Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Exploratory Shafts For The Nuclear Waste Repository In BasaltBy Birger Schmidt
INTRODUCTION Conceptual design of the first Exploratory Shaft (ES-I) for the Nuclear Waste Repository in Basalt (NWRB) began in July 1981; detailed design began in February 1982, and was largely co
Jan 1, 1987
-
Northern Dynasty Mines’ Pebble Project: A Strategic Resource For AlaskaBy Stephen Hodgson, Ken Brouwer
September 2005, Northern Dynasty Mines announced the discovery of a new, high-grade deposit at its Pebble project in southwest Alaska. The product of insightful geological investigation, Pebble East,
Jan 1, 2007
-
Improving Empire?s Grinding Circuit Performance Using Six Sigma - Preprint 09-059By H. Walqui
The Empire concentrator was built in four stages, with the latest stage accounting for 50% of the overall plant capacity. Over the past 5 years, the average throughput of the three grinding lines has
Jan 1, 2009
-
The Effect Of Media Type On Regrinding With Stirred MillsBy Augustine O. Orumwense
Ball mills are commonly used for regrinding operations in the mineral processing industry. But, in recent times, efforts are being made at the introduction of stirred mills particularly for those inst
Jan 1, 2005
-
Development of Environmental Indicators for the Raw Materials IndustryBy S. Möllerherm, E. Drüppel
"The development of indicators to assess the sustainability of mineral raw materials operations is amajor task with respect to its actuality and difficulty. This holds true even more when dealing with
Jan 1, 2005
-
Selenium And Arsenic Removal From Mining WastewatersBy Phil Pennington, D. Jack Adams
Mining and processing of minerals, metals, and fossil fuels can release selenium and arsenic into wastewaters. Both selenium and arsenic are difficult to remove to levels that meet current drinking w
Jan 1, 2005
-
Enhancement Of Bacterial Iron And Sulfate Respiration For In-Situ Bioremediation Of Acid Mine Drainage Sites: A Case StudyBy James M. Harrington, A. Azra Bilgin, JoAnn Silverstein
The prevention of AMD in situ is more attractive compared to subsequent downgradient treatment alternatives that do not involve source control. AMD source control can be achieved by shifting the micr
Jan 1, 2005
-
Got Wet Or Dry? Get Mist Drilling.By Dan Armour
Bolting solutions traditionally offered only wet drilling or dry drilling options; each with advantages and disadvantages. Joy Mining Machinery has developed a Mist Drilling System that incorporates t
Jan 1, 2005
-
Managing Copper In Leach Solution At The Çöpler Gold Project: Laboratory Testing And Process Design - IntroductionBy M. Botz
Anatolia Minerals Development Limited (AMDL) is constructing the Çöpler Gold Project in eastern Turkey and commenced mining in the fourth quarter of 2009 with gold production scheduled to begin in the
Jan 1, 2011
-
Full-Face Shaft Sinking At The Atomic Energy Of Canada Limited Underground Research LaboratoryBy G. W. R. Kuzyk
The Underground Research Laboratory (URL) , a major geotechnical research facility, is currently being developed by Atomic Energy of Canada Limited (AECL) , 120 km northeast of Winnipeg, Manitoba. The
Jan 1, 1989
-
Mineral Appraisal Issues In Court TestimonyBy J. S. Limb
Actual issues which arose during the discovery process or subsequent court testimony are presented. While most of these issues relate to the author’s specialty of mineral appraisal some are more g
Jan 1, 2001
-
Adaption of Protective Linings for Sewer Tunnels to Project NeedsBy Gilles Recher, Jörg Riechers, Albert Lueghamer
"INTRODUCTIONIn view of a global trend towards urbanization, more and more trunk sewers and combined sewer overflow tunnels (CSO) with medium to large diameters and the corresponding link sewers are c
Jan 1, 2016
-
Enhancement Of Bacterial Iron And Sulfate Respiration For In Situ Bioremediation Of Acid Mine Drainage Sites: A Case Study (9e023564-700d-405d-941a-989b38ed4fb9)By A. A. Bilgin
The prevention of acid mine drainage (AMD) in situ is more attractive than down-gradient treatment alternatives that do not involve source control. AMD source control can be achieved by shifting the m
Jan 1, 2007
-
Planning to meet the required DPM concentration levels in underground mines ? a calibration modelBy k. Osei-Boakye
This paper presents the calibration of a real-time aerosol monitor, the TSI DustTrak?, to the NIOSH 5040 method being used by the Mine Safety and Health Administration (MSHA) for compliance enforcemen
Jan 1, 2009
-
Basic Tools for Deformation Measurements in MinesBy Charles J. Hass
INTRODUCTION Deformation measurements are some of the simplest and most useful measurements that can be made by the mining/rock mechanics engineer in assessing the sta¬bility of openings in rock. A
Jan 1, 1982
-
Development Of High-Efficiency Hydraulic SeparatorsBy Karen Mikkola, Gerald Luttrell, Jaisen Kohmuench, Glen Oswald, Michael Mankosa, Tracy Westerfield
Hydraulic separators are commonly used for particle size classification and gravity concentration of minerals and coal. Unfortunately, the efficiency of these processes can be quite low due to poor eq
Jan 1, 2005
-
Refuge Alternatives Relief Valve Testing and Design with Updated Test Stand (9e43a085-27e9-4b46-9823-dfa3417fad70)By P. T. Bissert, T. J. Lutz, J. A. Yonkey, G. T. Homce
"Underground refuge alternatives require an air source to supply breathable air to the occupants. This requires pressure relief valves to prevent unsafe pressures from building up within the refuge al
Jan 3, 2018
-
Review Of The Gold And Silver MarketsBy James L. Poole
The gold and silver markets from the late 1960's to the present are reviewed and the outlook for these metals in the 1980's is presented. Included in this discussion is a summary of the basi
Jan 1, 1981
-
Roof Stability Studies In The Bear Mine, Somerset, Colorado; A Case HistoryBy Daryl E. Radcliffe, Raymond M. Stateham
The Bureau of Mines, under a Cooperative Agreement with the Bear Coal Company, Somerset, Colorado, conducted a large scale evaluation of the effect of time lapse on roof stability. Time lapse in this
Jan 1, 1982
-
Desulfurization of coal by microbial flotation in a semicontinuous systemBy N. Ohmura, H. Saiki, T. Nagaoka
A microbiological flotation system that facilitates the removal of pyritic sulfurfrom coal is reported. The chemoautotrophic bacterium Thiobacillus ferrooxidans is utilized as a pyrite-selective biolo
Jan 1, 2000