Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Staubbekampfung An Schildausbau In Bruchbaustreben (Combating Dust On Shield Supports On Longwall Mining)

    By Wilfried Ufer

    [1. Einführung in die Problematik 1.1 Die Bedeutung des Schildausbaus Seit fast 30 Jahren ist die Konkurrenzsituation auf dem Primärenergiemarkt der Bundesrepublik Deutschland durch einen von Erdöl

    Jan 1, 1984

  • SME-ICGCM
    The Contributions of the Alpha Foundation to Ground Control Research and Development

    By Tom Barczak, Julian Restrepo, Zach Agioutantis

    "The Alpha Foundation for the Improvement of Mine Safety and Health, Inc. (Foundation) was established as part of a Non-Prosecution Agreement (Agreement) entered in December 2011 by the United States

    Jan 1, 2016

  • SME-ICGCM
    How Interface Friction and W/H Ratio Affect the Mode of Failure of Coal Specimens

    By Syd Peng, Gamal Rashed

    "Bumps in coal mines have been recognized as a major hazard for many years. These sudden violent failures around mine openings have compromised safety, ventilation and access to mine workings. Previou

    Jan 1, 2015

  • SME-ICGCM
    Study on Appropriate Support System and Control Criteria for Main Roadway under Weak Geological Conditions in Indonesia

    By Takashi Sasaoka, Hiroshi Takamoto, Akihiro Hamanaka, Pongpanya Phnthoudeth, Hideki Shimada, Jiro Oya

    "Indonesia is the second largest coal exporter to Japan, accounting for about 30 Mt annually. They produced over 400 Mt in 2015, over 99% of which is from open-cut mines. However, the conditions of su

    Jan 1, 2017

  • SME-ICGCM
    On Research Needs in Coal Mine Ground Control

    By Syd Peng

    "As the International Conference on Ground Control in Mining (ICGCM) enters its 35th year in 2015, it is time to look back and identify the areas that need to be emphasized and to look forward to see

    Jan 1, 2015

  • SME-ICGCM
    A New Generation of Web-Based Applications for Mine Design

    By Nathaniel Schaefer, Christopher Newman, Zach Agioutantis

    "As mining reserves continue to be developed in deeper and more complex geological and geometric conditions, there has been an increased demand for underground mine designs to better reflect site-spec

    Jan 1, 2017

  • SME-ICGCM
    The Potential of Using Coal Washing Plant Waste As a Backfill in Room and Pillar Mines

    By Anthony (Sam) J. S. Spearing

    Backfilling using coal waste is not a novel means for waste disposal throughout the world; yet, backfilling using a high density (paste) backfill is relatively new, except in Germany and Poland. One o

    Jan 1, 2013

  • SME-ICGCM
    A Pipeliner's Perspective on Longwall Mining

    By Robert B. Francini

    Longwall mining and pipelines have coexisted since longwall mining was introduced into the United States. How the pipeline operator reacts to longwall mining under their line depends on many factors.

    Jan 1, 2011

  • SME-ICGCM
    An Approach to Predict Rock Mass Deformations in Three Dimensions for a Part of an Open Pit Mine and Comparison with Field Deformation Monitoring Data

    By Pinnaduwa H. S. W. Kulatilake, Biao Shu

    The intact rock properties and discontinuity properties for both Devonian Rodeo Creek (DRC) and Devonian Papovich (DP) rock formations that exist in the selected open-pit mine were determined from tes

    Jan 1, 2015

  • SME-ICGCM
    How To Cope With Cutter Roof Problem (e6639bdb-2d11-4a70-a3df-8a3a479f7b3e)

    By A. Wahab Khair

    This paper presents results of the experiments carried out in Beth Energy No. 33 Mine for the purpose of alleviating problems associated with cutter roof. Cutter roof problems have delayed the advance

    Jan 1, 1992

  • SME-ICGCM
    A Holistic Examination of the Geotechnical Design of Longwall Shields and Associated Mining Risks

    By Russell C. Frith

    This paper examines the design of longwall shields, focusing on those aspects that are critical to either their successful application or contribution to failure during longwall extraction. In many i

    Jan 1, 2013

  • SME-ICGCM
    Letter Of Nomination - 26th International Conference on Ground Control in Mining

    By Christopher Mark

    Dr. Christopher Mark serves as Team Leader of the Rock Mechanics Section in the Rock Safety Engineering Branch of the NIOSH - Pittsburgh Research Laboratory. In this position he leads a multi-discipl

    Jan 1, 2007

  • SME-ICGCM
    The Science of Empirical Design in Mining Rock Mechanics

    By Christopher Mark

    "Many problems in rock mechanics are limited by our imperfect knowledge of the material properties and failure mechanics of rock masses. Mining problems are somewhat unique, however, in that plenty of

    Jan 1, 2015

  • SME-ICGCM
    The Response Of A High Order Stream To Shallow Cover Longwall Mining In The Northern Appalachian Coalfield

    By John A. Owsiany

    The effect of longwall mining on streams and shallow aquifers has been the subject of numerous research studies for more than twenty years. As a result of these studies, it has become common to consid

    Jan 1, 2001

  • SME-ICGCM
    Transitional Geology and Its Effects on Development and Longwall Mining in Pittsburgh Seam

    By Jun Lu, Mark Van Dyke, Daniel W. H. Su, Greg Hasenfus

    "This paper presents the geologic and ground control challenges that were encountered by CONSOL Energy’s mining operations in southwestern Pennsylvania. A sandstone-to-limestone geology transition was

    Jan 1, 2015

  • SME-ICGCM
    Design Methods To Control Violent Pillar Failures In Room-And-Pillar Mines (V. S. Bureau of Mines)

    By R. Karl Zipf

    The sudden, violent collapse of large areas of room-and-pillar mines poses a special hazard to miners and mine operators. This type of failure, termed a "Cascading Pillar Failure" (CPF), occurs when o

    Jan 1, 1996

  • SME-ICGCM
    Ultra-Thick High-Production And High-Efficiency Longwall Mining Technique With Retreat Mining Along The Seam Dip Direction And Under Complicated Geological Conditions (6f1eec60-4383-4b46-a3c6-b20670410c29)

    By Ke Yang

    In Chinese coal mines, extraction of deep, highly gassy soft coal seams sandwiched between soft floor and soft roof in complicated geology is commonly encountered. How to safely and efficiently excava

    Jan 1, 2009

  • SME-ICGCM
    A Sonic Wave Attenuation Technique For Monitoring Of Stress Levels

    By Po-Ming Lin

    Stress has a significant effect on the stability of pillars. In order to get an accurate picture of pillar stability, one needs information not only on the primary Stress distribution but also on all

    Jan 1, 1984

  • SME-ICGCM
    The In-Situ Pillar Strength and Overburden Stability in U.S. Mines

    By Hamid Maleki

    Prudent design of coal pillars in any mining system requires an estimation of in-situ pillar strength, overburden lateral load transfer capability, and a failure criterion. Pillar strength is typicall

    Jan 1, 2008

  • SME-ICGCM
    Letter Of Nomination

    By Dr. Daniel W. H. Su

    t is both an honor and privilege for me to nominate Dr. Daniel W. H. Su for the inaugural Syd S. Peng Ground Control in Mining Award. I can think of no better candidate than Daniel that is deserving

    Jan 1, 2006