Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Desarrollo Del Flujograma MetalurgicoBy Robert A. Wilson
Los primeros pasos básicos para determinar los valores reales y los minerales concernientes, que son la base para las pruebas metalúrgicas, son presentados en este capítulo. A continuatión, eligiendo
Jan 1, 1982
-
3. Production Grade Control - A Case Study on Data Base Development ? HistoryBy Barton Kelby Cross
In the early 1960's the feasibility of mathematical modeling was demonstrated in Northern Rhodesia and southwestern United States, where techniques were developed to use these models in a new app
Jan 1, 1979
-
Ventilation Planning and Design of the Skyline MinesBy Keith G. Wallace, Robert Wise, Ian J. Duckworth
This paper describes a case study for the ventilation planning at Utah Fuel Company's Skyline Mines which are located outside Price. Utah. The Skyline Mines are currently comprised of two longwal
Jan 1, 1995
-
Nutritional And Physical Aspects Of Plant Establishment On Mine WastesBy Willaim A. Berg
Vegetative stabilization can help meet the esthetic objections and pollution problems posed by mine wastes. However, mine wastes are often unfavorable growth media and special treatments and technique
Jan 1, 1970
-
Central Refrigerating Plants For Air Conditioning In The Mines Of Ruhrkohle AG - IntroductionBy Eduard Hamm
The main reasons for the development of higher heat levels in German coal mines are the increasing depth of working with the con- sequent higher rock temperatures, increased use of electrical equipmen
Jan 1, 1980
-
An Investigation Of The Causes Of Roof Falls In A Deep Underground Coal MineBy Wen H. Su
Extensive investigation has been conducted to determine the causes of a series of roof falls occurring in a room-and-pillar working located in southern West Virginia. Underground observation, along wi
Jan 1, 1984
-
Geology Of The Black Fox Mine Matheson, Ontario, CanadaBy E. J. Berentsen, R. F. Nanna, D. Dell’ Elce, R. Lougheed
Apollo Gold’s Black Fox project is located 10 km (6.2 miles) east of Matheson, Ontario, Canada, on Hwy 101 East It is located within the prolific Destor Porcupine Fault Zone, which is also the host fo
Jan 1, 2004
-
Evaluating those factors that influence escape from coal mine firesBy F. N. Kissell
The US Bureau of Mines undertook a study of those factors influencing worker escape from an outby coal mine fire. The results of this investigation were two-fold. First, those factors affecting escape
Jan 1, 1990
-
Managing a Cost Reduction Program - Methods Of Reducing CostsCost reduction programs can focus on total cost or unit cost, but unit cost is usually the principal objective. The production cost per unit is: [Unit cost = Total cost Produ
Jan 1, 1999
-
Development of a preliminary methodology for determining maximum economic recoveryBy H. Maleki, G. Tetreault
This study was initiated by the US Bureau of Land Management (BLM) to develop guidelines for determining the maximum economic recovery of resources in coal mines. The work was in response to a require
Jan 1, 2002
-
Producing Portland Cement In Hawaii With Limited Raw MaterialBy K. T. Mau
Hawaii is located approximately 2,500 miles from the mainland, but has basic needs for its thriving developing community. Cement is one of these needs Cement production in Hawaii is not without han
Jan 1, 1982
-
The Coal Quality Expert: Introduction To The Acid Rain AdvisorBy C. D. Harrison, G. S. Stallard
The 199O Clean Air Act Amendments specify national objectives for reducing sulfur dioxide emissions from coal fired power plants. System-wide reductions can be achieved by combining various emissions
Jan 1, 1993
-
Use of water-ground mica in polyolefinsBy A. C. Kunkie, C. J. Marshall
Highly delaminated muscovite mica products (WG-1 and WG-2) have been developed by J.M. Huber Corp. The micas are characterized as a 325-mesh product having high brightness and very narrow particle siz
Jan 1, 1988
-
Use Of High-Resolution Ground-Penetrating Radar In Kimberlite Delineation (96408a3d-7aea-4636-b686-0c7e31605682)By J. M. Kruger
High-resolution ground-penetrating radar (GPR) was used to image the near-surface extent of two exposed Late Cretaceous kimberlites intruded into lower Permian limestone and dolomite host rocks in nor
Jan 1, 1997
-
A Program For Ore Control In The Central Florida Phosphate DistrictBy Richard C. Fountain
The Central Florida Phosphate District is located in southwestern Polk, southeastern Hillsborough, Manatee, and Hardee Counties, Florida, flanking the.southern end of a major structural uplift known a
Jan 1, 1972
-
Wire Ropes For Mines - Selection, Installation, Inspection, And Maintenance - SelectionBy Robert E. Goodwin
There are four main requirements which must be considered when selecting a wire rope for the best serviceability. A proper choice is made by correctly estimating the relative importance of each of the
Jan 1, 1968
-
Analytical Methods For Applied GeologyBy G. Jim Cardwell
The question "what constituents should be determined?" is one that defies a simple answer, because earth scientist being what you are, the rock and mineral analyst will eventually be called upon to de
Jan 1, 1983
-
Solvent Sublation - A Non_Foaming Adsorptive Bubble Process For Separation Of Waste StreamsBy Kalliat T. Valsaraj, Louis J. Thibodeaux
A mathematical model is described for the transfer of hydrophobic compounds from aqueous to an immiscible organic phase using fine bubble aeration; the process otherwise known as "solvent sublation" a
Jan 1, 1989
-
Use Of High-Resolution Ground-Penetrating Radar In Kimberlite DelineationBy J. M. Kruger, P. Berendsen, A. Martinez
High-resolution ground-penetrating radar (GPR) was used to image the near-surface extent of two exposed Late Cretaceous kimberlites intruded into lower Permian limestone and dolomite host rocks in nor
Jan 1, 1998
-
How Good Is My Maintenance Program?By John D. Katsllometes
In the mining and processing industry, the maintenance plan has often evolved rather than being consciously set up resulting in an overreliance on breakdown and fixed-time maintenance (planned mainten
Jan 1, 2004