Low-Rank Coal Ash Characterization- Washability And Utilization Implications – Preprint 97-132By P. D. Rao, D. E. Walsh
Chemical and physical properties of typical low-rank coal (LRC) ash are significantly different than bituminous coal ash. With the exception of extraneous ash, which is incorporated during mining or i
Feb 24, 1997
-
Design And Construction Of Wyoming's First Major Sediment Control Reservoir Using Settleable Solids Effluent CriteriaBy P. Kim Carroll, D. Nick Tiffany, Doyl M. Fritz
Thunder Basin Coal Company received the 1987 Wyoming Excellence in Surface Mining Award for construction of the State's first major sediment control reservoir to be designed using the new settlea
Jan 1, 1989
-
Pre-Failure Pillar YieldingBy J. F. T. Agapito, R. R. Goodrich
Yield pillars have been used for many years to help reduce stresses near mine openings and improve roof and floor stability. A yield pillar is often defined as a pillar that fails but retains residual
Jan 1, 2001
-
The Zinc Corporation, Ltd. and New Broken Hill Consolidated, Ltd.By R. E. Le Messurier
GENERAL DESCRIPTION The mines are located at Broken Hill in the western part of New South Wales, Australia, 930 km west¬northwest of Sydney. Mining Methods Where pillars must be left between stop
Jan 1, 1982
-
Machine Utilization Time Of NATM Method In Metro Tunnels: The Case Of Kadikoy-Kartal Metro Tunnels (Istanbul) ? IntroductionBy I. Ocak
Initial investment for mechanical boring of tunnels is found to be high in most cases. Conventional drilling and blasting is not the possible especially in urban area. In these conditions impact hamme
Jan 1, 2011
-
Ground Freezing for Boston Central Artery Contract Section C09A4, Jacking of Tunnel BoxesBy Paul C. Schmall, John F. Donohoe, Arthur B. Corwin, Derek Maishman
Ground freezing was utilized to provide complete stability of the excavation face and complete groundwater cut-off for the jacking of the three tunnel boxes for the Interstate 90 / Interstate 93 appro
Jan 1, 2001
-
Sustainable change of coal-mining regions (ME Technical-Paper Abstracts)By Jürgen Kretschmann
Principally, mining natural resources is a finite business that reaches its limits once the deposits mined are depleted, the resources can no longer be mined in an economically profitable way or subst
-
In-Mine Evaluation Of Smart Mine Fire Sensor (e0413569-6dc4-41a0-bd26-5c60fdfe0934)By R. A. Franks
An evaluation of a nuisance-emissions-discriminating smart mine fire sensor system was made in an operating coal mine. These field evaluations were conducted to determine the sensor system?s ability
Jan 1, 2008
-
Economy Version Of Small Diameter Rock BoringBy Daniel Connor, O&apos
The Cal-Sag Relief Sewer is a 2.6 m (8 ft 6 in.) diameter 9.1 km (5.7 mile) rock tunnel bored in dolomite for the Metropolitan Sanitary District of Greater Chicago. Included in the project are 18 shaf
Jan 1, 1985
-
Tectonic Environment And Petrogenesis Of Gold-Bearing Volcanics Of Hutti Greenstone Belt, Dharwar Craton, IndiaBy M. S. Riyaz Ulla
The Hutti Greenstone belt, located in the northern side of Dharwar Craton, India, contains several promising gold fields. It is predominantly composed of meta-volcanics with minor intercalations of me
Jan 1, 1993
-
Mine Truck ServicingBy T. W. White
One of the objectives of today's mine superintendent is to increase his equipment availability. To this end we have seen improved scheduling procedures, preventive maintenance programs and extens
Jan 1, 1972
-
Carson Hill - Discovery and Development of the Carson Hill Mine, Calaveras County, California, by Grandview Resources, Inc.By J. J. Crowhurst
The Carson Hill mine in Calaveras County, California, was explored and developed by Grandview Resources Inc., as an open-pit heap-leached operation, with production commencing in the fall of 1986. Gra
Jan 1, 1990
-
Negative Industry Viewpoint Of CanadaBy R. E. Anderson
Canada encompasses an area of approximately 9,976,000 kilometres. It is comparable in size to the United States, but because of climatic conditions and limited transportation facilities, much of the a
Jan 1, 1976
-
Exploratory Shaft Design For The Salt Repository ProjectBy S. A. G. Poppen, M. B. Mirza, A. I. Cooley
The U.S. Department of Energy (DOE) is responsible for siting and constructing a licensed geologic repository for commercially generated high-level nuclear waste. Within DOE, the Office of Civilian Ra
Jan 1, 1987
-
Geotechnical And Structural Design Challenges Of The Fremont Central PARK Subway For The Bart WARM Springs ExtensionBy Mitchell L. Fong
The Bay Area Rapid Transit (BART) District will be extending BART service south along an 8.7-km (5.4-mile) -long corridor in the city of Fremont, California as part of the Warm Springs Extension (WSX)
-
Feasibility Study on the Modification and Improvement of Flotation Circuits at Enrichment Plant 2 of the Sarcheshmeh Copper Complex Mining, Metallurgy and Exploration (5b85b197-36d7-44cc-879d-d3b823248b9d)By Bijan Taheri, Behrouz Maghsodi, Monireh Heshami, Reza Kohan
A common problem recently encountered with the increase in the rate of input feed at Enrichment Plant 2 of the Sarcheshmeh Copper Complex is the loss of value to the tails, translating to lower recove
-
Rehabilitation of Tunnels: An Owner’s PerspectiveBy Teena Redhorse, David Tsztoo, Anthony Yu
"Since ancient times, storing and conveying water via underground water systems and tunnels has been touted for its strategic advantages. Underground cisterns and tunnels assured protection of essenti
Jan 6, 2018
-
A Review Of The Analysis Of Amphibole FibersBy K. A. Allison, D. R. Van Orden, R. J. Lee
Continuing analysis of environmental samples for asbestos content has resulted in the misidentification of non-asbestos amphibole particles as asbestos fibers. These errors have received wide publici
Jan 1, 2005
-
Jackleg drill injuriesBy C. C. Clark, D. J. Benton, J. B. Seymour, L. A. Martin
"The U.S. National Institute for Occupational Safety and Health (NIOSH) is conducting research on jackleg use and related accidents in underground metal mines. This paper provides an analysis and over
Aug 1, 2016
-
Procurement, Program Management, Risk, and Financing of Underground Projects: Changing the ParadigmBy William W. Edgerton, Moussa Wone, David H. Corkum, Carlton M. Ray
"The DC Clean Rivers (DCCR) Project is a 25 year, $2.6 Billion court ordered project to reduce combined sewer overflows (CSOs) discharging into the Potomac and Anacostia Rivers and Rock Creek, and als
Jan 1, 2016