Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Hydrotransportation of Raw Coal from Pit Face to WashplantBy Crawford J
The paper asks the question 'Why Limit the HYDROTRANSPORT of material to the confines of your washplant'.A brief historical review of widely accepted slurry transport operation establishes t
Jan 1, 1992
-
Flotometric Analysis and Predictive Calculations for Industrial Flotation FlowsheetsBy Kavetsky A
A new model of flotation is presented which allows predictive calculations of total solids flows and metal grades and recoveries to be made for industrial flowsheets. A method of making these calculat
Jan 1, 1992
-
Recent Developments in Electrolyte Purification Practice at Copper Refineries Pty. Ltd.Over the last few years several important developments have taken place in the Electro- lyte Purification Plant at Copper Refineries Pty. Ltd. A fully automated system for the continuous removal of
Jan 1, 1974
-
Concepts for Estimating Ore Reserves and a Comparative View of Resource Estimation MethodsThe estimate of an ore reserve is a vital statement made about a mineral occurrence by an evaluator. It is important that such a statement communicate reality to all groups involved in a mining proj
Jan 1, 1987
-
Segregation of Grained Material - Conditions and Possibilities of EvaluationSegregation of granular material is a very common phenomenon. Realised in a forced manner it is a basis of all separation processes in mineral processing, mainly classification and beneficiation. Sp
Jan 1, 1993
-
Recent International Trends in Continuous GalvanisingThe paper will review the marked upsurge in the installation of new continuous metal coating lines, both hot dip and electrodeposition. Although some of this new capacity has been replacement for ob
Jan 1, 1993
-
Commissioning - From a Project Manager's ViewpointCommissioning is one of the many phases of a project, it has inter-dependencies with the other phases, as they have amongst themselves, and has its own terminology and distinctive features. Commis
Jan 1, 1986
-
Close Range Photogrammetric Mapping of Open Pit Mine Wall FailuresBy Campbell R
The use of a 35mm non-metric SLR camera and an analytical plotter to prepare close range photogrammetric (CRP) plans of a quarry and open pit mine face is described. The plans, at scales ranging from
Jan 1, 1990
-
Experience With Tyres And Tyre Chains On Underground Loaders At Kng Island ScheeliteEvaluation of tyre chains has been taking place at King Island Scheelite for several years. Results indicate that tyre life has been greatly improved in all cases. Good cost sav- ings are resulting
Jan 1, 1977
-
The Role of Geologists in Assessing and Quantifying Geological Uncertainty in the Conversion of Mineral Resources to Ore ReservesStandards in the public reporting of resources and reserves in Australia have dramatically improved since the implementation of the Australasian Code for Reporting of Mineral Resources and Ore Reserve
Jan 1, 2003
-
Resource and Geoscience Modelling for Exploration and Land Use Planning in NSW: The Mineral Resource AuditBy Barnes R. G, Agostini A, Lewis P. C
The Mineral Resources Audit is a five-year Program established to produce a comprehensive and objective assessment of the mineral resources of New South Wales, including prospective resources. The
Jan 1, 1995
-
Current Mining Practice At Cleveland Mine Of Abminco N. L.The Cleveland Mine has an annual ore production of 400,000 tonnes at a grade of 0.79 per cent tin and 0.30 per cent copper. It is achieved by an open stoping method, mechanised overhead sub-level b
Jan 1, 1977
-
Wear Rate Evaluation of Mill Lining and Grinding Media MaterialsBy Wingham DW
Based upon the previous work of Norman and Loeb, a method, was used, to assess-the comparative wearing properties of ten different alloys being used, or being considered for use, as mill liners and g
Jan 1, 1963
-
The Early Carboniferous Glenrock Group, Burdekin Basin, North Queensland: Basic To Acid Continental Volcanism and Epiclastic Facies of a Continental Margin Magmatic ArcBy Lockhart D. A, Gleeson P, Lang S. C
The Glenrock Group forms the uppermost part of the Early Devonian to Early Carboniferous Burdekin Basin sequence in the Townsville hinterland, north Queensland. As redefined, three formations make up
Jan 1, 1990
-
Database of TBM Projects Undertaken Between 1950 and 1990 and an Assessment of Associated Ground Strength LimitationsA review of all major TBM projects from 1974 to 1990 has been undertaken and the results entered into a database. A similar database was prepared from information obtained from a principal TBM manufac
Jan 1, 1993
-
Grinding Circuit Control and Product Size Inference using the In-Circuit CycloneThe control objectives and constraints for grinding circuits are ana- lysed, taking a single-stage ballmill-cyclone circuit as an example. The design of a hierarchical modular control system is descr
Jan 1, 1988
-
Process Selection and Design for the Palmarejo Silver MineSilver and gold bearing ore from the Palmarejo mine, located within the Mexican state of Chihuahua, contains a complex mix of electrum, native silver, silver sulfides and silver chlorides. This paper
Jan 1, 2009
-
"Widening Horizons" - Ninety Years OnBy P Benjamin, H Bohannan, C Farr
Geoffrey Blainey's historical account of the mining activity on the west coast of Tasmania, æThe Peaks of LyellÆ documents the changes over 130 years of activity in the region. Commissioned by th
Jan 1, 1998
-
A Mechanical Disintegrator for Slime SamplesON milling plants, where a large number of slime samples are collected each day, considerable work is involved preparing them for the assayer. The usual practice (as the material usually passes a 150-
Jan 1, 1922
-
Stope Performance at Olympic Dam MineBy M J. Pascoe
The performance of 460 stope surfaces at WMC ResourcesÆ Olympic Dam Operation (ODO) has been used to investigate the confidence that can be placed in the Stability Graph Method for design of stope dim
Jan 1, 2005