Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    From Open Cast to Block Cave and the Effects on the Autogenous Milling Circuit at Palabora Mining Copper (4c86e50a-2cf3-4106-bb4f-6a8b452c0d68)

    By J. Makgatho, P. Condori, J. Winnett, Fischerm D.

    "Palabora Mining Copper (PMC) has two autogenous mills that have been in operation since 1976. The mills were originally designed to treat 30 000 t/d of open cast copper ore in a closed circuit with c

    Jan 1, 2012

  • CIM
    Environmental Challenges of Aluminium Processing Waste and Simultaneous Utilization of Waste for Sustainable Future

    By T. Thriveni, Ji Whan Ahn

    "The current advanced technologies for the manufacture of light weight metals processing significantly increasing and attributes to the safety, performance, recyclability and economy. Still lack of te

    Jan 1, 2016

  • CIM
    Quasi-Real Time Seismic Hazard Maps for Mining

    By Marty Hudyma

    Mining-induced seismicity and rockbursting is one of the primary risks in deep mines. Seismic data management software has been created to facilitate analysis of mining-induced seismicity. The Mine Se

    Oct 1, 2009

  • CIM
    Pétrographe de la matière organique et assemblages des minéraux des argiles du district minier et de la région de Pine Point, Canada : Une caractérisation des anomalies associées aux gîtes

    By André Chagnon, Héroux. Yvon

    "Résumé - Cette étude porte sur l'altération de la matière organique et des argiles dans les boues carbonatés dévoniennes du facies ""F' de la Formation de Pine Point et ses équivalents stra

    Jan 1, 1994

  • CIM
    Lightweight Aggregates and Their Use in the Construction Industry

    By LeRoy A. Thorssen

    The use of lightweight aggregate as a constituent of concrete is not a recent development. Pumice was used by the early Romans, in pozzolana cement concretes, in the construction of many of their work

    Jan 1, 1963

  • CIM
    Surf Inlet and Pugsley Mines

    By J. E. Gill, A. R. Byers

    The Surf and Pugsley gold-copper mines; owned and operated by Surf Inlet Consolidated Gold Mines; Limited; are about 6 miles inland from; the head of Surf inlet; on Princess Royal island; Skeena minin

    Jan 1, 1954

  • CIM
    Hydrometallurgical Treatment of Arsenic Containing Materials

    By David Dreisinger

    Arsenic occurs in nature in association with many valuable metals including copper, nickel, cobalt, gold and platinum group metals. The recovery of these valuable metals is of course complicated by th

    Jan 1, 2014

  • CIM
    Towards Mechanistic Descriptions of Charge and Slurry Transport in Tumbling Mills (9cf2cc6c-a5a7-4d0b-861d-5dfc2f8aa93b)

    By D. J. Parker, G. B. Tupper, I. Govender

    Positron-Emission-Particle-Tracking (PEPT) has enabled the non-invasive observation of charge and slurry transport in model mills under operational conditions. We use high quality PEPT data to infer t

    Jan 1, 2012

  • CIM
    Feasibility of Dry High Pressure Grinding and Classification (f2953295-f605-4861-a239-620164c4140f)

    "High Pressure Grinding Roll (“HPGR”) technology is applied in a broadening range of minerals processing applications for relatively wet or moist materials. HPGR grinding of dry material or involving

    Jan 1, 2012

  • CIM
    The Advanced Control Project at Highland Valley Copper

    By Cy Jordan, Ben Burdett, Adrian Dance, Jack Rainey

    "In 1997, EIMCO Minerals installed a knowledge-based control system on one of the five primary grinding lines at Highland Valley Copper. The objective of the system is to maximise throughput without a

    Jan 1, 1998

  • CIM
    Applying Online Ore Hardness Estimation to Sag Operation and Optimisation

    By S. Makni, G. Gagnon, F. Couët, C. Rochefort

    "Comminution represents a significant part of mineral processing plant operating costs. Yet, autogenous (AG) or semi-autogenous grinding mills (SAG) are difficult to control because of disturbances li

    Jan 1, 2016

  • CIM
    Preliminary results of a hydrodynamic study on a plasma-lift reactor

    By L Munholand, G. Soucy, P. Quintal

    This work presents early results from the first study to optimize the hydrodynamics of a Plasma Lift Reactor (PLR). The PLR is designed to break down organic contaminants in aqueous solutions. New exp

    Jan 1, 2005

  • CIM
    Arsine Risk Management at CCR’s Electrolyte Purification Plant

    By A. Majumdar, B. Servière, H. Persson

    The CCR refinery, which was built in 1931, treats both internal and third party copper anodes to produce 325,000 mt of copper as cathodes. These anodes contain high levels of impurities, such as Ni, A

    Jan 1, 2019

  • CIM
    Estimation of the in Situ Block Size in Jointed Rock Masses Using Three-Dimensional Block Simulations and Discontinuity Measurements

    By M. Pötsch, A. Kluckner, P. Söllner, W. Schubert

    "The in situ block size is a key parameter in the geomechanical characterization of rock masses. It describes the fracturing of the rock mass and thus is a measure for the degradation of the rock mass

    Jan 1, 2015

  • CIM
    An Operator Oriented Flotation Model

    By L. J. Surges, C. Bazin, D. Hodouin

    "A kinetic model was developed for the conditioning and flotation processes of an industrial lead concentrate dezincing circuit. The models were incorporated into a flowsheet simulator. Simulation res

    Jan 1, 1988

  • CIM
    Sharing Industry Knowledge to Improve Management of Risks and Safety in the use of Explosives in Surface Mining

    RISKGATE is an interactive online risk management system developed by the Minerals Industry Safety and Health Centre (MISHC; University of Queensland) to assist the mining industry in implementing con

    Aug 1, 2013

  • CIM
    A Zero - Waste Process for Copper Smelting Slags

    By J. Smit, F. Parada, R. Parra, E. Balladares, M. P. Merino

    "In this study, a two-step process was developed for recovering copper, molybdenum, zinc and iron (hematite). In the first step, grinded slags (-65 mesh) were sulphated with SO3 at 350-500ºC to form i

    Jan 1, 2014

  • CIM
    VLF-EM Data Processing

    By D. C. Fraser

    "Geophysical Engineering and Surveys Limited of the Keevil Mining Group have routinely conducted ground surveys with VLF-EM receivers for the past two years. Both Crone's Radem and Ronka's EM16 have b

    Jan 1, 1971

  • CIM
    Risk Management Approach to Taphole Integrity at Olympic Dam Copper Smelter

    By F. Musuka, D. Jenkins, A. Keyes

    BHP Olympic Dam operates a Direct-to-Blister copper flash smelting Furnace (DBF) and an Electric Slag Cleaning Furnace (ESCF). Tapping blister copper from these furnaces via tapholes is a routine task

    Jan 1, 2019

  • CIM
    Role and Behaviour of Copper in HBMS's Zinc Pressure Leach Plant

    By S. Shairp

    Copper is an impurity as well as a necessary reagent in the processing of zinc sulfide concentrate at Hudson Bay Mining & Smelting Co., Limited's (HBMS) zinc pressure leach plant. Copper is prese

    Jan 1, 2008