Search Documents

  • AIME
    Development Of The Disco Process Of Low Temperature Carbonization

    By C. E. Lesher

    THE Disco* process for the production of low temperature coke and its immediate predecessor, the Wisner or Carbocite process have been described in the voluminous literature of low temperature carboni

    Jan 1, 1952

  • NIOSH
    OFR-102-84 A Feasibility Study For The Detection Of Weak Electromagnetic Signal/Bursts With Hard-Limited Arrays

    By M. Kanefsky

    Two channel polarity coincidence and polarity difference statistics are analyzed. The signal, common to both channels, consists of sinusoidal bursts where the exact frequency of the signal is nearly k

    Jan 1, 1981

  • SME
    Old Mines ? New Regulations: The re-opening of the Gordonsville, Elmwood, and Cumberland Mines under new DPM regulations

    By A. Adu-Acheampong

    The Mid-Tennessee Zinc (MTZ) mines, comprised of the Gordonsville, Elmwood, and Cumberland sites, last operated 4 years ago and are undergoing rehabilitation to begin production in 2008. The mines uti

    Jan 1, 2009

  • AUSIMM
    Mining at the Redross and Mariners Nickel Mines

    By D Will

    RedrossThe Redross orebody averages 1 m wide, has a strike of 50 - 350 m, dips at 55° and has a basalt footwall and an ultramafic hanging wall. The most successful and innovative aspects of mining Red

    Mar 21, 2011

  • AIME
    Papers - Some Things We Don't Know about the Creep of Metals (T. P. 1087)

    By H. W. Gillett

    Unlike most previous Howe lecturers, I had not the good fortune to be associated with Henry Marion Howe, nor to be directly one of his students. Yet, through his writings, he has been my teacher, as h

    Jan 1, 1939

  • ABM
    New Danjoint High Performance Oil Lubricated Gear Spindles For Essar Steel Algoma’s

    By Andrea Codutti, Gianni Tiussi, Andrea Tonnicchi, Morris Codarin

    Essar Algoma Steel, Canada, awarded Danieli Transimissions a strategic order for the upgrade of the main drive spindles belonging to the most loaded stands of the Hot Strip Mill, F1-F2, F5 and F6. Fea

    Oct 1, 2019

  • AIME
    Coal - Surface Subsidence Associated with Longwall Mining

    By W. C. McClain

    The amount of vertical subsidence occurring over a longwall operation is a function of the thickness of material removed, the quantity and quality of any fill material, the width of the extraction, an

    Jan 1, 1967

  • CIM
    A scoping study method for determining the viability of block caving a hard rock orebody

    "A method is described for determining the viability of hard rock orebody extraction by block caving. Using a very limited amount of geotechnical data, the procedure enhances Laubscher’s empirical sta

    Jan 1, 2002

  • AIME
    Employment (2c6f1810-2ca2-4009-ba1a-7cc82bab03cd)

    (Under this heading will be published notes sent to the Secretary of the Institute by members or other persons introduced by members) Member, Graduate Colorado School of Mines. Four years' exper

    Jan 3, 1917

  • SME
    The Slurry Transport Of Industrial Minerals

    By James M. Link

    The transportation of solids by slurry pipeline is a rapidly growing field. Although early patents date from the latter part of the nineteenth century, it has only been within the last twenty years th

    Jan 1, 1972

  • AIME
    Coal - Development of the Disco Process of Low Temperature Carbonization

    By C. E. Lesher

    THE Disco* process for the production of low temperature coke and its immediate predecessor, the Wisner or Carbocite process have been described in the voluminous literature of low temperature carboni

    Jan 1, 1953

  • AIME
    Coal - Development of the Disco Process of Low Temperature Carbonization

    By C. E. Lesher

    THE Disco* process for the production of low temperature coke and its immediate predecessor, the Wisner or Carbocite process have been described in the voluminous literature of low temperature carboni

    Jan 1, 1953

  • CIM
    Experiences with Real Time Equipment Monitoring ? Using Advanced Analytics to Equipment Life and Reduce Costs

    Mining Equipment Challenges Equipment Availability Unplanned downtime Maintenance Costs Secondary damage and catastrophic failures (T282 $750k) Emergency work is 4x the cost of planned work Ins

    May 1, 2013

  • ISEE
    Journal: 21st Annual Photo Contest - Honorable Mention, "Demolition Blasting 1,000 Milliseconds in the Demolition of a Cyclone Tower"

    By Walter Voglauer, Elisabeth Zechmeister

    Five serial photos show the first second of the demolition of a 75 m high, reinforced concrete tower in the 23rd District of Vienna, Austria. The tower demolition with high explosives was necessary be

    Jan 1, 2015

  • NIOSH
    RI 8248 Dust Control on a Longwall Face With a Shearer-Mounted Dust Collector

    By Natesa I. Jayaraman

    A field study was conducted by the Bureau of Mines to determine the feasibility and effectiveness of a secondary ventilation system retrofitted onto an Eickhoff EDW 340L double-drum shearer as a techn

    Jan 1, 1977

  • AIME
    Institute of Metals Division - A Simple Device to Improve Uniaxial Loading in Compression Tests (TN)

    By Wilhelm in der Schmitten

    A necessary condition for a uniaxial stress distribution in compression testing is that the specimen end surfaces make full contact with the apparatus compression plates. In addition all compression

    Jan 1, 1962

  • SME-ICGCM
    Applications Of Reflection Seismics To Mapping Coal Seam Structure And Discontinuities

    By T. L. Dobecki

    As a means of demonstrating the effectiveness of reflection seismology in determining continuity of coal seams, three U. S. field projects are reviewed. The three projects involve coals of varied thic

    Jan 1, 1981

  • CIM
    Automatic Controls of Alkalinity in Regrind Circuit at Delnite Mines, Ltd.

    "The ore currently being milled at Delnite is a high pyrrhotite ore with the gold intimately associated with the pyrrhotite. To get maximum recovery of the gold with the lowest reagent cost, it is nec

    Jan 1, 1964

  • AUSIMM
    The Century Discovery, Queensland, Australia - Is Exploration Ever Complete?

    The Century zinc-lead-silver deposit has a geological resource of 118 million tonnes averaging 10.2% zinc, 1.5% lead and 36 g/t silver. It lies approximately 250 krn NNW of Mt Isa in NW Queensland, Au

    Jan 1, 1995

  • SME
    An Investigation Into The Hydrological Behaviour Of Exposed And Covered Waste Rock Dumps

    By Bruno Bussière, Guosheng Zhan, Michel Aubertin, Vincent Martin, Robert P. Chapuis

    The study evaluates the hydrological behaviour of exposed and covered waste rock dumps. The objectives were to determine the major factors influencing unsaturated flow in waste rock dumps and covers,

    Jan 1, 2005