving the separation of particles of varying degrees of floatability is based on differential flotation rates in the collection zone, reflux action between the

    Jan 1, 2005

  • AUSIMM
    Estimation of rock brittleness for jointed specimens under cyclic triaxial loading

    By P Khalkho, M Singh

    Rock masses when subjected to uniaxial or triaxial cyclic loading (eg in hydraulic running tunnels, during retrieval and injection of oil and gas from storage underground caverns and haulage roads), t

    Nov 29, 2022

  • AUSIMM
    Coal Mine Drainage Geochemistry, West Coast, South Island û A Preliminary Water Quality Hazard Model

    By D Craw, N Newman

    Previously published stream quality data and AMD (acid mine drainage) analyses have been collated into a database (DAME û Database for Assessment of Mine Environments) and additional samples including

    Jan 1, 2006

  • AUSIMM
    An Investigation of the Impacts of the Blasts in A Mining Process Upon A Concrete Shaft Lining

    By Rozycki J

    The results of shaft lining monitoring gave rise to an investigation of cracks observed in the structure. An hypothesis was made that the cracks might be due to stresses caused by energy wave prop

    Jan 1, 1987

  • AUSIMM
    Visual Computing and Mine Design

    Visual computing opens the design process to a wider audience and allows rapid communication of mine plans to all stakeholders. The integration of software and hardware technologies that take advantag

    Sep 26, 2011

  • AUSIMM
    Derivation of a Backfilling Strategy for Tabular, Deep, Scattered Mining on Vaal Reefs

    By J J. Laas, A J. S Spearing

    Considering the capital outlay, running costs and inherent difficulties of backfilling operations at depth the benefits need to be clearly established, quantified and then exploited. Expansion of Vaal

    Jan 1, 1998

  • AUSIMM
    Derivation of a Backfilling Strategy for Tabular, Deep, Scattered Mining on Vaal Reefs (Minefill '98)

    By Laas JJ, Spearing AJS

    Considering the capital outlay, running costs and inherent difficulties of backfilling operations at depth the benefits need to be clearly established, quantified and then exploited. Expansion of Va

    Jan 1, 1998

  • AUSIMM
    Development of an Empirical Geochemical Model (OkARD) to Predict Acid Rock Drainage Risks From Mine Derived Sediments, Ok Tedi Copper and Gold Mine, Papua New Guinea

    By K Voigt, B Bolton, C Rumble

    The Ok Tedi copper and gold mine is owned and operated by Ok Tedi Mining Limited (OTML) and is located in the Star Mountains of the Western Province of Papua New Guinea. Waste materials (both sulfidic

    Jan 1, 2003

  • AUSIMM
    When Nothing is What You Need – The Importance of Using Blanks at All Stages of Sample Preparation

    By J Webb

    "It is vitally important in projects where the cut-off grade is low that there is no contamination during the sampling and sample preparation process, both in the ore and the waste zones. Failure to i

    Jul 29, 2014

  • AUSIMM
    A Description of the Treatment of the Copper Impurity in the Lead Ores Smelted at the Sulphide Corporation's Works, Cockle Creek

    THE question of dealing with the small quantities of copper found in a great many of the purchased ores became a factor of importance when the Sulphide Corporation decided to refine its own lead bulli

    Jan 1, 1920

  • AUSIMM
    Mount Carlton comminution circuit design, start-up and optimisation

    By B Putland, I Lovatt, D Schwann, A Cervillin

    The Mount Carlton project in Queensland's North East sits on a high-sulphidation epithermal style deposit rich in gold, copper and silver. Mt Carlton is an open pit mining operation with ore proce

    Aug 29, 2018

  • AUSIMM
    Stochastic Production Scheduling – Solution through Langrangian Relaxation with the Branch-and-cut Algorithm

    By S Chatterjee

    The production scheduling of an open pit mine determines the optimal extraction sequencing that significantly impacts a mine’s life as well as net present value. The optimisation of production schedul

    Nov 24, 2014