Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Geophysics For The Detection Of Abandoned Mine WorkingsBy Christopher Phillips
In light of recent events in the mining industry, there has been an increasing demand for technology to detect underground voids and abandoned mine workings. This paper summarizes the use of geophysic
Jan 1, 2003
-
Effects of Panel Mining Sequence and Retreat Direction on the Roof Stability of Longwall Headgate EntriesBy Jinsheng Chen
The major functions of longwall headgate entries are to provide access ways to the outby submains or mains for coal transportation and to the longwall face for fresh air and for transporting men and m
Jan 1, 1998
-
Stone Mine Design in Highly Fractured Rock (af82e9d2-530a-42f2-9d22-f8c466af0da2)By Vincent Scovazzo
Cost-effective underground mine configurations have been designed in highly fractured rock masses where the stone possesses a high material strength. A limestone mine in the eastern United States is u
Jan 1, 2002
-
Stability Evaluation Of Alternative Designs Of Drift-And-Fill Stoping In Zhaoyuan Gold Mine, P. R. ChinaBy Xianming Zhou
Mining economics is such that too conservative in safety will result in a considerable penalty in mining cost. However, initial planning and design of a mining project often must be done without compl
Jan 1, 1989
-
Mobile Roof Support For Retreat MiningBy H. Gene Wilson
Mobile Roof Supports (MRS) look similar to a longwall shield on crawler tracks. The MRS units offer a safe, productive method of extracting the 40% to 60% product left normally unrecovered in room and
Jan 1, 1990
-
Comparison of Acoustic Emission and Stress Measurement Results to Evaluate the Application of the Kaiser Effect for Stress Determination in Underground MinesBy Lorraine Kent
Comparison of in-situ stress overcore measurement results with those determined from laboratory evaluation of Acoustic Emission (AE) testing on oriented sub-core samples has been carried out for a var
Jan 1, 2002
-
Load Transfer Mechanics In Fully-Grouted Roof BoltsBy Maynard O. Serbousek
The mechanics of load transfer of fully-grouted roof bolts in coal mines has been investigated in laboratory and analytical studies. The purpose of this research is to increase the understanding and b
Jan 1, 1984
-
Tailgate Support Evaluation at Plateau Mining CompanyBy H. N. Maleki
This paper presents a field evaluation of six tailgate secondary support systems, with the objective of optimizing support efficiency for maintaining open gate roads. Support systems consisted of a co
Jan 1, 1986
-
Intersection Stability and Tensioned BoltingBy Yunqing Zhang
Roof failure occurs much more frequently at intersections than entries and crosscuts. Using a commercial finite element package, four-way and three-way intersections reinforced with the tensioned bolt
Jan 1, 2003
-
Pillarless Longwall Mining For Multiple SeamsBy Victor V. Nazimko
Longwall mining technology without interpanel pillars is feasible from a geomechanical point of view. A set of pillarless longwall layouts are proposed including tailentry pillar recovery, headentry p
Jan 1, 1994
-
Vertical Stress Redistribution Around A Retreating Longwall Face EndBy D. A. Payne
Large excavations, such as Iongwall panels, result in extensive vertical stress redistribution in the surrounding strata. The large abutment stresses developed may produce damage to pre-existing or pl
Jan 1, 1995
-
Design Of The Ventilation Shaft In The South Link Railway Tunnel Construction, TaiwanBy Jay Keng
During the construction of shaft on the fractured and weak rock strata, the stability of construction plays an important role. This study includes earth stress estimation, support method, and stabi
Jan 1, 1988
-
Case Study of Conditions Observed During the Removal of a Highly Fractured Roof Beam in Bedded HaliteBy Liane J. Terrill
A 9O) ft (275 meter) section of a highly fractured beam of halite was mined from the roof of a supported thirteen year old drift at the Waste Isolation Pilot Plant (WIPP). The operation was conducted
Jan 1, 1997
-
Identification Of Critical Slope Failure Surfaces With Critical Tension CracksThe formation of tension cracks in slopes is well known. Analytical studies require the determination of a critical slip surface for any slope and, in doing so, it is necessary to consider an appropri
Jan 1, 1989
-
Optimun Mining Plan for Multiple Seam MiningBy Wen H. Su
Multiple seam mining and its associated problems are very serious in Southern West Virginia where poor planning or lack of knowledge in seam interaction often results in complete loss of coal propert
Jan 1, 1984
-
Modelling Of Pillar Stability In Room And Pillar MinesBy Douglas Morrison
By applying modern 3D numerical modelling techniques to the analysis of a pillar cascade failure in a room and pillar mine, it has been possible to simulate the collapse and develop an understanding o
Jan 1, 2003
-
Practical Rock Mechanics For Safety And Productivity ImprovementsBy M. Guana
Island Creek Corporation is predominately an underground mine operator deploying room-and-pillar and retreat longwall mining methods for extracting coal. Wide variations are encountered in overburden
Jan 1, 1988
-
Application of Yieldable and Cuttable Pump Crib in Longwall Recovery RoomBy Quanzhong Gu
Stability of a pre-exnacted recovery room plays a vital role when longwall face approaches and during a longwall face move. In an attempt to extend the application of pumpable cribs into recovery room
Jan 1, 2004
-
Determination And IT-Supported Evaluation Of Rock Mechanical Parameters And Their Utilization During Application Of Roof Bolting TechniquesBy Nikolaos Polysos
For the planning and driving of gateroads supported by roof bolts a practical concept has been developed in order to determine the geological and rock mechanical parameters derived from exploration dr
Jan 1, 2001
-
Application of geotechnical and geophysical parameters to improve planning reliability in roadway drivageBy Nikolaos Polysos
To drive and utilise gate roads economically requires accurate planning and risk assessment considering the variable geomechanical requirements. The geomechanical part of roadway planning is secure
Jan 1, 2002