Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Recovery of Copper from Industrial Waste Solutions by Cementation Using a Rotating Fixed Bed of Stacked Steel Screens Mining, Metallurgy and Exploration (49f84ae3-0f8b-4994-9964-9738b8967d3e)By G. H. Sedahmed, S. A. Nosier, M. H. Abdel-Aziz, A. A. Mubarak, M. A. El-Naggar, E. G. Abdel-Aziz
The performance of a rotating fixed bed reactor in recovering copper from industrial waste solutions by cementation is studied under various conditions. The rotating fixed bed is made of stacked woven
-
Recovery of Copper from Industrial Waste Solutions by Cementation Using a Rotating Fixed Bed of Stacked Steel Screens Mining, Metallurgy and ExplorationBy G. H. Sedahmed, S. A. Nosier, M. H. Abdel-Aziz, A. A. Mubarak, M. A. El-Naggar, E. G. Abdel-Aziz
The performance of a rotating fixed bed reactor in recovering copper from industrial waste solutions by cementation is studied under various conditions. The rotating fixed bed is made of stacked woven
-
Comparison Of Field Measurements With Finite Element Results--Capitol Hill Relief Sewer Section II (Washington, D.C.) --By Delon Hampton, Francis K. Mensah-Dwumah
INTRODUCTION The state-of-the art in the area of soil-structure interaction is not sufficiently developed that one can accurately predict the earth load distribution on buried structures. This lack
Jan 1, 1979
-
A Petroleum Industry Approach To Coal Mine Gas DrainageBy J. Sandford, S. Hennings
EXECUTIVE SUMMARY An approach borrowed from the petroleum industry was applied to the gas development evaluation for the Bulga underground coal mine in New South Wales, Australia. The results enabled
Jan 1, 2007
-
Planning of Ventilation and Air-Conditioning at the Mindola Mine, Copperbelt of ZambiaBy M. Guney, A. R. Bell
In Mindola mine on the Zambian Copperbelt, there is a plan to extend the current production level of 1.2-1.5 km (3,900-4,900 ft) with five additional production levels. Research work indicated that th
Jan 3, 1984
-
The Spillway Dilemma For Mine Tailings ClosuresBy T. Clarkin
This paper presents a hydrologic closure design concept to minimize the risk of water discharges from closed mine tailings facilities. It evaluates the applicability of U.S. Nuclear Regulatory Commiss
Jan 1, 2012
-
EPB Tunnelling Through Cohesionless Saturated Ground Under Very Shallow Cover?Perth New Metrorail City ProjectBy Hiroshi Yamazaki
The paper describes prediction, control and validation of face pressures, and special TBM features for the bored tunnels of the New Metro Rail City Project, Perth, Australia. The selected EPB-TBM pass
-
Exploratory Shafts For The Nuclear Waste Repository In BasaltBy Birger Schmidt
INTRODUCTION Conceptual design of the first Exploratory Shaft (ES-I) for the Nuclear Waste Repository in Basalt (NWRB) began in July 1981; detailed design began in February 1982, and was largely co
Jan 1, 1987
-
Copper Heap Leach Pad Performance: Geotechnical Lessons Learned Evaluation Of Several Heaps After 3 Plus Years Of ServiceBy C. J. Burkhalter, H. Andrade, T. C. A. Gardner, J. P. Campbell
During the 1990’s several copper heap leach facilities treating crushed and agglomerated oxide and sulfide ore were constructed in South America. The majority of these facilities have been in operatio
Jan 1, 2002
-
Development of Environmental Performance Indicators based Environmental Management Systems for Steel IndustryBy A. K. Dikshit, H. R. Murty, S. K. Gupta
This paper deals with the development of environment performance indicators (EPIs) for the steel industry. Environmental performance has become one of the key measures of business success. Emergence o
Jan 1, 2005
-
Design And Testing Of Multi-Channel Borehole Geophone ArrayBy E. C. Westman, F. J. Shreve
This paper presents the design and construction of a multi-channel geophone array that improves tomographic imaging capabilities in both surface and underground mines. Especially important in the des
Jan 1, 2002
-
Hydrometallurgical Process To Recycling Used Waste Silver Paste - Preprint 09-040By N. S. Kim
Silver paste including nano sized particles maintains conductivity in high temperatures without forming oxide layers. In the industry, printing process produces wasted silver paste inside the cylinder
Jan 1, 2009
-
Selective Water Leaching of Sulfated Rare Earth Ore and Impurity Removal from a Rare Earth Sulfuric Liquor Mining, Metallurgy and ExplorationBy Éder Domingos Oliveira, Carlos Antonio Morais, Ruberlan Gomes Silva
The objective of this work was to assess the influence of parameters such as residence time, solid content, and temperature in a process route towards purified rare earth liquor which could be adequat
-
Construction Of The Pacheco Pumping Chamber And ShaftsBy Russell Clough
The Pacheco Pumping Plant is situated on the west end of San Luis Reservoir in western Merced County, California. It is designed to draw water from the reservoir and pump it into a 3,500,000 gallon re
Jan 1, 1985
-
Mining Foundation of the Southwest Honors Year 2000 InducteesThe 18th annual American Mining Hall of Fame Awards Banquet sponsored by the Mining Foundation of the Southwest will be held on Saturday, Dec. 2, 2000 at The Westin La Paloma in Tucson, AZ. The 200
Jan 1, 2000
-
Remediation Of Historical Smelter Contamination Midvale Slag Superfund Site - Operable Unit One Midvale, Ut - Introduction - Preprint 09-012The Midvale Slag Site covers 300 acres in Midvale, Salt Lake County, Utah. Midvale (population 10,000) is part of the Salt Lake City metropolitan area (population 936,000). Between 1902 and 1971, Un
Jan 1, 2009
-
Technical Note - SO2 abatement in a 440-kW pilot-scale combustor —limestone injection testsBy G. H. Lewis, C. L. Krcil, N. S. Harding, D. E. Havekotte
Introduction Limestone injection work was completed in a 440-kW (1.5-million Btu per hour) pilot-scale combustor in preparation for a 50,000-kg/h (110,000-lb per hour) industrial steam boiler limes
Jan 12, 1986
-
Some Mitigative Measures for Protection of Surface Structures Affected by Ground SubsidenceBy L. You
Theoretical and analytical analyses of three mitigative measures- plane fitting method, trenching, and tension cable led to the development of a total protection plan to eliminate or reduce damages to
Jan 1, 1986
-
Use Of Geologic Structure In Room-And-Pillar Design ? IntroductionBy David E. Nicholas
Design of underground openings is becoming more critical as the mine deposits become lower in grade, initial investments increase, ore depth increases, additional safety regulations come into law, and
Jan 1, 1976
-
Dissolution Behavior Of Silver/Silver Oxides In Ammoniacal SolutionsBy K. N. Han, N. S. Kim, H. Yoon, J. S. Sohn
The leaching behavior of silver and silver oxides in ammonical solutions has been studied. The current study is concerned with an effective recovery of silver from secondary sources such as spent silv
Jan 1, 2002