Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Permanent Displacement And Pile Driving Vibrations - SummaryBy Charles H. Dowding
Whenever piling vibrations are significant, construction activities associated with pile driving and/or excavation can produce permanent displacement. These permanent displacements are more detrimenta
Jan 1, 1991
-
Low Overhead Secant Piles Drilled From Within A ShaftBy Allen B. Stanton, Parthiv Brahmbhatt, Michael Grimm, Stanley L. Worst
Constructing a circular shaft consisting of secant piles has its own complications which make it more difficult than typical drilled shaft construction. Add to that performing under low overhead power
Oct 1, 2022
-
Variation Of Load Settlement Relations Of 25 Steel Pipe Piles Constructed In A Site From Rapid Pile Load TestingBy Tatsunori Matsumoto
In order to investigate the variation of the load-displacement relations of piles in a site, vertical load tests were carried out on 25 small diameter steel pipe piles. Out of 25 piles, 15 piles were
Jan 1, 2006
-
Experimental P-Y Curves from Centrifuge Tests on Pile Foundations Subjected to Liquefaction and Lateral SpreadingBy Arash Khosravifar, Nason McCullough, Stephen, Milad Souri, Scott Schlechter, E. Dickenson
The results of five centrifuge models were used to evaluate the response of pile-supported wharves subjected to inertial and liquefaction-induced lateral spreading loads. The centrifuge models contain
Jan 1, 2019
-
The Analysis Of FEM On The Anchorage Consolidation For Stabilizing A Tunnel With Thick Overburden ? SynopsisBy J. M. Pei
In this paper, the nonlinear finite element analysis is used to study the support system of a tunnel which is designed to pass through deep-embeded stratum. The rock mass is rather intact, though a se
Jan 1, 2010
-
Application of Dry Jet Mixing to Earthquake DisasterBy Kozo Takeda, Arashi Shimano
"Dry Jet Mixing (DJM) method as the representative deep mixing technique has been demonstrating best practice on ground mitigation works coping with complicated soil condition and limited site space.
Jan 1, 2015
-
Displacement Dependent Stiffness And Damping Constants Of Pile GroupsBy Shamsher Prakash
Equivalent spring constants for analysis of footings is a function of Young's modulus of pile material (Ep), shear modulus of soil (Gs), and geometry of the footing and/or piles. Shear modulus is
Jan 1, 2002
-
Aseismic and Anti-Tsunami Upgrades of Existing Coastal Levees and Seawalls in High Risk RegionsBy Takefumi Takuma, Hiroyuki Nishimura, Shigeru Kambe
"Japan’s Great Tohoku Earthquake and the immediately following tsunami of March 11, 2011 killed more than fifteen thousand people and destroyed numerous buildings and infrastructures in the northeaste
Jan 1, 2017
-
Design of a Raft Assisted Piled Foundation for a High Rise Prefabricated Hotel Structure in Perth, Wa.By Lucie Spencer, Craig Butterworth
"This paper presents the design of a raft enhanced pile group recently constructed for a hotel development in Perth, WA. At the time of construction in 2016 the hotel was the tallest prefabricated hot
Jan 1, 1900
-
Execution of Pile Installation in Environmentally Challenging SitesBy Dena Morgan, Emre Biringen
"Abstract This paper discusses the execution of pile installation and design issues at two environmentally challenging industrial sites in North America. Environmental regulations set constraints on t
Jan 1, 2014
-
Corroboration and Remediation Options"After the non-destructive testing is completed, the data must be compiled, evaluated, and interpreted. During this process, the data may indicate that there is an anomaly warranting further investiga
Jan 1, 2004
-
Pile Design For Offshore Structures Subjected To SubsidenceBy Juan J. Campo
The Freeport-McMoRan Main Pass Mine development in the Gulf of Mexico is a complex designed to extract up to 67 million long tons of sulphur over a 40 year period. The initial development includes 15
Jan 1, 1992
-
Behavior Of Mini-Piles Used In Foundation Underpinning In Beaumont Clay, Houston, Texas, USABy O&apos, M. W. Neill
Mini-piles have been found to be a practical, technically correct remedial underpinning method. They can be constructed in limited access areas with very little disruption. Experience indicated that m
Jan 1, 1989
-
Accuracy of Low-Strain Pile Integrity Test ResultsBy Mahesh Hingorani
Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv
Jan 1, 2019
-
Deep Foundations In Hong Kong - SynopsisBy Martin Pratt
This paper is an overview of deep foundation engineering in Hong Kong past, present and future. The enormity of the subject compared with the space available makes brevity inevitable. Issues of constr
Jan 1, 2000
-
A Case Study, Design Change from Spread Footing to Drilled ShaftsBy Drew M. Kurtz, Jeff L. Rai, Sara F. Frailey, Mohammad Ayub Iqbal
"This paper presents the foundation changes made for a five-span bridge over the Lehigh River constructed as a design-build project. During excavation within the cofferdam at Pier 2 for the constructi
Jan 1, 2016
-
Optimization of Design of Drilled Shaft Foundations by Lateral Load Testing (94ee84ca-5eda-40d1-bba2-d7742a925002)By Donald R. Clark
"Drilled shafts are being used as foundation support for parabolic solar troughs at the Genesis Solar Project being constructed near Blythe, California. Three types of drilled shaft foundations are re
Jan 1, 2017
-
Optimization Of Design Of Drilled Shaft Foundations By Lateral Load TestingBy Donald R. Clark
Drilled shafts are being used as foundation support for parabolic solar troughs at the Genesis Solar Project being constructed near Blythe, California. Three types of drilled shaft foundations are re
-
Thornton Road, Listerhills, BradfordBy B. C. Slocombe
A large derelict inner city site was regenerated for use as a distribution warehouse. Difficult topography and soils conditions required the adoption of a combination of specialist geotechnical proces
Jan 1, 1989
-
Improved Drainage by Drilled Filter Drains, Dam Safety Upgrade, Case StudyBy Carl-Oscar Nilsson, Åke B. Nilsson
"The embankment dam at Storfinnforsen is 23 m high and was completed in 1954. The dam has an impervious zone with timber sheet piles and a support fill of glacial till. The pore water pressure in the
Jan 1, 2016