    Archean Gold-Silver And Copper-Gold Deposits In The Yilgarn Block, Western Australia: Greenstone-Hosted And Shear-Zone-Controlled Skarns

    By Andreas G. Mueller

    Gold-silver and copper-gold deposits with high-temperature wallrock alteration of Ca-Mg-Fe-Al silicates occur in ca. 3.0 Ga old greenstone belts of the Yilgarn Block, Western Australia. The deposits a

    Jan 1, 1990

  • SAIMM
    Potential For Bioleaching Copper Sulphide Rougher Concentrates Of Nchanga Mine, Chingola, Zambia ? Synopsis

    By J. Manchisi

    Laboratory investigations were conducted to establish the feasibility of bioleaching a mixed copper oxide/sulphide rougher concentrate from Nchanga Mine on the Zambian Copperbelt. The objective was to

    Jan 1, 2012

  • SME
    Olympic history to be made with medals provided by Teck Resources

    Canadian mining giant Teck Resources Ltd. will be the exclusive supplier of the metals used in the production of the more than 1,000 medals to be awarded at the Vancouver 2010 Olympic and Paralympic W

    Jan 1, 2010

  • AIME
    Affiliated Student Societies (1918)

    LEHIGH UNIVERSITY On April 25, the Mining and Geological Society of Lehigh University held a meeting and elected. the following officers for the college year 1918-1919: C. S. SCHUBERT, President, C

    Jan 7, 1918

  • CIM
    Nanoparticle Flotation Aids for Pentlandite Fines

    By Manqiu Xu, Songtao Yang, Zongfu Dai, Robert Pelton, Carla Abarca

    "Fine mineral particles are difficult to process by flotation because of their low collision efficiencies with air bubbles. Decreasing air bubble size and increasing mineral particle size through floc

    Jan 1, 2015

  • CIM
    Virtual Modeling in Tube Hydroforming Process of Complex Aluminium Parts

    By Mihaita Matei

    An adaptive approach to control the deformation in tube hydroforming process is presented. This requires: the use of an existing non-linear FE software (ABAQUS) that incorporates a user material model

    Jan 1, 2011

  • SME
    High Throughput, High Solids Flotation Of 20 X 200 Mesh North Carolina Phosphate In A Short Column Cell (e8f0823f-317a-4179-8746-73c484ba7427)

    By J. F. Hutwelker

    A pilot plant was constructed and operated to investigate the column flotation of 20 x 200 mesh North Carolina phosphate ore, using high throughput, high solids operating conditions developed at the N

    Jan 1, 1993

  • AIME
    Stope in Malagash Salt Mine, Nova Scotia

    By AIME AIME

    THE two illustrations below, furnished through the courtesy of J. P. Messervey, Deputy Inspector of Mines, Department of Public Works and Mines, Province of Nova Scotia, show a fourth-level stope in t

    Jan 1, 1932

  • NIOSH
    IC 6587 Milling Methods And Costs At The Morning Concentrator Of The Federal Mining And Smelting Co., Mullan, Idaho ? Introduction

    By M. P. Dalton

    This paper which describes the milling practice at the Morning concentrator of the Federal Mining and Smelting Co., Mullan, Idaho, is one of a series being prepared by the Bureau of Mines. ACKNOWLE

    Jan 1, 1932

  • NIOSH
    IC 8048 Bibliography Of Zirconium: Supplement To Information Circulars 7771 And 7830 ? Introduction

    By Eleanor Abshire

    THIS PUBLICATION is the third to be prepared as a result of a cooperative project by the Bureau of Ships and the Bureau of Mines for accumulating literature published on zirconium and hafnium. The und

    Jan 1, 1962

  • IOM3
    Probabilistic risk analysis of slope stability

    By A. P. Whittlestone, J. D. Johnson, R. J. Pine, M. E. Rogers

    standpoint. The effect on efficiency of collisions

    Apr 1, 1995

  • SME
    Seismic Design Of Underground Structures

    By A. J. Hendron, J. E. Monsees

    INTRODUCTION This paper is the outgrowth of work done by the authors to prepare the seismic design criteria for underground structures on the Southern California Rapid Transit District (SCRTD) Metr

    Jan 1, 1985

  • NIOSH
    IC 6467 Milling Methods And Costs At The Concentrator Of The Old Dominion Co., Globe, Ariz. ? Introduction

    By D. L. Forrester

    This paper, describing the milling practice of the Old Dominion Co., is one of a series being prepared by the: United Staten Bureau of Mines. ACKNOWLEDGMENT In the preparation f this paper, ackn

    Jan 1, 1931

  • SME
    A Life-Cycle Approach to Coal Resource Analysis: Examples From the Appalachian and Illinois Basins – Preprint 97-25

    By R. C. Milici

    Historical production data and reserve decline rates can be used both to predict future coal production rates and to estimate when the reserve will be depleted. Reserve estimates inferred herein from

    Feb 24, 1997

  • AIME
    Further Discussion on Pressure Drawdown and Buildup in the Presence of Radial Discontinuities

    By H. K. VAN POOLLEEN, W. Hurst, H. C. Bixel

    In an earlier publication* I showed the development of the instantaneous point source solution for a well producing at a constant rate at the center of a system of two radial, adjoining sands of diffe

    Jan 1, 1969

  • DFI
    Vibratory Driver/Extractors Do More Than Drive Sheet Piles - Summary

    By John L. White

    Vibratory driver/extractors do more than drive and extract sheet piles. I would say more than sixty percent (60%) of the time, vibratory pile driver/extractors are engaged in work that has nothing to

    Jan 1, 1997

  • SME
    Coping with Boulders in Soft Ground TBM Tunneling

    By Peter B. Dowden, Robert A. Robinson

    Boulders, frequently found in tunnels excavated through soils, can pose major problems for full face TBMs in terms of slowing or halting the tunnel advance, cutter damage, and abrasive wear. The paper

    Jan 1, 2001

  • AUSIMM
    Technical Note-A problem with ventilation network analysis

    This technical note describes a problem with WANG82, a ventilation network analysis programme. The problem was highlighted by Renison Ltd when using the programme on large, complex networks. Under cer

    Jan 1, 1986

  • DFI
    Business Benefits Of An Integrated CFA Rig Instrumentation System

    By Jason N. Scott

    CFA piling is a ?blind? construction process that relies heavily on the rig instrumentation to produce sound piles. If the data measured and recorded during construction can be made available to engi

    Jan 1, 2006

  • AUSIMM
    The Influence of Impurities on the Properties of Lead Part II

    This paper forms the second of a series, in which it is proposed to communicate the results of an extensive research into the influence of alloying elements on the physical properties of lead, now bei

    Jan 1, 1934