Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Precision and Bias For Settlements

    By Jan W. Merks

    "The settlements between mines and smelters are based on the mass of metal contained in concentrate lots. The mass of contained metal is a function of the wet mass of a lot, and its moisture content a

    Jan 1, 1995

  • CIM
    Pebble Grinding At Bethlehem Copper Corporation

    By E. A. Lowe, J. W. Smith, C. W. Overton

    "The operations of Bethlehem Copper are situated in the south-central interior of British Columbia at an elevation of 4900 feet above sea level. Main road and rail transportation systems pass through

    Jan 1, 1975

  • CIM
    The New Britiannia Project a TVX Gold Inc. /High Rlver Gold Mines Ltd. Joint Venture

    By Roy Lindsay, Paul O'Hara, Gary Halverson

    "The New Britannia Minesite is located in Snow Lake, Manitoba, 420 miles north of Winnipeg (figure 1). The mine previously operated from 1949 to 1958 extracting some 5.39 million tons of ore at a 0.15

    Jan 1, 1996

  • CIM
    Effective Methods of Arsenic Removal from Gold Mine Wastes

    By J. Lee, R. G. Rosehart

    "The basic problem of arsenic contamination from mine water is discussed. Effective methods of removal involving chemical precipitation, activated carbon adsorption, ion exchange and reverse osmosis a

    Jan 1, 1972

  • CIM
    In situ acid leaching of copper tailings deposits: A case history

    By C. D. Shackelford, J. F. Muñoz, M. Vauclin, P. Rengifo, A. Suazo

    The results of a field-scale study involving in situ leaching of copper ore tailings using sulphuric acid as the leaching agent, injection wells to introduce the leaching solution and extraction wells

    Jan 1, 2001

  • CIM
    Dome Mine

    By T. C. Holmes

    "Dome mine, in the Porcupine mining camp of northern Ontario, is one of the important gold mines of Canada, its production of gold from the commencement in 1910 to the end of 1946 having a value of $1

    Jan 1, 1954

  • CIM
    Potash Processing, an Overview with Particular Reference to the Cominco Plant

    By A. F. Banks

    "Potash processing has much in common in terms of unit operations and plant operating strategy with other mineral processing plants. As it is a rather large topic the processes will be broad brushed t

    Jan 1, 1976

  • CIM
    Dynamic hydraulic shovel simulator for improved machine performance

    By S. Frimpong

    Hydraulic shovels are widely used for primary production in surface mining operations. Variability in material diggability, unstructured mining environments and limited space and operator inefficiency

    Jan 1, 2005

  • CIM
    Mine ventilation: Waste heat recovery

    By L. Henry Smith, David C. Arthur

    "The Williams Mine is Canada’s largest gold producer, with annual production of 450 000ounces from 2 300 000 tonnes of ore. Highly mechanized and automated underground mining practices are employed in

    Jan 1, 1996

  • CIM
    Use of Photogrammetry to Estimate Mine Pillar Damage and Strength

    By H. McIntire, R. Preston, D. Roberts

    "Repeated 3D terrestrial digital photogrammetric surveys were conducted on hard rock mine pillars to characterize damage during secondary mining. Damage was quantified by measuring Depth of Failure, D

    Jan 1, 2015

  • CIM
    Quality control requirements for more reliable mineral deposit and reserve estimates

    By Deni Côte, Michel Dagbert, Marcel Vallée

    "Greater reliability of mineral deposit and reserve estimates can be attained through better quality control of the data and information acquisition, and the estimation processes. This paper reviews t

    Jan 1, 1993

  • CIM
    Grinding Practices at the Frood-Stobie Mill

    By G. A. Frame, J. G. Patterson

    The 24,000-tpd Frood-Stobie mill grinding circuit operation and control are described. Changes implemented during the past three years to improve grinding efficiency and capacity are discussed.

    Jan 1, 1971

  • CIM
    The Key Lake Uranium-Nickel Deposits

    By R. Gatzweiler

    The Key Lake nickel-uranium deposits are situated within the Wollaston domain of the Churchill structural province. The host rocks of the two orebodies are of Aphebian and Helikian age. The orebodies

    Jan 1, 1979

  • CIM
    Developing Solutions to Complex Flotation Problems

    By B. K. Gorain

    "Mining of low grade deposits along with the necessity to design and operate flotation plants with high throughput presents unique metallurgical and environmental challenges that need to be addressed

    Jan 1, 2013

  • CIM
    Compilation of Industry Practices for Control of Hazards Associated with Backfill in Underground Mines - Part I Surface and Plant Operations

    By Euler De Souza

    The authors conducted a study of backfill practices in underground mines across Canada to assess the current state of backfill usage and to overview potential hazards associated with backfill practice

    May 1, 2009

  • CIM
    Deep-well dewatering at Gibraltar Mines

    By T. L. Carpenter

    "The presence of excessive water in the Gibraltar East Stage 1 pit initiated studies into the ground-water conditions that might be expected in mining the Granite Lake and Pollyanna pits. Hydrologic i

    Jan 1, 1980

  • CIM
    Performance and Cost Comparison of Materials Used in Design and Fabrication of Hydrometallurgical Equipment

    By T. Johnson, K. Lambrych, D. Kelley

    Materials for construction of equipment used in hydrometallurgical plants are selected based on a combination of their ability to perform as required in aggressive process environments as well as thei

    Jan 1, 2015

  • CIM
    Filtration in the Mining Industry

    By W. C. Ferguson

    "This paper could be more appropriately titled ""The Application of Vacuum Filters to Underground Minewater Treatment. in a previous paper co-authored by the writer (1) the history and development of

    Jan 1, 1971

  • CIM
    Corporate Stakeholder Effects on International Law Norms of Consultation with Indigenous Communities

    By Dwight Newman

    This paper discusses the author?s work identifying international law norms of consultation with indigenous communities and poses a potentially counterintuitive argument that corporate stakeholders? in

    Aug 1, 2013

  • CIM
    Meeting Recruiting Challenges - Victor Project

    Project Schedule ?Construction 2005 ?2008 (3 years) ?Operations mid 2008 ?2020 (12 years) ?Closure 2020 ?2023 (3 years) ?Post-closure monitoring Victor Economic Facts ?$982 million investment;

    May 1, 2006