Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Endogeno.us Distribution of Mi110r Elements In the Goosly- Owen Lake Area of Central British Columbia

    By B. N. Church, J. J. Barakso, A. F. Bowman

    "An evaluation of mineralization in the Goosly- Owen Lake area of central British Columbia is the result of a comprehensive geochemical study of rock samples obtained from a regional geological survey

    Jan 1, 1976

  • CIM
    The Polaris Process Barge (413f976a-6a5f-4235-9531-1db4119721bb)

    By J. K. Gowans

    "INTRODUCTIONTo bring a mining property into production in the Canadian High Arctic a company must deal with the harsh environment, the short shipping season and the high cost of labour. In trying to

    Jan 1, 1983

  • CIM
    Use of the Enviro-Clear Thickener at Quirke Mill

    By H. Ewaschuk

    "INTRODUCTIONRio Algom's involvement with the Enviro-Clear thickener began in May 1975, when tests on a laboratory waif were carried out by our Research and Development group. Commencing in June, furt

    Jan 1, 1977

  • CIM
    Mill Speed Control for More Efficient Grinding

    By V. K. Gupta

    "Effect of mill speed on grinding kinetics has been investigated with a view to using mill speed as a manipulated variable for control and optimization of the grinding circuit performance under variab

    Jan 1, 1985

  • CIM
    Reduction in Dolomite Contamination in Pine Point Zinc Concentrate

    By D. A. Cormode

    "INTRODUCTIONPine Point Mines, operated by Cominco Ltd., is located approximately 55 miles east of Hay River, N.W.T. by the southern shore of Great Slave Lake.The milling operation commenced in the fa

    Jan 1, 1977

  • CIM
    Evaluation of Phospho-Gypsum for Gypsum Products Manufacture

    By R. K. Collings

    "This paper summarizes research that was done at the Mines Branch, Ottawa, to evaluate samples of phosphogypsum for gypsum products manufacture. The samples were from phosphate fertilizer facilities a

    Jan 1, 1972

  • CIM
    Dust Collection Methods for Primary and Secondary Crushing (NOVEMBER 21, 1975 )

    By D. Ingram

    "PRIMARY DUST COLLECTOR A. 42,000 CFM James Howden Fan Z-6 Size 3650 Fan Dia 40"" HP 75It was found that the fan was not large enough to remove the air that was displaced by the trucks dumping. So it

    Jan 1, 1976

  • CIM
    Underground Structures in Swelling Rocks

    By M. E. Bilir

    In this paper, we review cases in which dramatic and visual swelling problems are experienced in underground structures. Swelling rocks have caused many problems in underground engineering projects. T

    Aug 1, 2013

  • CIM
    Gold Deposits, Exploration Realities, and the Unsustainability of Very Large Gold Producers

    By H. R. Bullis

    "Abstract- This paper discusses what appears to be a flaw in the current belief, widely held within the gold mining industry and investment community, that the creation of ever-larger gold mining comp

    Jan 1, 2001

  • CIM
    Oiseau and Maskwa Copper and Copper-Nickel Deposits, Southeastern Manitoba

    By J. F. Wright

    During the last three years prospecting has been active in southeastern Manitoba and a number of interesting gold, nickel and copper deposits have been discovered within an area 90 miles north of the

    Jan 1, 1925

  • CIM
    Energy/GHG Management Assessment Using TSM Indicators

    By Lauri Gregg

    Key Message Energy focused Change Management Process that engages operations managers is the missing tool needed to build capacity for energy/GHG management

    May 1, 2007

  • CIM
    Particle Composition Distribution: Measurement and Prediction in Mineral Processing

    By G. Barbery

    "Particle composition distribution is an essential feature of materials processed by physical separation methods. The amenability to segregate a feed material in a concentrate and a tailings stream de

    Jan 1, 1986

  • CIM
    Mines Business Planning at the Vale Inco Ontario Operations

    By Richard Jundis

    At the Vale Inco Ontario Operations, the working environment is rapidly evolving with organizational changes, new business systems and software tools. These changes are required in order to meet today

    May 1, 2009

  • CIM
    The Use of Qemscan for Ore Characterization

    "The QEMSCAN system is the third generation of automated mineral analysis systems that began with the QEM*SEM at CSIRO 30 years ago (Butcher et al. 2000). It is now a successful commercial instrument

    Jan 1, 2012

  • CIM
    Stabilization of Arsenic in the Mining and Metallurgical Industries ? A Review

    By Sengpasith Houngaloune

    Arsenic, which is a toxic and carcinogenic element, causes serious environmental problems throughout the world. It is also known as a major contaminant in the non-ferrous mining and extractive metallu

    Aug 1, 2013

  • CIM
    Underground Operations at the Dome Mines

    By John B. Phillips

    The mine is entered by a central vertical shaft, strongly timbered, and containing two compartments-one for the passenger cage, the other for the large skips bringing the ore to the surface. A man-way

    Jan 1, 1926

  • CIM
    Supervisory Training and Management Development at the Iron Ore Company of Canada

    By P. Hickey

    "The object of this paper is to describe how the Iron Ore Company of Canada develops its management personnel. It will elaborate on the practical application of Supervisory Training and Management Dev

    Jan 1, 1983

  • CIM
    Biological Alkalinity Generation in Acid Mine Drainage

    By M. Kalin

    "Ecological Engineering and Biological Polishing technology is a decommissioning approach for inactive coal, uranium and base metal operations. To improve acid mine drainage water some fundamental asp

    Jan 1, 1991

  • CIM
    BIM For Facility Management: Design for Maintainability with BIM Tools

    By R. Liu

    As Building Information Modeling (BIM) becomes widely adopted by the construction industry, it holds undeveloped possibilities for supporting Facility Management (FM). Some FM information systems on t

    Aug 1, 2013

  • CIM
    The H. B. Concentrator

    By H. J. Chalmers

    THE H.B. MINE and concentrator are located in the Nelson Mining Division of British Columbia, on the north side of the Sheep Creek valley about seven miles southeast of the town of Salmo. It is an ope

    Jan 1, 1957