Search Documents

  • AUSIMM
    Precious Metal Mineralisation Associated with the Cretaceous Paparoa Metamorphic Core Complex, New Zealand

    Reconnaissance geochemical exploration in the vicinity of low angle detachment faults which bound the core of the Paparoa metamorphic core complex yielded Au up to 14 ppm, with 35% of greywacke, grani

    Jan 1, 1995

  • NIOSH
  • NIOSH
    RI 4594 Petroleum-Engineering Study Of The New Hope Oil Field Franklin County, Tex.

    By Charles B. Carpenter

    The New Hope field was selected for study by; Bureau of lanes engineers because many problems met by, the operators during development and operation were unique to petroleum-engineering experience. So

    Jan 1, 1949

  • AUSIMM
    Equipment Application to the Smaller Underground Mining Operations

    Mining companies in order to compete and succeed in being viable business propositions must look to the future and select mining methods which guarantee improved efficiency and productivity as well as

    Jan 1, 1990

  • RMCMI
    Perspectives on U.S. Energy Options

    National Energy Technology Laboratory ?Only DOE national lab dedicated to fossil energy -Fossil fuels provide 85% of U.S. energy supply ?One lab, five locations, one management structure ?1,200 F

    Jan 1, 2006

  • SAIMM
    Seismic Hazard In Western Australian Mines

    A Seismic Hazard Scale (SHS) has been developed to provide a practical seismic hazard assessment tool applicable to mine site personnel. It has been applied to seismic data sets from numerous Western

    Jan 1, 2004

  • SME
    Soil Deformation Analysis During TBM Excavation: Comparing Three Different TBM Technologies Used During the Construction of the Toulouse Metro Line B

    By Richard Kastner, Emilie Vanoudheusden, Fabrice Emeriault, Jacques Robert

    INTRODUCTION The subway line B of Toulouse (France) has been realized with three different tunnel boring machines (TBM) techniques: Contracts 2 and 5 are excavated with earth-pressure balanced TBM

    Jan 1, 2007

  • NIOSH
    IC 6688 Cut-And-Fill Stoping ? Introduction And Acknowledgments

    By C. H. Johnson

    This paper on the out-and-fill method of mining is one of a series on mining methods published by the United States Bureau of Mines. It has been compiled chiefly from recent publications of the bureau

    Jan 1, 1933

  • NIOSH
    RI 3824 Determination of Metallic Iron & Oxygen- Sponge Iron

    By J. P. Morris

    "INTRODUCTION In the investigation being conducted by the Bureau of Mines concerning the production and utilization of sponge iron, it soon became evident that more information was needed regarding me

    Sep 1, 1945

  • NIOSH
    IC 6857 Review Of Literature On Effects Of Breathing Dusts With Special Reference To Silicosis - Part III-A - Chapter 5. Economic And Legal Aspects Of Dust Disease In Industry (Sections 1 And 2)

    By D. Harrington

    This circular presents Part III-A of a series reviewing the literature on effects of breathing dusts with special reference to silicosis; it deals with the economic and legal aspects of dust diseases

    Jan 1, 1935

  • NIOSH
    RI 4375 Missouri Valley Manganese Deposits. South Dakota Part I. - General Investigations, Stratigraphic Studies, And Tonnage And Grade Estimates

    By Paul. E. Pesonen

    Since early in 1940 the Bureau of Mines has been concerned with possible means of utilizing manganese-bearing materials from the Missouri Valley manganese deposit. During the period between July 1945

    Jan 1, 1948

  • SME-ICGCM
    Analysis of Small-Scale Thrust Faults and Their Effect on Coal Mining in Southern West Virginia

    By Thomas Z. Jones

    Deep mining within the Sewell Coal member of the New River Formation in southern West Virginia has exposed several small-scale thrust faults and related features. The faults were en- countered in West

    Jan 1, 1986

  • DFI
    Drilled Shaft Difficulties and a Micropile Solution

    By Jeff Jackson, Paul Axtell, David Graham

    The Montana Department of Transportation recently awarded a contract to construct a replacement bridge across the Clark Fork River in Heron, MT. Both abutments and both intermediate bridge bents were

    Jan 1, 2018

  • AUSIMM
    Building the Unified Comminution Model

    Building the Unified Comminution Model The Unified Comminution Model (UCM) was formulated with the vision of bringing all comminution models onto a common base. The structure of the model relies on k

    Sep 13, 2010

  • SME
    Integration Of Operations And Underground Construction: Sound Transit University Link

    By John Sleavin

    As part of the Link Light Rail project in Seattle, WA, work was completed at the Pine Street Stub Tunnel (PSST) in early 2007 for the Central Link project. This tunnel was excavated using cut-and-cove

    Jan 1, 2010

  • AUSIMM
    Geological Mapping into the 21st Century: QMAP and GIS

    By I M. Turnbull

    QMAP (the Quarter Million Mapping Programme, 1:250 000 scale) is a geological mapping programme which will build a digital geological database of the whole country and publish maps and books to docume

    Jan 1, 1997

  • NIOSH
    IC 7266 Graphite - Natural And Manufactured ? Introduction

    By G. Richards Gwinn

    The mineral graphite, a form of carbon, has been known for hundreds of years, and, was first used commercially as a coloring agent. Its true identity, however, was not recognized until the end of the

    Jan 1, 1943

  • ABM
    Monitoramento de Aplicações no ambiente de Automação Industrial

    By Anderson Ayres Bittencourt

    O monitoramento de sistemas e ativos de automação sempre existiu de forma rudimentar e descentralizada. A análise desses dados tanto quanto sua obtenção é um desafio para as empresas atuais. Foi a par

    Oct 30, 2017

  • NIOSH
    Modeling Of Hand-Arm Vibration - Introduction

    By Akul Joshi, Ming C. Leu, Robert Guttenberg, Susan L. Murray

    The aerospace and automotive industries are facing a significant risk for cumulative trauma disorders from high-repetition, long-duration tasks. Additional risk factors such as shocks, vibrations and

    Jan 6, 2006

  • CIM
    Improving Double Bench Face Performance at the Ekati Diamond MineTM Site

    By Judy K. Todd

    Double benching has been utilized as an excavation technique in open pit mines for many years. This process involves drilling, blasting, and excavating the material for the design bench height. A seco

    May 1, 2002