Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Advances in Continuous Miner Automation

    This paper describes new research and development currently being undertaken by the CSIRO Mining Technology Group to advance the automation capability of continuous mining equipment in underground coa

    Dec 6, 2010

  • AUSIMM
    The Importance Properties of Hydraulic Fill, with Particular Reference to Mechanized Cut and Fill Mining Operations

    Essential features of the role of the fill material in mechanized cut and fill mining are discussed, with particular emphasis on its dewatering and strength development after emplacement. The fill mat

    Jan 1, 1966

  • AUSIMM
    Mineralization at Aberfoyle Tin Mine Rossarden, Tasmania

    By Lyon R. J P

    The quartz-cassiterite-wolfram veins at the Aberfoyle Tin Mine, north-eastern Tasmania, form a sheeted zone about 200 ft. wide and 1,600 ft. long in slightly contact metamorphosed shales, slates and g

    Jan 1, 1957

  • AUSIMM
    Iron Ore - Mineral Processing Overview

    Iron Ore - Mineral Processing Overview Several years of iron ore price increases, coupled with a period of strong global demand for raw materials, presented iron and steel producers with unprecedente

    Sep 13, 2010

  • AUSIMM
    From Green Field Site to Block Cave Mine - Results of Northparke's Drill and Blast Design Process

    The green field site is one that has no history of mining and as such it presents the designer with a blank canvas, on which any number of drill and blasting options can be drafted. No matter which mi

    Jan 1, 1998

  • AUSIMM
    Chemical Environment in Australian Lead-Zinc Flotation Plant Pulps: II. Collector Residuals, Metals in Solution, and Other Parameters

    Up to 19 chemical parameters were studied in flotation pulps in six Australian lead-zinc concentrators with the aim of obtaining a better understanding of the nature of, and changes in, the chemical e

    Jan 1, 1970

  • AUSIMM
    Advances in Thickener Feedwell Design via Computational Fluid Dynamics Modelling

    Advances in Thickener Feedwell Design via Computational Fluid Dynamics Modelling

    Sep 13, 2010

  • AUSIMM
    Swamp Works – A New Approach to Develop Space Mining and Resource Extraction Technologies at NASA’s Kennedy Space Center: Prospecting, Excavation, Load, Haul and Dump for In Situ Resource Utilisation

    By A J. Nick, I I. Townsend, J M. Schuler, J D. Smith, R P. Mueller, L Sibille, K Leucht, J J. Fox

    The first steps for in situ resource utilisation (ISRU) on target bodies such as the Moon, Mars and near-Earth asteroids (NEA), and even comets, involve the same sequence of steps as in the terrestria

    Nov 4, 2015

  • AUSIMM
    Electrolytic Parting of Gold and Silver, At the Works of the Broken Hill Associated Smelters Pty. Ltd., Port Pirie.,

    By Met B. E

    During the operation of the Parkes process of desilverising, and in the earlier days of the continuous process, gold and silver were removed separately from softened lead bullion. Gold was removed in

    Jan 1, 1937

  • AUSIMM
    Disparate Tectonic Settings for Mineralisation in an Active Arc, Eastern Papua New Guinea and the Solomon Islands

    By C Spandler, S W. Richards G Rosenbaum, R J. Holm

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation.The recent and active magmatic arcs of eastern Papua New Guinea (PNG) and the Solomon Island

    Mar 18, 2015

  • AUSIMM
    Overview of the experimental phase equilibria studies of the Ni-Sn-S, Cu-Sb-S, Cu-Sn-S, Fe-Sb-As and Fe-Sn-As systems

    By M Akhtar, E Jak, M Shevchenko

    This article presents an overview of the experimental phase equilibria studies of S-containing systems (Ni-Sn-S, Cu-Sb-S, and Cu-Sn-S) and As-containing systems (Fe-Sb-As and Fe-Sn-As). These systems

    Jun 17, 2024

  • AUSIMM
    The Theory and Operation of a Laboratory Electrostatic Separator

    The process of electrostatic separation was developed in the late 19th century, but did not make much headway for about 25 years. High dc voltages, of the order of 20 kilovolts, are involved, and the

    Jan 1, 1950

  • AUSIMM
    Filtration Efficiency, Secondary Emissions and Reliability of Particle Filter Systems in Underground Workplaces

    By J Czerwinski, M Kasper, M Wyser, N Heeb

    The VERT project 1993 - 1998 laid the technical foundation for curtailing the emission of fine particles from diesel engines at Swiss underground workplaces. The targeted maximum was 100 ¦g/m3 EC. Ext

    Jan 1, 2005

  • AUSIMM
    Orogenic Gold Deposits – A Two-stage Process of Gold Enrichment

    By R R. Large

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The formation of orogenic gold deposits is commonly a two-stage process. The first stage in

    Mar 18, 2015

  • AUSIMM
    Mount Morgan Practice in Recording and Estimating Ore Tonnages and Values

    THE irregularity of the Mount Morgan ore body presents problems other than those for mining only. For irregularity of outline is coupled with irregularity of grade, and the ore varies so rapidly from

    Jan 1, 1910

  • AUSIMM
    Mine Stores

    The following data are put together to assist those who are responsible for ordering stores for mines and works. When making out a list of mine stores for a new plant, one can hardly be expected to re

  • AUSIMM
    Underground Mining at the Golden Cross Mine

    The modern Golden Cross mine entered the production phase in January 1992. The project is designed to produce over 100 000 oz/yr of gold and over 300 000 oz/yr of silver during a mine life of eight ye

    Jan 1, 1994

  • AUSIMM
    The Financing and Development of the Nagamble Gold Mine, Victoria

    The Nagambie heap leach gold mine commenced production of gold in September, 1989. The mine,120km north of Melbourne in Victoria, Australia, was developed by Perseverance Mining Cor- poration Ltd, a

    Jan 1, 1991

  • AUSIMM
    Concentration of Igneous Phosphate Ores via Froth Flotation - Challenges and Developments

    Igneous phosphate deposits located in tropical and subtropical regions of the world are characterised by low P2O5 grades, very diversified mineralogy and intensive lateral plus vertical variations in

    Sep 13, 2010

  • AUSIMM
    Acid Progress for Alumina Extraction

    The CSIRO acid alumina employs the essential steps of digestion, hydrolysis and calcination to produce pure alumina from ores too high in silica or too low in grade for the Bayer process. The two latt

    Jan 1, 1963