Search Documents

  • IIMP
    Gerenciamiento en la construcción de proyectos de sistemas de izaje Volcán Compañía Minera S. A. A.

    By Ernesto Zelaya P

    En el Perú, muchas de las empresas mineras se desarrollaron por la configuración de sus yacimientos explotados. Sin embargo, también se generaron limitaciones y restricciones en el transporte, extracc

    Sep 12, 2011

  • CIM
    Development of Geometallurgical Comminution Mapping and Modelling

    By Luke Keeney, Stephen Walters

    "The start up of a new mining and metallurgical facility is a crucial step in the life of any mining project. The mining industries record is poor when evaluating processing plant operation relative t

    Jan 1, 2009

  • SAIMM
    Steel Cleanliness And Hydrogen In Liquid Steel

    By R. Dekkers, J. Plessers

    The feasibility of using hydrogen to obtain clean steels is investigated. High hydrogen contents are generally considered as detrimental due to the risk of flakes, bubbles and breakouts during casting

    Jan 1, 2004

  • NIOSH
    Methane Control Research: Summary Of Results, 1964-80

    By Maurice Deul

    This bulletin summarizes the work conducted under the Bureau of Mines methane control research program during the years 1964 to 1979. This research effort was directed toward improving existing method

    Jan 1, 1986

  • AUSIMM
    Opportunities for the New Zealand Coal Industry

    Thank you for this opportunity to address your conference on 'The role of coal in the New Zealand energy market'. New Zealand's energy market has, in common with much of New Zealand, un

    Jan 1, 1990

  • IIMP
    Application of satellite imagry for slope failure risk studies

    By W. Greuer

    The objective of this paper is to demonstrate how site-specific slope stability analysis can be performed entirely from the desktop with satellite images, Geographic Information Systems (GIS), and slo

    Jul 17, 2000

  • AIME
    Producing-Equipment, Methods and Materials - Oil Production From Reservoirs With an Oil Layer Between Gas and Bottom Water in the Same Sand

    By J. van Lookeren

    In the case of a reservoir where the oil underlies a large gas cap and overlies bottom water, production can be inzproved considerably if wells are perforated below the water-oil contact rather than o

    Jan 1, 1966

  • SAIMM
    A study of metal droplet distributions in slags during ladle treatment phase of secondary steelmaking

    By J. Ekengård, H. Srinath, M. Andersson, P. Jönsson, D. S. Sarma

    The present paper deals with mixing between the metal and slag phase during the ladle refining process, including vacuum degassing. Dispersion of metal drops in ladle slags has been studied. The resul

    Jan 1, 2004

  • ISEE
    A Hydrodynamics-Based Approach for Predicting the Blast Damage Zone in Drifting as Demonstrated using Concrete Block Data

    "Rock falls involving a relatively small amount of material are a leading cause ofinjuries in underground mines in the United States. A contributing factor is unwantedblast damage and over-break. A go

    Jan 1, 2009

  • CIM
    Comminution Energy Efficiency – Understanding the Next Steps

    By Brandt Porter, Lawrence K. Nordell, Alexander Potapor

    "Improving comminution efficiencies with better machine geometries and motions, improved nip angles, rock movement control, and voids regulation among rocks are some of the next steps to better machin

    Jan 1, 2016

  • IOM3
    Framework for modelling of metallurgical processes

    By W. R. Paterson, W. Morton, D. B. Cameron

    The Massbal II computer simulation program has been used to develop a general framework for the building of thermochemical models of metallurgical processes. The framework allows the rapid, simple con

    Apr 1, 1991

  • ISEE
    Concrete Bridge Pier Removal in an Environmentally Sensitive River

    By Paul Kunze

    When a new bridge was needed across the upper reaches of the Yellowstone River in Montana, removing the old concrete bridge piers became an environmental concern for the highway department engineers.

    Jan 1, 2014

  • AUSIMM
    Nui Phao mine – flotation circuit upgrade

    By S Morgan, A Jakowetz, S Taylor, B Weekes, S Litson, P Bourke, T L. Do

    In the current tough mining environment with lower commodity prices, operators need to improve operational profitability. Optimised equipment asset management is a sustainable way to achieve this obje

    Sep 11, 2017

  • SAIMM
    Development of an Atmospheric Datamanagement System for Underground Coal Mines

    With increasing demand for real-time monitoring of mine parameters, the requirement for appropriate data management in many mining applications is also increasing. This includes atmospheric monitoring

    Jan 1, 2014

  • SAIMM
    Neural network performance versus network architecture for a quick stop training application

    The relationship between neural network (NN) performance and the parameters that form the architecture of the neural network is complicated. This paper studies an issue that is still controversial—the

    Jan 1, 2003

  • IOM3
    QTz curves for two skew distributions

    By A. Berckmans

    The key variables in the financial analysis of a mining project include the metal price and the quantities of ore and metal. In general, if the metal price drops, the cutoff grade is increased so as t

    Dec 1, 1996

  • SAIMM
    Applications Of Fibre-Reinforced Shotcrete (Fibrecrete) Support In Drifts At Nchanga Underground Mine.

    By Simon Mundike, Muwindwa Lipalile

    A scraper based block cave method has been successfully applied to extract the Lower Ore Body at Nchanga since the 1950?s. Since inception, scraper drifts and service ways have been supported using st

    Jan 1, 2005

  • CIM
    Optimization of the Damang Mine (f1135579-fc96-4b0b-98ae-1df94fee7413)

    By Dayang Datu Khalil, Charle Amoah, Fred Kock

    Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph whe

    Jan 1, 2012

  • AUSIMM
    Comparison of Discretised Population Balance (DPB) and Finite Element Method (FEM) Methodologies for Modelling Batch Gibbsite Precipitation

    Comparison of Discretised Population Balance (DPB) and Finite Element Method (FEM) Methodologies for Modelling Batch Gibbsite Precipitation

    Sep 13, 2010

  • NIOSH
    RI 7191 Mine Water Research - The Limestone Neutralization Process

    By E. A. Mihok

    A pilot plant for treating mine drainage by neutralization with limestone was designed, fabricated, and operated by the Bureau of Mines. The process consists of (1) producing a very fine (minus 400-me

    Jan 1, 1968