Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The risks, challenges and benefits of using social media in the mining industryBy Z. Mullard
The introduction of social media platforms has ushered in a new era of interaction and information exchange, which impact business-to-society relationships. Mining companies are closely watching these
Jan 1, 2011
-
Mining Engineering – Shovel and Excavator SurveyBy Lane White
In mid-April 1992, MINING ENGINEERING mailed a survey questionnaire relating to mining shovels and hydraulic excavators to 125 SME members working at surface mines or at the headquarters of companies
Jan 1, 1992
-
Slurry Shield Method In JapanBy Hisashi Takahasi, Hironobu Yamazaki
INTRODUCTION The slurry shield method was developed in Japan in 1963 and its experimental tunnelling work was performed in 1965. Although the history of this method is short compared with the conve
Jan 1, 1976
-
An Investigation Into The Hydrological Behaviour Of Exposed And Covered Waste Rock DumpsBy Bruno Bussière, Guosheng Zhan, Michel Aubertin, Vincent Martin, Robert P. Chapuis
The study evaluates the hydrological behaviour of exposed and covered waste rock dumps. The objectives were to determine the major factors influencing unsaturated flow in waste rock dumps and covers,
Jan 1, 2005
-
Enhanced Ex-Situ Mineral Carbonation At Ambient Conditions With Industrial WasteBy B. Spigarelli
Carbon dioxide sequestration by conversion to carbonates has become a promising option for CO2 storage. Experiments were conducted to determine the feasibility of CO2 sequestration at ambient conditi
Jan 1, 2012
-
Using Gridded Surfaces to Estimate Blasthole Delay Cost Near Protected StructuresBy T. Faulkner, S. A. Richards
"The Scale-Distance formula is one of the primary means of determining the maximum amount of explosives that can be safely detonated at one time by a single delay. This paper describes a method of app
Jan 1, 2016
-
New approaches detailed for gold exploration in the Canadian shieldBy H. R. Butler, J. F. Church, A. T. MacGibbon
Introduction Inco is the major North American nickel producer. Initially based in Sudbury, Ontario, its past exploration activity was directed toward finding new nickel deposits. New nickel sulfide d
Jan 2, 1987
-
Improved Ventilation And Water Sprays Reduce Auger Mining Dust LevelsBy Robert A. Jankowski, J. Drew Potts
The Bureau has identified several ventilation techniques and a water spray application for reducing auger mining dust levels. The dust control methods all work by improving air quantity or flow patter
Jan 1, 1989
-
Mine Equipment Maintenance And Inventory Control ? IntroductionBy John Jonkman
The cost of equipment maintenance is the largest single expense at many mines and processing plants. It is not unusual for a maintenance and repair budget to be larger than 50% of the punt's tota
Jan 1, 1986
-
METSI - Innovative solutions and technologies for management of mining related water in South AfricaBy R. Schwarz, E. Pusch, A. Juch
"The paper describes in general the objectives, goals as well as theoretical background of "METSI"-project proposal submitted to German BMBF (Federal Ministry of Education and Research). The METSI pro
Jan 1, 2011
-
Unstable shear slip failure and seismic potential investigation using DEM in underground miningBy Ping Zhang, Xu Ma
Perturbations from mining operations significantly affect the stability of rock masses, especially with the increase in mining depths. This study uses the discrete element method (DEM) to investigate
May 1, 2023
-
Real-Time Monitoring Of Cable Shovel Stress For Improved Machine HealthBy S. Frimpong
Cable shovel requires continuous monitoring through excavation to achieve reliability, longevity and economic usage. The operating environment and the stress and deformation fields on the front-end as
Jan 1, 2006
-
Tailings filtration using Viper Filtration technology – a case studyBy PETER ROBINSON, KEVIN BARBER, OLIVER WHATNALL
The investigation and uptake of filtered tailings continues to grow around the world, but cost and scalability are deterrents for mining companies. Filtration technology that is currently in use is un
-
Sampling Practices And Problems ? IntroductionBy Mark Springett
The problems inherent in sampling low- grade deposits have long been recognized. As economic grades become lower with increasing metals prices and improvements in recovery technology then the previous
Jan 1, 1983
-
Discussion - Copper and Its Byproducts Technical Papers, MINING ENGINEERING, vol. 35, No. 4, April 1983, p. 343-347By M. Lonoff
G. Campbell The paper by M. Lonoff looks at the importance of byproduct prices on copper production. The paper develops several interesting points on this topic, but there are some points in the theo
Jan 11, 1983
-
Mini Symposium ? Mill Design And Grinding Performance Of Large Ball Mills I ? Mill Design - Grinding Performance Of The Ball Mill At The Dizon Operation Of Benguet CorporationBy Eduardo M. Sacris
The performance of the grinding circuit, from the initial stages of operation to the present, is discussed. The mill efficiency as measured by the Bond grindability data and the operating work index i
Jan 1, 1983
-
La Ciénega – A New Gold Mine in MexicoBy F. Grajales Muñoz
The Ciénega project, now under construction by Peñoles group, is located in the mountains of northwest Durango, Mexico. The gold and silver deposits are found in a 4-km (2.5mile) long system of veins.
Jan 1, 1994
-
Influence of blasting techniques on open pit economicsBy H. G. Naidu, Raj K. Singhai, S. P. Singh
Introduction The economics of open-pit mining de¬pend heavily on the cost of overburden removal. It is necessary to maintain a pit slope as steep as possible. Steeper slopes lower the volume of overb
Jan 1, 1989
-
Critical Considerations in Robotic Seabed DrillingBy Steve Stuart
Deep-sea mineral SMS deposits present some of the world’s most challenging conditions for drilling equipment. As robotic seabed drilling services mature so too the ways that clients engage with servic
Sep 1, 2014
-
Extensive Mechanization Produces Record Performance In Drill-Blast TunnellingBy Hans Hamrin
Three drill-blast cycles of 3.1 m advance achieved in one working shift of 7.5 hours at the Holsfjorden Tunnel project in Norway. The tunnel, 5235 m long, with a cross section of 8.6 m2, was completed
Jan 1, 1987