Reducing Blasting Damage By Expanding Delay Timing ? IntroductionBy R. D. Rein
The Henderson mine is a large continuous panel caving operation in central Colorado. The orebody is roughly 760 m by 910 m and will be extracted from two production levels. Each level is divided into
Jan 1, 1985
-
Technology News - Converting Methane To Utility Energy At Australian Coal MinesEnergy Developments Ltd. (EDL) has developed power plants at two Australian coal mines that featuring 94 gas-fueled Caterpillar G3516 engine/generator sets. They will convert to electricity 145 kt/a (
Jan 1, 1997
-
The Effect of Methyl Isobutyl Carbinol “MIBC” on the Froth Stability and Flotation Performance of Low‑Grade Phosphate Ore - Mining, Metallurgy & Exploration (2024)By Lana Alagha, Ashraf Alsafasfeh, Amal Al‑Hanaktah
As freshwater resources are becoming scarce, the use of seawater as replacement of fresh water is appealing in order to make mineral processing operations more sustainable. Since froth stability plays
Jan 17, 2024
-
Coal Conversion And Utilization R&D In ERDA ? IntroductionBy Raymond L. Zahradnik
Marco Polo reported that the Chinese used "black rocks" for fuel, and recent studies indicate that the Chinese may have used coal in small amounts for two or three millennia previously. The use of coa
Jan 1, 1975
-
Rapid Solution Of Kriging Equations Using A Banded Gauss Elimination AlgorithmBy J. R. Carr
A crucial concern when implementing computer algorithms for geostatistical analyses on microcomputers is speed of execution. Kriging, in particular, typically relies on a Gauss elimination algorithm t
Jan 1, 1990
-
Reinflation Testing Of Inflatable Friction Rock Bolts - SME Annual Meeting 2023By J. Hallowell, M. Conley, R. Cook
Inflatable friction rock bolts (IFRBs) are often considered temporary ground support due to their susceptibility to weakening from corrosion. The effective service life of an IFRB can be difficult to
Feb 1, 2023
-
Pilot-Scale Testing Of A 50-M-High Coal Air-Lift HydrohoistBy P. O. Lindahl
The U.S. Bureau of Mines initiated research to improve the safety and efficiency of transporting coal from deep underground mines using a balanced air-lift hydrohoist. A 50-m-high pilot-scale model wa
Jan 1, 1995
-
Leadville: A Look BackBy Dave Southworth
After Abe Lee discovered gold (in April 1860) near the site of present-day Leadville, Colorado, he and is group staked nearly all of California Gulch with "speculative claims." They did so in an eff
Jan 1, 1998
-
Selective Rock Fracture Induced by BlastingBy E. O. Jacobs
A coupled solid and rock fracture mechanics model is used to analyze the blast driven fracture propagation phase, predict propagation rates, and directly measure shockwave and particle velocity. The
Feb 23, 2014
-
Ventilation Practices At Rio Blanco Oil Shale's Tract C-A Mine - IntroductionBy Howard W. Earnest
The Rio Blanco Oil Shale Company completed a modified in situ oil shale retorting demonstration at its Tract C-a Lease in the Piceance Creek Basin of northwestern Colorado during the spring of 1982. T
Jan 1, 1983
-
Mantle Cells And MineralizationBy Wilfred Walker
Much is known of the geography of the Alpine orogeny because it has now ended and all geosynclines are in their terminal, cordilleran form. The principle of sea floor spreading, continental drift, and
Jan 1, 1971
-
Safety Factor Design Analysis: Integration of Bolts, Mesh, and Shotcrete Support in Weak Rock Masses, Turquoise Ridge Mine, NevadaBy L. Sandbak
"CURRENT BASIS OF GROUND SUPPORT DESIGN ANALYSIS The current strategy used in determining what kinds of support are needed is based on empirical design charts (Grimstad and Barton, 1993). Figure 1 is
Jan 1, 2017
-
Some Design Aspects Of Large Uranium Mills ? 1. IntroductionBy D. J. McParland
This paper will deal with some of the considerations which, were involved in the design and construction of the uranium mills in the Elliot Lake area . These plants, eleven in number, range from 1500
Jan 1, 1959
-
Dust To GoldBy D. Marino
Over the last 20 years, the manufacturing sector of our country has been called upon to comply with ever core stringent environmental standards. The primary metals sector was particularly hard hit ea
Jan 1, 1992
-
The Development of a Multiple Level Underground Limestone Mine from Geology through Mine PlanningBy Christopher Newman, Robert Dupuy, David Newman
"The development of a multiple level underground mine is a complex task in which geology, engineering, ground control, and unit operations are integrated into a single mine design. The components are
Jan 1, 2019
-
Prediction Of Sliding Force And Its Direction For Rock Excavation Using Key Block TheoryBy M. Z. Rashad
The intersection of joint sets and excavation planes leads to removable blocks which can be expected to fall or slide. The amount and cost of supports required to stabilize these blocks of excavation
Jan 1, 1993
-
A Successful Workers' Compensation Program For The 1980'sBy Douglas F. Stevenson
Your committee doesn't assign any easy topics to us speakers. How do you define "successful" in what is essentially a losing game? I am reminded of the fellow who returned from a one-week vacatio
Jan 1, 1986
-
A New Potential Standard in Monitoring and Optimizing Deposit Control in Mining Process WatersBy W. J. González
With the increasing demand for minerals and the decline in the quality of ore reserves, technologies to maximize recovery are critical to a mine?s economic success. Many mining waters exhibit the pot
Feb 23, 2014
-
Bench Scale Biochemical Reactor Treatment of Uranium, Radium, and SeleniumBy R. Schipper
Two bench scale biochemical reactors (BCRs) were operated over a period of 3 months for the removal of uranium, radium, and selenium from mining influenced water (MIW). A BCR is an anaerobic reactor c
Feb 23, 2014
-
Geological Engineering - A Bridge Between Geologist And Miner (8afd58c2-24dc-4731-abc4-ff77e99dff76)By Daniel R. Stewart
The function of the geological engineer is to assist in mine planning and operations by collecting, interpreting, and applying geologic data to the solution of engineering problems. The geologist supp
Jan 1, 1983