    Meeting The Coal Quality Challenge In The Expanding Powder River Basin Coal Marketplace

    Powder River Basin (PRB) mines were originally built to serve power plants designed specifically for their coal. Sulfur was the major concern, with BTU and sodium limiting the market for some. The Cle

    Jan 1, 1998

  • SME
    Economic Effects Of Urbanization On Mineral Aggregate Use

    By Leonard Bronitsky

    The construction mineral aggregates industry--the largest industry on a tonnage basis--is threatened with large shortages in the near future. Ironically, these common minerals which include sand, grav

    Jan 1, 1974

  • SME
    Radiotracer techniques in modeling continuous flotation processes

    By K. Verghese, H. M. Lee, R. P. Gardner, K. Boateng

    Results of work on the development of a phenomenological model for the continuous flotation process wing short-lived radioactive tracer techniques for determining model parameters is reported. A model

    Jan 1, 1987

  • SME
    Velocity - Clearance Curves For Mobile Mining Equipment

    By G. T. Lineberry

    Reduced clearance is one of the most important characteristics of encumbered space in underground coal mining. Another key variable is the maximum velocity at which a piece of mobile mining equipment

    Jan 1, 1983

  • SME
    MM, The Other Side Of Chuquicamata?

    By O. Alvarez-Campos

    Two porphyry copper orebodies, the North and Central MM orebodies, have been found through regional and structural geologic works, about 5 Km south of Chuquicamata, under a gravel bed of approximately

    Jan 1, 1993

  • SME
    Design Tools for Construction Engineering

    By Scott G. Britton

    Up to now, the hands-on approach to construction has been stressed. This chapter reviews the basic tools available for construction design and monitoring of a construction project. It is divided into

    Jan 1, 1983

  • SME
    Finite Elements And Strip Mining Equipment - Introduction

    By O. E. Wheeler

    The term "finite element analysis" is heard and seen in print a great deal these days; a few words on what precisely it is are in order. In the broadest sense, finite element analysis is an applicatio

    Jan 1, 1974

  • SME
    Development Of Mobile Crusher Plants To Large-Scale Installations With Throughputs Of More Than 3500 Tons Per Hour

    By Rainer Kahrger, Guenter Ewald

    The topic of this paper is to demonstrate the development of mobile crushing installations from throughput capacities of 200 tons per hour, to mobile and semi-mobile large- scale crushing installation

    Jan 1, 1989

  • SME
    Improvements In Crusher Control (50d9ae3a-4d5a-4f38-b5d7-94fcbeac9d33)

    By C. Ottergren

    A process does not have higher capacity than what can pass through its bottleneck. Acknowledging this, and with the goal to optimize production at a minimum investment, one can use existing equipment,

    Jan 1, 1999

  • SME
    Remediation Of The Abandoned Waste-Filled Marl Quarry Górka

    By Z. Kowalski

    In the non-operational ?Górka? quarry, there are situated both a waste disposal site of an area of 6.7 ha, containing approximately 1 million ton wastes from high aluminium content materials (incl. ab

    Jan 1, 2006

  • SME
    Project Payette Introduction And Background

    By Donald G. Dahle

    Project Payette is a conceptual nuclear experiment under the Vela Uniform program intended to further evaluate the mechanism of seismic decoupling. Vela Uniform is a Department of Defense program to i

    Jan 1, 1968

  • SME
    Operating Controls At Minntac Crushing Plant

    By Thomas J. Kingston

    A general overview of the taconite crushing process at Minntac is presented The process is controlled from a central control where the control room operator uses closed circuit TV, computer process co

    Jan 1, 1980

  • SME
    The Regional And Stratigraphical Context Of Zechstein 3 And 4 Potash Deposits In The British Sector Of The Southern North Sea And Adjoining Land Areas.

    By Denys B. Smith

    Electric logs and cuttings records from Zechstein 3 and 4 strata in boreholes in the British Sector of have been interpreted in the light of numerous cored boreholes through this sequence in north-eas

    Jan 1, 1978

  • SME
    An Integrated Size Reduction-Mineral Liberation Model

    By Ronald L. Wiegel

    Success has been achieved in developing mathematical models of rod mills, ball mills and recently to a limited extent autogenous grinding mills. There is also considerable activity in the development

    Jan 1, 1975

  • SME
    Pillar Recovery At Ozark Lead Company

    By Jack Bradbury

    The open stope room and pillar method of mining is used throughout Ozark Lead Company's underground mine located at Sweetwater, Missouri. This method of mining produces an approximate overall ore

    Jan 1, 1981

  • SME
    Video Sampling for Mine-to-Mill Performance Evaluation: Model Calibration and Simulation

    By J. A. Herbst, S. L. Blust

    Optimization of blasting, crushing, and grinding operations is filled with challenges. One of the more difficult tasks is accurately sampling and determining the size distributions of blasted and crus

    Jan 1, 2000

  • SME
    Openpit mine optimization with maximum satisfiability

    By Matthew Deutsch

    A common casualty of modern openpit mine optimization is the assurance that the resulting design is actually achievable. Optimized mine plans that consider value and a bare minimum of precedence const

  • SME
    Hydraulic Transportation Of Coal From Face To Preparation Plant - 1. Introduction

    By William N. Poundstone

    Since World War II, when off-track mining became popular, mining machinery has undergone much change. However, the change has been basically to make the machines more powerful, more productive and mor

    Jan 1, 1974

  • SME
    A Model to Predict the Performance of EPB-TBMs in a Complex Geology in Istanbul

    By Aydin Shaterpour Mamaghani, Cemal Balci, Nuh Bilgin, Mucahit Namli, Hanifi Copur

    "It is expected that more than 10 Billion USD will be spent in Istanbul in coming years on tunnel boring especially with EPB-TBMs. However, the geology of Istanbul is very complex. Geologic formations

    Jan 1, 2016

  • SME
    Government Regulation Of Subsidence Due To Underground Coal Mining And Its Impact On Future Subsidence Research - Background Of The Surface Mining Control And Reclamation Act And Federal Subsidence Control Regulation

    By C. Y. Chen

    In order to put an end to the uneven environmental standards and enforcement established by various coal mining States in the United States, the Congress passed and the President signed the Surface Mi