Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Volume and Structural Changes Occuring During the Isothermal and Non-Isothermal Reduction of High Grade Hematite Pellets

    By Morrison AL

    The volume changes occurring during the reduction by hydrogen of single, high-grade hematite pellets under isothermal and non- isothermal conditions were investigated using a time-lapse photographi

    Jan 1, 1980

  • AUSIMM
    A review of floor heave mechanisms in underground coal mine roadways

    By H Ramandi, H Masoumi, I Canbulat, B Hebblewhite, J Oh, S Saydam, W Timms, S Mo

    This paper reviews the floor heave mechanisms in underground coal mine roadways. Previous studies have reported three main failure mechanisms: bearing capacity failure, buckling and swelling. The buck

    Nov 30, 2018

  • AUSIMM
    The Application of Rock Stress Inputs to Stability Assessments at Ok Tedi Mine, Papua New Guinea

    By K W. Mills, N R. P Baczynski, J Mylvaganam, D A. Prado, M F. Lee, I A. de Bruyn

    "This paper presents the second part of a study of the assessment of rock stress inputs on the performance of various new mining designs at the Ok Tedi large open pit mine in Papua New Guinea. Over th

    Nov 5, 2014

  • AUSIMM
    Methods of Restoring New Zealand Native Forests after Mining

    By C Ross

    This paper uses the results of research trials by Landcare Research and Forest Research Institute and assessments of reclamation plantings at mines and other drastically disturbed sites to describe me

    Jan 1, 1995

  • AUSIMM
    Technical Considerations of Public Listing and Ongoing Compliance for Minerals Companies

    By P Stephenson, G Mosher, M Berry, C Arnold, P Stoker

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Globally, private minerals companies considering the transition to a public company and ent

    Mar 18, 2015

  • AUSIMM
    The Wakamarina Gold-Scheelite-Quartz Lodes, Marlborough, New Zealand (9bf77519-b580-47e8-9eb8-9b83d23a66f7)

    By Brathwaite RL

    The gold-scheelite-quartz lodes of the Wakamarina valley were the most productive of the mesothermal gold-bear in the Marlborough Schist. Most of the production came from the Empire City and Golden Ba

    Jan 1, 1995

  • AUSIMM
    Pongkor Gold Mine (Indonesia) ù Changing From Traditional Handheld Cut and Fill to Mechanical Cut and Fill

    The Pongkor Gold Mine employs 678 staff. The mine is owned by the Indonesian state company PT Antam Tbk and is located 100 kilometres south west of Jakarta, in Java, Indonesia. Mine and infrastructure

    Jan 1, 2002

  • AUSIMM
    Analysis of Electrostatic Separation for Rutile Cleaning Duty Using a Plate Electrode Assisted High Tension Roll Separator

    Analysis of Electrostatic Separation for Rutile Cleaning Duty Using a Plate Electrode Assisted High Tension Roll Separator A plate assisted electrostatic high tension roll separator has been used for

    Sep 13, 2010

  • AUSIMM
    Driving the 1,480 Ft Level at the South Mine, Broken Hill

    A drive, 3,500 ft long, was planned to explore mineralization exposed by diamond drilling. A rate of advance of 150 ft per fortnight, approximately double previous Broken Hill rates, was required. Sub

    Jan 1, 1965

  • AUSIMM
    The Future for Ilmenite Beneficiation Technologies

    By R K. A Taylor

    The growth in production of beneficiated ilmenite products has been one of the most significant trends in the titanium feedstock industry over the past 30 years. In this period, the production of tita

    Jan 1, 2001

  • AUSIMM
    The Effect of Weak Acid Dissociable Cyanide on Gold and Silver Flotation in Hidden Valley Mine

    By Y Peng, B Guo

    In gold processing plants, the water from the cyanidation stages is treated to detoxify cyanide species and this recycle water becomes the main part of the process water. Despite the low concentration

    Sep 26, 2013

  • AUSIMM
    Performance of the Coal Mine Openings and Pillars in Anisotropic Stress Field

    The stability of parallel underground coal mine galleries and pillars have been investigated using two- and three-dimensional (3D) numerical stress analysis. Anisotropic horizontal in situ stresses an

    Dec 6, 2010

  • AUSIMM
    Vibration Reduction to Presere the Integrity of an Aboriginal Rock Shelter Near Blast Operations

    By D P. Blair

    Rio Tinto’s Hope Downs Operations are currently mining iron ore in their South Central Pit. Prior to the commencement of mine operations, Hope Downs carried out an extensive archaeological investigati

    Nov 8, 2011

  • AUSIMM
    Utilization of algae as a sole nutrient for microorganisms biodegrading manganese dioxide

    By Madgwick J. C

    Powders prepared from the algae Gracilaria secundata, Ulva lactuca and Ecklonia radiatawere shown to provide sole nutritional support for microbial, microaerobic, biodegradation of low-grade manganese

    Jan 1, 1987

  • AUSIMM
    Hydrothermal Alteration of the Oblaga Cu-Au Skarn Deposit and the Oblaga Porphyry Cu-Au Prospect, Inner Mongolia, China

    By D Mnller, J L. Mauk

    The Oblaga Cu-Au skarn deposit and porphyry prospect is located in the south-eastern edge of the Gobi Desert in western Inner Mongolia. The deposit occurs within metamorphosed middle Paleozoic volcani

    Jan 1, 2005

  • AUSIMM
    Modelling of Multiple Narrow Veins from Geology to Mining - the Tasmania Reef, Beaconsfield, Tasmania

    By P B. Hills

    This paper discusses the computerisation of the drill hole database, some historical records and the creation of a three-dimensional model of the gold bearing structures for resource estimation and mi

    Jan 1, 1999

  • AUSIMM
    Determination of Low Concentrations of Tin in Ores

    By Alvin J. F

    Tin in ores containing 0·025 to 1·5 per cent tin can be determined polarographically by the reduction of the chlorostannite ion at the dropping mercury electrode in 2M hydrochloric acid solu

    Jan 1, 1962

  • AUSIMM
    Uncertainty - An Important Source of (Additional) Value for Mine Projects

    By S Watson, L Martinez

    Mine projects are complex opportunities that demand a constant assessment of uncertainty, ie risk and upside potential. This is because the value of a mine project is typically influenced by many unde

    May 24, 2012

  • AUSIMM
    Unlocking Plant Capability through Targeted Debottlenecking of Arrium’s Magnetite Concentrator

    By C Jenkins, M Mativenga, C Stanton, J Gerber

    In 2014, Arrium completed an optimisation program on its magnetite concentrator, enabling a reduction in the overall cost base of producing concentrate through an increased ability to treat a wider ra

    Jul 13, 2015

  • AUSIMM
    The integration of mine-to-mill and grade engineering at Anglo American’s Los Bronces Mine using IES

    By J Rutter, E Amini, D La Rosa, N Beaton, M Scott, F Faramarz, L Keeney

    Anglo American’s Los Bronces copper mine in Chile has been conducting detailed assessments investigating value adding options for their asset. The mine has conducted several detailed Mine-to- Mill and

    Nov 10, 2020