Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Thermodynamic Modeling Of Desilversing Of Lead Bullion By Zinc During Lead RefiningBy Pengfu Tan
A thermodynamic model has been developed to model the desilverising process of lead by the addition of zinc during lead refining, whereby silver-zinc solid solutions are formed, and floats out of the
Jan 1, 2005
-
25 Story Structure On River Flood Plain Soils Improved By Vibrocompaction And Compaction GroutingBy Frank Callanan
The Ameristar Casino expansion project included the design and construction of a 25-story hotel and 9-story parking structure expansion. The site is located in a floodplain on the banks of the Missour
Jan 1, 2009
-
Minerals Education Through The National Science Teachers Association Meetings: The Past And The FutureBy J. N. Murphy
The use of the National Science Teachers Association (NSTA) regional meetings as a forum to educate teachers on the role of minerals in our society has been immeasurably successful. Each year, on ave
Jan 1, 2001
-
List Of DelegatesAUSTRALIA CHAPMAN Gary JOHN WAGSTAFF CONTSRUCTIONS PTY. LTD. 1 Ashgrove Crescent 4060 ASHGROVE BRISBANE HILLAR Jaaes Director J.A. HILLAR & ASSOCIATES 99 Woolwich Road WOOLWICH,
Jan 1, 1994
-
Investigating the Sensitivity of Different Estimation Techniques over Block DimensionsIt cannot be said that accurate and reliable ore reserve estimation is the fundamental of any mining operation success. Estimation techniques which are used to estimate the grade distribution of an or
Dec 6, 2010
-
Introduction To Nuasahi Chromite Mine ? An Under Ground Chromite MineBy Vinay Kumar Agrawal, Rama Nath Praharaj
IMFA Group is the largest producer of Charge chrome not only in India but also in Asia. This Group has plants situated at Therubali and at Choudwar. They also have a Thermal power plant at Choudwar wh
Jan 1, 2007
-
Approximating diamond drill rod wearBy R. Laplante, P. Radziszewski, P. De Ciccio
"Predicting the effect of wear can lead to improved control strategies that can possibly minimize the risk of catastrophic failure due to wear while maximizing useable life. In the field of geological
Jan 1, 2002
-
Remote Monitoring of Mine Seismicity and Earthquakes Using Radio Telemetry, Computers, and the InternetBy D. Denton, M. Stickney, R. Langston
The National Institute for Occupational Safety and Health and the Stillwater Mining Company worked cooperatively with the Montana Bureau of Mines and Geology to develop a system that would collect sei
-
Applications of fracture mechanics in failure analysis case studiesBy M. N. Bassim, W. W. Tennese
"Concepts of linear elastic fracture mechanics were applied to study two cases of failure, namely an equalizing beam from a tandem rear axle of a highway tractor unit and the main beam of a flat bed t
Jan 1, 1985
-
Method To Evaluate Liberation Characteristics Of Feed In A Jigging PlantBy A. K. Mukherjee
The roles of pulsating mechanisms such as the amplitude and frequency of the jig cycle are well established in jigging. Also well established are the roles of the size ratio and the volume fraction of
Jan 1, 2008
-
Portable Continuous Velocity of Detonation SystemsBy Jackson R. Pressley, M L. Hopkins, R E. Danell, N T. Moxon, Andrew Bowman
Efficient and cost effective blasting is achieved by closely matching the explosive energy to the strength of the material in which it is being used. Although there are many empirical relationships wi
Jan 1, 1991
-
Testing for the Selection of Comminution Circuits to Prepare Concentration Feed (a815d937-44c4-4647-9f91-461932a0c73e)The selection of the best comminution circuit for the preparation of concentration feed is a compromise based on economics, energy efficiency, labour costs, steel consumption, availability and other f
Jan 1, 1984
-
Improved understanding of high pressure pre-grouting effects for tunnels in jointed rockBy N. Barton, E. Quadros
This paper addresses the prediction of groutable joint apertures, grout penetration limitations, and possible grout take volumes per cubic metre of rock, as a result of 5 to 10 MPa pre-injection press
Jan 1, 2003
-
Hong Kong Strategic Sewage Disposal Scheme Stage I—Deep TunnelsBy Will Foreman, Douglas D. McLearie, Edwin K. H. Tong, William H. Hansmire
Hong Kong’s Strategic Sewage Disposal Scheme (SSDS) Stage I involves the provision of a system of deep tunnels for transporting to a central treatment works wastewater collected from a number of catch
Jan 1, 2001
-
Dysfunction Junction: When Inalterable Rules Meet Evolving TechnologyBy Mark N. Savit
It is indeed a rarity for a non-engineer, let alone a lawyer, to even be considered for a mining-related award, especially where that award is for significant contributions to technical progress in th
Jan 1, 2008
-
Technical Note - Rapid Production of High Quality Polished Sections for Automated Image Analysis of MineralsBy Wittenberg J. C, Reid A. F
A method is described for the rapid and effective production of polished section mounts of ore and mineral particulates to the standards required for automated image analysis. This requires mounting w
Jan 1, 1984
-
Variations in regional geochemical patterns: effects of site selection and data-processing algorithmsBy J. D. Appleton, J. Ridgway, K. B. Greally
Paper presented at the 28th International Geological Congress held in Washington DC, July 1989 (International geochemical mapping sessions). The results suggest that meaningful geochemical maps can be
Jul 1, 1991
-
Manhattan Shaft, New York City Water Tunnel No. 3By Edward (Ted) M. Dowey
Shaft 26B of New York City’s Third Water Tunnel was constructed by Frontier-Kemper Constructors, Inc. of Evansville, Indiana. The 176.8 m (580 ft) deep shaft will serve as the construction shaft for t
Jan 1, 1997
-
Environmentally and Publicly Acceptable Options for Remediation at Tui Mine Site, Te ArohaBy J Webster-Brown
The Tui Mine is an abandoned Pb-Zn mine giving rise to water quality problems in the Te Aroha region of Coromandel, New Zealand. When sampled in September 2002, for example, both the Tui and Tunakohoi
Jan 1, 2003
-
San Vicente to 2nd Aqueduct Pipeline - Tunnel: Drill and Blast in Advance of an Open-Face Digger ShieldBy Brett Campbell
The San Vicente to 2nd Aqueduct Pipeline?Tunnel project is a raw water conveyance tunnel linking the San Vicente Reservoir (SVR) to the 2nd Aqueduct Pipeline via Rancho Penasquitos Pressure Control Fa
Jan 1, 2008