    The Effect Of The Mineralogy Of The Platinum Group Metals On Their Leachability During The Platsol ® Leach Process

    The mineralogy of the platinum group metals is fairly complex, and it is therefore not surprising that the different minerals have variable responses to metallurgical processes, in particular, flotati

    Jan 1, 2006

  • SME
    TARP — The Des Plaines Tunnel System (North Leg) A Case History

    By Robert Rautenberg, Paul McDermott

    This paper will discuss the construction of 15.9 km (9.88 mi) of tunnels on a project in Chicago, Illinois. The tunnels were driven utilizing two rock and four soft ground TBMs ranging in sizes from 7

    Jan 1, 1997

  • CIM
    A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining

    By Jiwen Zhang

    Abstract Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queu

    Oct 1, 2009

  • CIM
    A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining

    By Jiwen Zhang

    Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queuing networ

    Oct 1, 2009

  • AUSIMM
    Pumping Machinery for Mines, with Special Reference to the Plant at the Waihi Mine, N.Z.

    THE choice of a pumping plant for the drainage of a mine is a matter of such importance that it is obvious that in a short paper it is impossible to go fully into the reasons governing the adoption of

    Jan 1, 1912

  • SME
    Development described for fluidized bed combustion at TVA’s 20-MW pilot plant

    By James W. Bass

    Introduction Atmospheric fluidized bed combustion (AFBC) is an improvement over coal-fired boiler design. It offers several advantages over conventional boilers. AFBC can meet sulfur and nitrogen oxi

    Jan 4, 1986

  • SME-ICGCM
    The Use Of Foamed Cement Cribs At American Electric Power Fuel Supply Meigs Division

    By Michael Amick

    Due to the importance of maintaining open airways on a longwall panel, mine management decided to install cribs made of foamed cement. Foamed cement had been used at other company operations on severa

    Jan 1, 1993

  • SME
    Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base Tunnel

    By Michael Rehbock-Sander

    The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked

    Jan 1, 2012

  • IIMP
    Minería responsable en zona de amortiguamiento de áreas naturales protegidas: caso de Poderosa en Parque Nacional Río Abiseo

    By José Calderón

    Poderosa tiene sus concesiones en las provincias de Pataz y Bolívar en la región La Libertad y son parte de la zona de amortiguamiento (ZA) del parque nacional Río Abiseo (PNRA) y de la zona de transi

    May 22, 2019

  • SAIMM
    Mining Complex Geology, Mitigation of Float Dust, and Developing Autonomous Machine Capability Using Horizon Sensing Technology for Coal Seam Boundary Detection

    By L. G. Stolarczyk, J. Duncan

    "SynopsisLong before the environmental movement, coal miners were suffering from occupational diseases that became apparent in the later years of service, and especially during the retirement years. C

    Jan 1, 2015

  • SAIMM
    Plan compliance process for underground coal mines - Synopsis

    By A. A. Angelov

    This paper presents a unique method of monitoring the effectiveness of the planning process as well as the execution of mine plans. The method primarily determines the degree of deviation from the ori

    Jan 1, 2010

  • AUSIMM
    Cave Mining at Premier Diamond Mine

    By A Croll

    A panel cave using LHDs for ore extraction came into production at Premier in 1990 at a depth of 630 metres below surface on the western side of the mine in the BA5 mining block. A post-undercut minin

    Jan 1, 2000

  • IOM3
    Comparison of indicator and ordinary kriging in assessment of in-situ coal quality in a Turkish mine

    By A. E. Tercan, D. Mamurekli

    Ordinary kriging on the assumption of a gaussian error distribution and indicator kriging were used to derive the probability that a given calorific value would or would not be exceeded by coal from a

    Jun 19, 1905

  • SAIMM
    Re-aligning the cutting sequence with general support work and drafting a support sequence at Simunye Shaft

    By K. Lombard

    "‘Roof support awaiting time’ (RSAT) is a term used at Goedehoop Colliery’s Simunye Shaft to describe the potential production time lost due to the continuous miner (CM) standing idle waiting for roof

    Jan 1, 2015

  • SME
    Tough Times Not Enough To Deter More Than 2,200 From Northwest Mining Meeting

    Amid some of the worst economic conditions that the mining industry has been faced with in more than a decade, the mood among the large crowd at the 114th Annual Northwest Mining Association?s annual

    Jan 1, 2009

  • AUSIMM
    Flotation Research on Cassiterite of Tailings

    Flotation Research on Cassiterite of Tailings

    Sep 13, 2010

  • SME
    New Frontiers in Mining: Meeting 21st Century Challenges – Theme of SME Annual Meeting 2022

    By Tim O’Neil

    Nearly 4,800 mining professionals and exhibitors occupying 580 booths attended the 2000 SME Annual Meeting and Exhibit, Feb. 28-March 1, in Salt Lake City, UT. The technical program included80 sessio

    Jan 1, 2000

  • AUSIMM
    A Single Compartment Cell for the Electrolytic Production of Aluminium from Molten Chlorides

    A single compartment 100 A electrolytic cell charged with AICla-KCl-NaCl at 750°C was studied during an experimental campaign of 4 months. About 10 1b of aluminium were produced in continuous run

    Jan 1, 1971

  • TMS
    Metallic Wires Elaboration Directly From Thin Liquid Jets

    By Ludovic Charpentier

    Production of metallic wires directly from liquid jets would avoid drawbacks of extrusion (space needed, damaging, cost?) and enable recycling. But liquid jets tend to break, due to capillary instabil

    Jan 1, 2006

  • NIOSH
    An Alarm To Warn Of Overhead Power Line Contact By Mobile Equipment

    By J. C. Cawley, G. T. Homce, M. R. Yenchek, H. K. Sacks

    As in many other industries, such as construction and agriculture, overhead electric power lines are a serious hazard at mining and mining-related operations. Even when excluding injuries that occur