Observational And Numerical Evaluation Of Defects In Deep Mixing Method Columns Used For Lng Process Train Structural Foundation SupportBy Paul J. Sabatini
Between 2008 and 2009, more than 6,000, 23-m long deep mixing method (DMM) elements were constructed to support 124 concrete mats comprising the foundations for the process trains for an LNG facility.
-
Port Orange Drilled Shaft Load Tests - IntroductionBy David K. Crapps
The drilled shaft load tests at Port Orange were part of a demonstration project sponsored by the Federal Highway Administration (FHWA) and the Florida Department of Transportation (FDOT). Three load
Jan 1, 1989
-
Ground Improvement By Means Of Stabilising ColumnsBy Georg Breitsprecher
The technique of Stabilising Columns (product names are for example "Stabilisierungssaulen" (STS) or "Coplan Stabilisierungs-verfahren" (CSV)) is gradually becoming well accepted for ground improvemen
Jan 1, 2006
-
Marine Foundation Retrofi t for the Richmond - San Rafael BridgeBy Patrick E. Durnal, Henrik Dahl
"A joint venture of Ben C. Gerwick Inc., Sverdrup (now Jacobs) and DMJM (now DMJM + Harris) designed the $779 million seismic upgrade of the Richmond - San Rafael Bridge over the San Pablo Bay in the
Jan 1, 2007
-
Ground Improvement By Jet Grouting For A Natural Gas Combined Cycle Power Plant In TurkeyBy Alp Gokalp
The aim of this article is to present an application of jet grouting technique in stiff clays for foundations of the natural gas combined cycle power plant, under construction in Aliaga, Turkey. The p
Jan 1, 2002
-
Design of the Lift-in Dam at Olmsted on the Ohio RiverBy Dale E. Berner
A new navigation dam at Olmsted on the Ohio River will be built "in-the-wet" using a lift-in construction method by the Washington Group/Alberici Joint Venture for the U.S. Army Corps of Engineers, Lo
May 11, 2007
-
Costa Rica Circunvalacion Norte Project: Lessons Learned From Foundation DrillingBy Bernardo J. Jiménez, Harlem Lora, Roberto Acosta Mora
Circunvalacion Norte project is currently the most important infrastructure project in Costa Rica. It is the last segment of the urban perimeter highway. Site investigation of local geotechnical condi
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Implementation Of Test Results - ImplementationBy Darrell L. Beddard
The test program information provided for some immediate changes on the upcoming contracts and in contract administration for the I-880 Replacement Project. Plan sheet modifications included changes t
Jan 1, 1996
-
Extensive Pile Testing of Auger Pressure Grouted Displacement (APGD) Piles, Los Angeles, CaliforniaBy Todd W. Armstrong, Michael D. Reader
"INTRODUCTIONThe Playa Vista Development is the largest urban infill development in the history of the United States. Overall, it encompasses about 1100 acres in the City of Los Angeles and is situate
Jan 1, 2005
-
Bearing And Friction Design Capacity Software For Helical Anchors And PilesBy Gary L. Seider
Chance, a Division of Hubbell Power Systems, Inc., in conjunction with Sailors Engineering, Inc. has updated its Helical Design Capacity Software. This latest version, ?HeliCAP® v2.0?, is a state-of-
Jan 1, 2007
-
Keynote Lecture 2: Dr. Masaaki Terashi The State of Practice in Deep Mixing MethodsBy Masaaki Terashi
The machine for the hybrid method called JACSMAN is ordinarily a dual shaft machine. Each shaft has augers at three different levels and nozzles for jetting at two different levels. The distance betwe
Feb 10, 2003
-
Upgrading of the Equipment on CDM Vessels to Accommodate Water Depth and Environmental ConsiderationsBy Takashi Enomoto
"The cement deep mixing (CDM) method has a wide range of applications, both on land and at sea. This paper describes the features of the equipment on CDM vessels engaged in maritime construction in Ja
Jan 1, 2015
-
A New Design Method For Drilled Shafts In Rock ? SynopsisBy Chris M. Haberfield
The design of side resistance of drilled shafts socketed into rock has traditionally been empirically based on the results of pile loading tests in which the side resistance can be isolated from the s
Jan 1, 1996
-
Mindful Monitoring Of A Variable Excavation Support SystemBy B. Philip Shull, Allen W. Cadden, Johanna M. Simon, Michael S. Senior
A 670 linear meter (2,200 linear foot) large-diameter sanitary sewer interceptor installation at depths ranging from 3 to 10 m (10 to 30 ft) below existing grade in an area with a high water table req
-
Seismoacoustic Effects Of Driving Large Diameter Piles ? SummaryBy Barry C. Roth
Driving of large piles in water can impact marine wildlife. Bubble curtains can mitigate these adverse effects. The procedures for and preliminary results of monitoring airborne, waterborne and ground
Jan 1, 2001
-
Seven Mile Dam Retrofit - A Global ChallengeBy Arvindh Gupta
BC Hydro proposed to improve the stability of the existing Seven Mile Dam with 54 corrosion protected, re-stressable anchors comprising 92/0.6? strands each, in phase 2 of the program. Being globally
Jan 1, 2004
-
An Active Soil Nail Wall Underpinning SolutionBy Jonathan Ernst
The Bruce Museum is an art, science and natural history museum in Green- wich, Connecticut. The museum was originally built as a private residence in 1853, and has undergone several reno- vations, the
Aug 1, 2023
-
Marine Foundations Of Bridges In The Northeastern USABy James S. Graham
Marine design and construction methods are presented on the caisson foundations for the tower piers at the Brooklyn, Ben Franklin, Delaware Memorial 1st, Tappan Zee, Walt Whitman, Throgs Neck, Verraza
Jan 1, 2005
-
Marine Foundations Of Bridges In The Northeastern USA (dd1131f4-385d-4efe-8191-edcc7983fec3)By James S. Graham
Marine design and construction methods are presented on the caisson foundations for the tower piers at the Brooklyn, Ben Franklin, Delaware Memorial 1st, Tappan Zee, Walt Whitman, Throgs Neck, Verraza
Jan 1, 2013
-
Load Tests Of Bored Piles In Weathered BedrockBy James C. Scott
Compression and tension load testing were performed on bored concrete piles installed to depths of 18 to 34 meters below excavation levels for a large mixed-use development in Kuala Lumpur, Malaysia.
Jan 1, 2007