Intragraben Fault Zones, Volcanism, and Geothermal Evolution in the Oregon-Idaho Graben, U.S.A. (cb62322a-c63b-484d-a72f-a99e158b5dcc)The Oregon-Idaho graben evolved after widespread Uwleiitic flood basalt volcanism associated with the arrival of the plume head of the Yellowstone hotspot beneath southeastern Oregon approximately 17
Jan 1, 1995
-
Design and Optimisation of Cadia Hill Open Pit, Cadia Valley Operations, Newcrest Mining LimitedBy F Pothitos, S Hewson
The geological and geotechnical conditions at the Cadia Hill Open Pit are very complex. This complexity coupled with high mining rates has required significant technical input into the design and opti
Jan 1, 2003
-
Coal for Electricity Generation in South AustraliaThe known coal resources of South Australia are either of poor quality, or expensive to extract, or both. Export quality coal occurs only at great depth in the remote north of the State; the balan
Jan 1, 1987
-
A Method of Predicting Open Cast Backfill Settlement as Applied to an Open Cast Coal Operation in the UKBy Denby B
The ever increasing demand on land use has led to large areas of land being considered for development, which because of past mining activities are covered by substantial depths of fill materials. T
Jan 1, 1995
-
Ore Block Optimisation for Open Pit Grade ControlBy M B. McKevitt, W J. Shaw
The main task of grade control on a daily basis is to define the material that should be mined to a destination under various categories. This can be determined by grade, lithology, quality and blendi
Jan 1, 2009
-
Dartbrook Mine- Greenfield Opportunities in the Upper Hunter ValleyDartbrook mine is a new greenfields thermal coal longwall mine located n the Upper Hunter Valley ten kilometres north of Muswellbrook Figure 1). Construction began in April 1993 with coal extraction
Jan 1, 1995
-
A New Approach for Prediction of Blast Induced Coal FragmentationBy Thornton D, Esterle J, La Rosa D
Control of blast fragmentation has a significant impact on coal mine profitability. Two approaches for the characterisation of coal blastability, particularly in terms of fines, are presented. Both
Jan 1, 1998
-
Why do Shareholders and Mining Executives Allow Mine Managers to Leave Behind High-Grade Broken Ore Underground?By K Biegaj
The paper describes challenges the author has encountered on Australian underground gold and nickel mines over the last eight years, when recovering high-grade gold/nickel bearing mine floor material
Mar 26, 2012
-
Major Mining and Civil Projects - A Southern African PerspectiveThis paper cites selected, prominent examples of current, major projects in Southern Africa in both the mining and civil fields. Differences and similarities in the life cycle of mining and civil proj
Jan 1, 1999
-
The Measurement of Rock Stress at Depth from Small diameter Surface Drill HolesA review is presented of techniques cur- rently in use, or being developed, to enable the determination of virgin rock stress at consid- erable depth (> 1000 m) from small diameter sur- face drill ho
Jan 1, 1975
-
A Simple Finite Element Model for Predicting the Behaviour of Hydraulically Powered Coalmine SupportsBy Olden WH
A scheme is presented whereby the complexities of design and operation of a hydraulically powered coalmine support are modelled using the finite element method. This enables predictions to be made o
Jan 1, 1992
-
GRUBE-M - A Planning and Information System for Underground Mining EquipmentBy Hunefeld R
In the field of mining engineering, design and planning are complex tasks, which require the knowledge of various engineering disciplines. GRUBE (Graphisch-RechnerUnterstiitzter BergwerksEntwurf) is
Jan 1, 1995
-
Sampling and Measurement - The Foundation of Accurate Metallurgical AccountingMining companies around the world devote considerable effort to production reconciliation and metallurgical accounting. However, although sampling, weighing and analysis methods used to obtain the raw
Jan 1, 2002
-
Optimization of Bench blast Design with the Aid of ComputerA new bench blast design method and its realization with the assistance of the computer is introduced. The basic design principle is to define a rhomb cell, called fully- fractured zone, through a s
Jan 1, 1992
-
Microseismic Monitoring for Gas Outbursts at Leichhardt CollieryBy Ahmed M, Leung L
A program of microseismic noise monitor ing for gas outbursts, in conjunction with other mining engineering measurements and observations, is being undertaken at Leichhardt colliery in Queensland.
Jan 1, 1980
-
A History of Drill Consumable Control at Renison MineBy Davison GR
The cost of drilling consumables is always a large component of any mine budget. It is important that this cost be carefully examined with a view to reducing the overall cost per inetre or at least mi
Jan 1, 1985
-
The Economic and Operational Implications of Blast Vibration LimitsBy Chitombo GP
The proposed guidelines on vibration limits that have been circulated by the Australian Environmental Council, demonstrate the need for an extensive data collection and evaluation program to avoid
Jan 1, 1987
-
A Methodological Approach Towards a Global Environmental Impact Assessment of Acid Mine Drainage Using Copper Mining Processes as an ExampleBy M Ruhrberg, J Grassmann, C Bauer
Within the context of acid mine drainage (AMD) associated with mining activities worldwide there has been a tremendous research effort to determine the extent of AMD and assess the influencing factors
Jan 1, 2003
-
Base and Metal Mineralisation in the Gympie Composite TerraneBy Robertson A. D C, Cranfield L. C, Murray C. G
Most base and precious metal mineralisation in the Gympie Province is genetically linked to intrusion of branitoids of Late Permian to Late Triassic age. Most lodes are hydrothermal quartz and quartz-
Jan 1, 1990
-
An Integrated Optimisation Study of the Barrick Osborne Concentrator: Part B - FlotationBy T Gibbons, M Korte, C Brent, K Runge
The Barrick Osborne concentrator has gone through a number of upgrades since commissioning and steadily increased production from the original 119 t/h design capacity to 265 t/h milling throughput in
Jan 1, 2009