Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Large Scale Geotechnical Works on Norways Largest Infrastructure ProjectBy Brandon M. Robinson, Osman F. Besler, Dominik Gaechter
With the increase in population over the last decade, and anticipated population growth over the coming years, Norway is making significant investments in the Country’s infrastructure. Part of this in
Sep 8, 2021
-
Load and Resistance Factor Design – Past, Present and FutureBy Silas C. Nichols, Jennifer E. Nicks
"Limit states design (LSD), or load and resistance factor design (LRFD), is a method to account for the uncertainty in loads and resistance through a reliability calibration that requires all applicab
Jan 1, 2015
-
Bore Pile Stabilization Issues in Offshore Marine WorksBy Nuno Cruz, Saúl Rodríguez
"When executing offshore bored piles there are several specific factors and problems to consider in order to guarantee excavation stability. One of the methods employed to carry out this type of work
Jan 1, 2017
-
Ideas To Improve Driven Pile Foundation Design And Installation ProceduresBy Armin W. Stuedlein, Steven R. Saye
The differences between calculated axial pile capacity and the capacity realized during and following installation has long presented a significant concern for foundation engineers and contractors. Su
-
Negative Drag Reduction On Spliced Piles - An Insitu Study - SynopsisBy Gopal Ranjan
An insitu prtotype study on precast driven spliced piles in soft marine clay deposit has been carried out to study negative drag. The drag is generated by loading the ambient clay. For reduction in ne
Jan 1, 1996
-
CFA Pile Design Parameters in SandBy Stuart Coutts
"This paper presents an overview of the author’s experience related to the assessment of the base capacity of straight shafted and enlarged-base bored piles in sand. A design approach based on CPT qc
Jan 1, 1900
-
Embodied Carbon Assessment For A Multi-Phased Development Pile Testing StrategyBy Jack Taggart, Chris Barker
Pile load testing strategies for large infrastructure projects and multi-phase building developments have historically justified cost and programme benefits for undertaking advance preliminary and wor
May 1, 2022
-
Performance Monitoring of Mixed Ground Working Platform for a CCR Surface ImpoundmentBy Ali Ebrahimi, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, Roneet Das, William Tanner, Amir Ahmadipur
There are safety concerns related to operation of heavy equipment over coal combustion residual (CCR) impoundments during construction of the impoundment closure programs. As part of a pilot study pri
Jan 1, 2019
-
Performance of Large-Diameter Bored Pile Socketed In Sandstone and Siltstone in ThailandBy Zaw Zaw Aye, Sereyroath Chea, Nutthapon Thasnanipan, Thayanan Boonyarak
"As there are only limited numbers of bored pile constructed in sandstone and siltstone in Thailand, load transfer and settlement behavior of a pile in these rocks are still not fully understood. Majo
Jan 1, 1900
-
Simulation Of Soil-structure Interaction With Sheet Pile And Retained SoilBy Clarissa Aguiar, Seok hyeon Chai, Thamer Yacoub, Sina Javankhoshdel
Sheet piles are used as an excavation support for soil retention. They are interlocked systems to form a wall for earth support along with anchors to provide an extra lateral support in excavations. T
-
A Study Of Aspects Of The Historical Development Of Geotechnical EngineeringBy Thomas J. Kennedy, Michael D. Bennett
The study of geotechnical history is well-established. Most geotechnical practitioners, teachers, and graduate students have some grasp of the origins of the field. However, this understanding often c
Oct 1, 2022
-
Bio-Grout Based Soil ImprovementBy Terzis D. PhD, Katterbach M.
While awareness around the environmental impact of existing grout materials and chemical binders is increasing rapidly, biotechnologies are growing traction as sustainable alternatives in groundwork o
May 1, 2022
-
Nailed It! The Great Wall of the Chinese EmbassyBy Fred Tarquinio, Giovanni Bonita, Lars Wagner
"A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large
Jan 1, 2007
-
Vibro Stone Columns With Preloading – An Effective Foundation Solution For Large Storage StructuresBy Ramanathan C, Prasad P. V. S. R
The most critical challenge for any large size storage structures to be constructed on soft compressible soils is bearing capacity and consolidation settlements. Consolidation is the time dependent ph
Sep 1, 2022
-
Foundation Challenges And Innovative Solutions: The Wharf Phase 2, Washington, DcBy Aaron L. Sacks, David R. Good, Srinivas Yennamanda, Joseph K. Carey
Construction of Parcels 6 and 7, the second phase of The Wharf, began in 2019 and geotechnical construction was completed by December 2020. The overall project consisted of horizontal site, parks, and
Oct 1, 2022
-
Specialty Geo-Engineering in a Caisson TownBy William H. Walton, Joel Dellaria, Jeffrey R. Hill
The City of Chicago has a world-renowned skyline and is known for its provocative architecture. The subsurface conditions in the city have allowed for construction of these significant structures. The
Jan 1, 2019
-
The Little Lake Harris Bridge Settlement Restoration Project: Lessons LearnedBy Amr Sallam, David Thompson, Moataz Hassan
"The Little Lake Harris (LLH) Bridge was constructed in 1951 to replace the eastwest County Road 48 Bridge connecting the towns of Howey-in-the-Hills and Astatula in Lake County, Florida, United State
Jan 1, 2015
-
Bluestone Dam Safety Assurance Program: An OPA Runner UpBy Jeff Hopple
"Bluestone Dam in Hinton, W.Va., along the New River, is owned and operated by the U.S. Army Corps of Engineers (USACE). Completed in 1949, the dam is 165 ft (50 m) tall, 2,048 ft (624 m) wide, and en
Jan 1, 2014
-
Risk Assessment and Quality Control on Grouted Waterretaining Layers by Observational EngineeringBy Bartho J. Admiraal
"As part of the Schiphol-Amsterdam-Almere project, the largest aqueduct in Europe is being built in order for the A1 motorway to cross the Vecht River. The A1 consists of 12 lanes and the total width
Jan 1, 2016
-
Ground Improvement by Dynamic Replacement within Intertidal Mangrove Mud Environment, Ichthys LNG, DarwinBy J. Racinais, P. Vincent
"In September 2011, Menard Oceania (MO) was engaged by Mac Mahon John Holland Joint Venture (MJHJV) to provide ground improvement solution for the $34bn Ichthys LNG development. With close to 400,000m
Jan 1, 1900