    Simplified Pre-and Post-Processing Technique for Performing Finite-element Analyses of Deep Underground Mines (4c70a887-9438-4254-8d3e-3283730c59e0)

    By Marc T. Filigenzi

    Two of the major ground control safety issues confronting underground mine operations today are shaft pillar stability and the failure of rock around active mine openings. Failure of a mine shaft can

    Jan 1, 1997

  • SME-ICGCM
    The Application Of Underground In-Seam Seismic Methods (UISS) To Map The Coal Seam Structure Across Longwall Panels

    By Rene Rodriguez

    The initial results of our investigations on the applicability of geophysical exploration methods to map coal seam inclusions were summarized in a paper submitted at the Thirteenth Conference on Groun

    Jan 1, 1995

  • SME-ICGCM
    Automation Of A Progressive Failure Procedure For Analysis Of Underground Mine Pillar Designs

    By N. P. Kripakov

    The U.S. Bureau of Mines (USBM) is conducting research to develop a practical computer-based tool that will allow coal mine planners to anticipate rock mass behavior surrounding mine entries prior to

    Jan 1, 1994

  • SME-ICGCM
    A Cooperative Study Of Gate Entry Designs Welbeck Colliery (UK) And Jim Walter Resources (USA)

    By Greg Hendon

    Longwall developments in the UK have historically consisted of single entry gate roads. Adjacent developments were separated from existing panels by large barrier pillars (designed of sufficient width

    Jan 1, 1995

  • SME-ICGCM
    Enhanced Surface Control For Roof And Rib Support (8fec630d-2a24-4d9d-8993-15ef5bf95858)

    By Stephen C. Tadolini

    The risk of injury caused by minor roof falls continues to increase in underground mining. Most ground control injuries result from small rock falls that occur in a supported area, but do not involve

    Jan 1, 2001

  • SME-ICGCM
    The Duncan Method of Partial Pillar Extraction at Tasman Mine

    By Kent D. Mctyer

    Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro

    Jan 1, 2011

  • SME-ICGCM
    Analysis on the Dynamics of Mining Subsidence in Range of a Product Transmission Overhead Line

    By Axel Preusse

    A high advance rate of the longwall face increases inevitably the mining dynamics within the rock and on the surface. Measures to limit the mining dynamics are the adjustment of the face advance rate

    Jan 1, 2003

  • SME-ICGCM
    Ground Control Techniques Utilizing Polymer Grid Structures (6a308b5b-e28a-436d-9aed-f102a6943d1b)

    By Brian E. Travis

    Lightweight polymer grids have recently been introduced to the mining industry. They are currently being used for roof and rib control, longwall shield recovery, safety guarding or barricade, highwall

    Jan 1, 1992

  • SME-ICGCM
    Research on Mine Pessure Behaviors and Overlying Strata Movement Laws in Solid Backfill Mining Methods

    By Shengli Yang

    Solid backfill mining, as a green mining technology, has the advantages of a higher resource recovery, less damage to the environment and the ability to dispose of waste underground. It has been appli

    Jan 1, 2011

  • SME-ICGCM
    The Use Of Cribless Tailgates In Longwall Extraction

    By Russell Frith

    The paper defines the various operational advantages associated with the use of cribless tailgates during longwall extraction and considers the associated ground control issues that need evaluating to

    Jan 1, 2000

  • SME-ICGCM
    Evaluation Of Low-Coal ATRS Systems

    By M. Terry Hoch

    This paper presents information on low-coal ATRS systems that are now in use. A study was conducted consisting of an in-mine evaluation of ATRS- equipped roof bolters capable of bolting in seams below

    Jan 1, 1988

  • SME-ICGCM
    State Of The Art Testing Of Powered Roof Supports

    By Robert C. Garson

    The Mine Roof Simulator at the DOE'S Mining Equipment Test Facility is described. Its use in the research and development on the behavior and response of longwall roof supports to simulated mine

    Jan 1, 1982

  • SME-ICGCM
    A Rock Mass Strength Concept For Coal Seams

    By George S. Kalamaras

    Coal strata strength is included as a vague term in most of the pillar design formulas, either as a questionable fraction of the intact coal strength or a size-dependent relationship for scaling down

    Jan 1, 1993

  • SME-ICGCM
    Directional Rock Bolt Pullout Tests as Index Tests for Estimating Rock Mass Quality

    By Michael Alber

    Pullout tests on resin grouted rock bolts have been executed in coal mines and surface test sites. The goal of this study was to provide some qualitative information about the rock mass quality from m

    Jan 1, 2003

  • SME-ICGCM
    Variation In The Load Transfer Of Fully Encapsulated Rockbolts

    By Paul Hagan

    A diverse range of rockbolt designs and resin anchors are available for use in underground mines. Despite their wide spread use, the factors that affect the performance a rockbolt is not fully underst

    Jan 1, 2004

  • SME-ICGCM
    A Study Of Longwall Subsidence In The Appalachian Coal Region Using Field Measurements And Computer Modeling Techniques

    By M. Karmis

    For several centuries surface subsidence has been recognized as an inevitable consequence of most underground mining. In fact, British court records of disputes and litigations related to property dam

    Jan 1, 1981

  • SME-ICGCM
    Investigation of Seismicity Near Appin, NSW, and its Association With Mining, Geology, and Tectonics

    By Vasundhara

    A chance detection of a seismic event of unexplained origin in the mining district of Appin in New South Wales. Australia, led to a detailed investigation of recording and analyzing seismic events occ

    Jan 1, 2001

  • SME-ICGCM
    Application Of Polyurethane Injection For Rehabilitation Of The Maingate Of A Deep Single Entry Longwall Mine

    By Kevin MacPherson

    After 34km of roof bolted drivage the first fall of ground occurred at the Phalen Colliery in the maingate of the 8th East longwall panel. The fall occurred over the stage loader as the wall approache

    Jan 1, 1999

  • SME-ICGCM
    Axial Performance of a Modified Fully Grouted Cable Bolt Tested with a New Laboratory Short Encapsulation Pull Test

    By Paul C. Hagan, Jianhang Chen, Serkan Saydam

    "Modified cable bolts are commonly used in underground mines due to their superior performance in preventing bed separation when compared with plain strands. To better test the axial performance of a

    Jan 1, 2015

  • SME-ICGCM
    Design And Planning Of Lower Seam Longwall Gateroads

    Case study data were analyzed to develop and quantify empirical stress transfer relationships between seams for both longwall and room and pillar mines. Layering in the innerburden and the distance be

    Jan 1, 1995