Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Axial Pile Response Evaluation By Geophysical Piezocone Tests

    By Paul W. Mayne

    The axial load-displacement-capacity and load-transfer response of deep foundations can be conveniently assessed by geophysical piezocone tests that provide four independent readings with depth, inclu

    Jan 1, 2002

  • DFI
    Challenges Associated with the Construction of a Cofferdam – A Case Study

    By Eric S. White, Thomas J. Sabourin, Khuram R. Mohib

    "This paper presents the challenges associated with the design and construction of a steel sheet pile cofferdam supported with one level of grouted anchors in clean to silty sand with gravel. The init

    Jan 1, 2017

  • DFI
    Foundation Base Material Strength Assessment for Drilled Pipe Piles using Force and Displacement Data

    By Patrick J. Hannigan, Geir Veslegard, Frank Rausche, Rozbeh B. Moghaddam

    A common type of deep foundation used in Norway to support bridge structures is the drilled pipe piles (piles) filled with concrete reinforcement after installation. The standard installation practice

    Jan 1, 2018

  • DFI
    New Findings on the Capacity of Connections between Micropiles and Existing Footings

    By João Veludo, Eduardo Júlio, Helen D. Robinson, Jesús E. Gómez

    "Utilization of micropiles for structural retrofit requires connection of the micropiles to the footings of the existing structure. Almost ten years ago, an experimental research effort was carried ou

    Jan 1, 2015

  • DFI
    Toward Understanding the Seismic Performance of Rigid Inclusions

    By J. Tanner Blackburn, James R. Gingery, Lisheng Shao

    Rigid inclusions consist of grout columns installed using displacement auger or vibrated tooling. The columns are typically installed in an array to provide support for footings, mats, or embankments.

    Jan 1, 2018

  • DFI
    Practical Soil Nail Wall Design And Constructability Issues

    By Walter G. Kutschke

    Four significant soil nail wall projects in the eastern United States were recently completed with a combined area of 175,000 square feet of finished shotcrete surface. These projects required the us

    Jan 1, 2007

  • DFI
    Recent Developments In The Law Of Deep Foundations

    By Brian P. Waagner

    Construction law in general and the law of deep foundations in particular continues to develop rapidly, particularly in the areas of risk allocation. Public and private owners are increasingly using c

    Jan 1, 2002

  • DFI
    Atoka Pipeline - Canadian River Crossing

    By Jewels Stover, Charles A. Luxford

    Oklahoma City is undergoing a replacement program for an existing 66in (1.675m) water pipeline that conveys raw water from Atoka Reservoir to the City. This pipeline currently crosses the Canadian Riv

    Sep 8, 2021

  • DFI
    LRFD Resistance Factors for Design of Driven Piles Using the Texas Cone Penetration (TCP) Test

    By Rozbeh Moghaddam, William D. Lawson, Priyantha W. Jayawickrama, Hoyoung Seo, James G. Surles

    "This study provides calibration of resistance factors (?) for design of driven piles to implement Load and Resistance Factor Design (LRFD) for bridge foundations using Texas Cone Penetration (TCP) Te

    Jan 1, 2017

  • DFI
    Brightman Street Bridge Replacement Project (fbb13111-569c-48aa-97e7-9bb48f6ec170)

    By Jeffrey M. Taylor, Arturo Ressi di Cervia

    "Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, con

    Jan 1, 2004

  • DFI
    Inspection and Observation Methods

    "Full time inspection of drilled shafts by qualified personnel is a necessary part of construction. Detailed inspection procedures for routine inspection are provided in the Drilled Shaft Inspector’s

    Jan 1, 2004

  • DFI
    Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging Project

    By José Carlos do Amaral, Marcelo Groszownik, Jorge Beim

    "Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the

    Jan 1, 2015

  • DFI
    Drilled Displacement Piles - Current Practice And Design

    By Prasenjit Basu

    Drilled displacement piles are being increasingly used as foundation elements, particularly in projects requiring fast construction. Different types of drilled displacement (DD) piles are available i

    Jan 1, 2010

  • DFI
    Diaphragm Walls, Recent Developments to Improve Reliability

    By A. Frits van Tol, Rodriaan Spruit, Jan H. van Dalen

    "Abstract In recent years, there have been major problems with deep excavations in urban areas supported by diaphragm walls. In some cases, like the fatal Nicoll Highway collapse in Singapore the qual

    Jan 1, 2014

  • DFI
    Permanent Earth Retention for Deep Excavation Installed Within Minimal Right of Way Limits

    By Thomas D. Humbert, Christopher J. Ramsey

    Construction of a new underground parking structure in State College, Pennsylvania, is situated on a site constrained by limited ROW and required excavations ranging in depth from 25 ft to 40 ft. Addi

    Jan 1, 2019

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (6ba9ad25-c173-46b9-a527-da25ba80fe4d)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2002

  • DFI
    A Review of the Design Formulations for Static Axial Response of Deep Foundations from Cone Penetration Test Data

    By Fawad S. Niazi

    Analysis of deep foundations in terms of axial capacity has been a topic of great interest in the soil-structure interaction problems. Soil behavior is governed by a series of complex stress-strain ch

    Jan 1, 2013

  • DFI
    Basement Excavation: Cost Effective Retention System for a Multi Storeyed Structure

    By Madan Kumar Annam, Hari Krishna Y

    "Basement construction is one of the challenging geotechnical concerns in the urban environment. Several types of retention systems are practiced to support the earth which is suitable for restricted

    Jan 1, 2015

  • DFI
    High Capacity Drilled Piles in Brooklyn

    By Ahmed Elmekati, Frederick C. Rhyner, Steven R. Lowe

    "The current phase of the Pacific Park development (formerly, Atlantic Yards) in Brooklyn involves constructing buildings on a platform over an existing LIRR rail yard. To preserve the maximum amount

    Jan 1, 2016

  • DFI
    Static And Dynamic Tests For Evaluation Of The Vertical Load Bearing Capacity Of Piles - Summary

    By Madan B. Karkee

    The understanding and the development of sound theoretical basis concerning the pile foundations has been phenomenal during the past few decades, considering the thousands of years the piles have evid

    Jan 1, 1997