  • AUSIMM
    Assessment of the Impact of Non-Additivity in the Estimation of Iron Ore Attributes

    By A J. Cornah

    Critical decisions in iron ore project evaluation and production are based on global and local spatial estimates of primary mineral deposit properties (such as in situ geochemical grades) and geometal

    Aug 12, 2013

  • NIOSH
    OFR-16-79 Evaluation Of Coal Deposits In The Narragansett Basin, Massachusetts And Rhode Island

    This report summarizes the results of the Narragansett Win Projec't's activities during the U.S. Bureau of Mines (BOM) Phase 1, which was transitional from and which followed the National Sc

    Jan 1, 1979

  • AIME
    The Technique of Powder Metallurgy

    By Charles Hardy

    ?POWDER METALLURGY? is the production of semiformed or fully formed metal products by compressing metal powders. It had its beginnings in the fabrication of tungsten and molybdenum bars and wire by co

    Jan 1, 1936

  • TMS
    Injection Metallurgy for Continuous Copper Smelting and Converting - Fundamental Aspects of Mitsubishi Process –

    By Susumu Okabe, Etsuji Kimura

    "The Mitsubishi Continuous Copper Smelting and Converting Process is the typical applications of injection metallurgy to nonferrous metallurgical operation, where the top blowing multiple lance system

    Jan 1, 1996

  • SME
    Laboratory Assessment Of Rock Fragmentation Process By Continuous Miners – Preprint 97-172

    By V. B. Achanti, A. W. Khair

    Laboratory studies were carried out at West Virginia University to investigate the rock fragmentation mechanism by continuous miners using an automated rotary cutting simulator. The primary factors in

    Feb 24, 1997

  • NIOSH
    OFR-68-84 Improvement Of On-The-Job Training Procedures Through Utilization Of Modeling, Imitative And Other Learning Techniques

    By Paul E. Loustaunau

    This report describes a project in which three structured underground coal mine equipment operator training programs were developed. The project was carried out in two parts. In the first part, a rese

    Jan 1, 1983

  • ABM
    Aumento Do Rendimento De Turbina De Topo De Alto Forno Via Aplicação De Polimero Dispersante De Alto Estresse

    By Paulo Santiago

    Redução dos custos de operação e a produção de aço com menor impacto ambiental são diretrizes unânimes na siderurgia atual. A tecnologia das Turbinas de Recuperação de Topo (Top Recovery Turbines – TR

    Oct 30, 2017

  • SME
    CEET (Comminution Economic Evaluation Tool) (For Comminution Circuit Design And Production Planning)

    By G. Kosick, G. Dobby

    CEET, an acronym for Comminution Economic Evaluation Tool, was jointly developed by MinnovEX Technologies Inc. and 13 major mining companies for the purpose of designing and predicting the performance

    Jan 1, 2001

  • CIM
    Model-based control of column flotation: Toward industrial application and real-time optimization

    By André Desbiens, Jocelyn Bouchard, René del Villar

    "The metallurgical performance of the column flotation process is determined by the concentrate grade and recovery. Although the former can be continuously measured using an on-stream analyzer, the la

    Jan 1, 2003

  • NIOSH
    OFR-133(2)-81 Study Energy Absorption Characteristics Of A Pit Bottom Buffer - Vol. II

    By F. A. Penning

    An experimental and analytical investigation was conducted on a recoverable pit bottom buffer. Work was conducted at the Colorado School of Mines using the U.S. Bureau of Mine-s free fall test tower.

    Jan 1, 1980

  • NIOSH
    IC 6707 Methods And Costs Of Developing And Equipping The Ashley Gold Mine, Matachewan Gold District, Ontario - Introduction

    By W. H. Emens

    [This circular is one of a series dealing with tie development and equip¬ment of small and medium size mines, and with the costs of such work prior to productive operation. The preparation and publica

    Jan 1, 1933

  • CIM
    Modelling and Design of Undercarrage Components of Large-Scale Earthmoving equipment in Tarsand Operations Part I?Dozer Applications

    OBJECTIVES ??REDUCE OPERATING COSTS ??INCREASE LIFE COMPONENTS ??EXTEND LIFE of THE DOZER ??REDUCE MAINTENANCE COST ??REDUCE DOWNTIME ??IMPROVE DURABILITY & RELIABILITY ??IMPROVE BOLD JOINTS

    May 1, 2004

  • NIOSH
    RI 5394 Electrolytic Separation Studies Of Nickel And Cobalt From Nicaro-Plant Products ? Summary

    By M. J. Ferrante

    Laboratory-scale tests were undertaken to examine several electrolytes for possible use in separating nickel and cobalt from products being prepared at Nicaro, Cuba. The most extensive work was done w

    Jan 1, 1958

  • CIM
    A study of problems relating to mining engineering university education

    By C. Pelley, A. Piche

    "The Canadian mining industry faces the prospects of a severe shortage of graduate mining engineers over the next decade. This arises from three factors: first, a growth in industrial activity; second

    Jan 1, 1989

  • DFI
    Design Of Drilled Shafts Supporting Sound Walls

    By Ke Yang

    Drilled shafts are widely adopted as the foundation for sound walls. However, there has been a lack of uniformity in design and analysis methods and design criteria, in terms of factor of safety again

    Jan 1, 2007

  • AIME
    Reservoir Engineering – General - Variations in Permeability and Porosity of Synthetic Oil Reservoir Rock-Methods of Control

    By L. J. Health

    Synthetic rock with predictable porosity and permeability has been Prepared from mixtures of sand, cement and water. Three series of mixes were investigated primarily for the relation between porosity

    Jan 1, 1966

  • SAIMM
    New Slope Stability Considerations For Deep Open Pit Mines

    There has been disappointingly little development in the analysis of rock slopes in open pit mines over the past 30 years. A brief review of literature shows that the application of numerical stress a

    Jan 1, 2003

  • CIM
    Folding And Faulting of the Wabana Ore Deposits

    By J. B. Gilliatt

    The discovery of ore at Wabana was quickly followed by the mining of the ore beds where they outcropped in the land areas. The third phase, as at present carried out, consists of extensive submarine o

    Jan 1, 1924

  • NIOSH
    OFR-56-79 Mining For Petroleum: Feasibility Study

    By John S. Hutchins

    Two potential modified in situ methods are described for recovering the 68% "unrecoverable" hydrocarbons in oil reservoirs. For the 300 billion barrels of conventional light crude a Drip Drainage syst

    Jan 1, 1978

  • DFI
    The Use Of Stone Columns On Settlement And Liquefaction Susceptible Soils

    By Ivan Jackson Madura

    The new Paradisus Coco Beach Resort in Rio Grande (PR) is located on an old swamp area, which has been filled with relatively clean to silty sands. The swampy deposits consists of organic silts, peat

    Jan 1, 2002